Loading…
Loading…
2,432 results • Best match
Removing old deteriorated UGD Lines & replacing with New UGD Lines construction of cabel duct for Sub-Station, construction of rain water harvesting & other allied works at MEIL Bangalore.
Package-6 Repairs and Annual Maintenance of UGD pipeline and Machineholes in ward no.14, 27 and 28 under WS and UGD East sub division-2, Mysuru city
Unbranded Class F SS304 Submersible Sewerage Pump, Capacity, Unbranded Class F SS304 Submersible Sewerage Pump, Capacity 15 liter/hour
Zonal No.07 UGD Connection of missing links to sewerage network that prevents sewage and grey water from entering the Tholanakere canal in Ward No. 30 and to deliver the used water to the wet well and the used water purification unit.
REPAIRS TO AREA DRAINS, SEWAGE LINES, MANHOLES, COVER SLABS, HUME PIPE CULVERTS INCLUDING CLEANING OF CHOCKED SEWAGE LINES AND MANHOLES ETC AND OTHER CONNECTED MAINTENANCE WORKS UNDER GE BELGAUM.
Construction/upgration of sewerage system in Robertsonpet
Analyzing the existing and proposed UGD system by Conducting detailed survey, preparation of Hydraulic design, Structural designs and Drawings for civil structures of the UGD system components, preparation of DPR for 2nd stage UGD scheme to Malur city under deposit contribution works of CMC, Malur city
REPAIRS CLEANING OF SEWAGE LINES MANHOLES IN AOR OF GE (SOUTH) BANGALORE
Purchase and fixing of manholes covering slab for CMC area man holes
Package-5 Repairs and Annual Maintenance of UGD pipeline and Machineholes in ward no.9, 15, 16 and 29 under WS and UGD East sub division-2, Mysuru city.
Package-4 Repairs and Annual Maintenance of UGD pipeline and Machineholes in ward no.10, 11, 12 and 13 under WS and UGD East sub division-2, Mysuru city.
Annual maintenance of emergency UGD works in ward nos. 3, 4, 5, 11, 12, 13, 14, 15 and 16 of Sub-Division-01 (UGD) of Shivamogga City Corporation limits.
Package-7 Repairs and Annual Maintenance of UGD pipeline and Machineholes in ward no.32, 37, 38 and 39 under WS and UGD East sub division-3, Mysuru city.
Construction of UGD for linking of UGD water to existing wet wells in Harihara municipal limit at Banashankari temple millath circle KEB Opposite, Revanna Siddeshwara temple and Halladkere wetwells.
Construction of CC Road and Underground Drainage from Govt Higher Primary School to Graveyard and CC Road from OHT Tank to GHP School in Mylapura Village In Siruguppa Taluk Ballari Dist
crompton Class F Stainless Steel Submersible Sewerage Pump,, crompton Class F Stainless Steel Submersible Sewerage Pump, Capacity 18720 liter/hour
FALCON Class F Stainless Steel Submersible Sewerage Pump,, FALCON Class F Stainless Steel Submersible Sewerage Pump, Capacity 31200 liter/hour
Unbranded Class H Cast Iron Submersible Sewerage Pump,, Unbranded Class H Cast Iron Submersible Sewerage Pump, Capacity 5489 liter/hour
Unbranded Class F Cast Iron Submersible Sewerage Pump,, Unbranded Class F Cast Iron Submersible Sewerage Pump, Capacity 30 liter/hour
Unbranded Class F Cast Iron Submersible Sewerage Pump,, Unbranded Class F Cast Iron Submersible Sewerage Pump, Capacity 30 liter/hour
UGD work in ward no 6 and 19 at belur town limit
Laying UGD line in jantha nagara 2nd cross at ward no 76
ANNUAL MAINTENANCE OF UGD LINES FOR ALL WARDS IN MANDYA CMC LIMITS.
Laying UGD and CC paving in Panduranga colony at ward no 60
Providing UGD Line near wetwell in Anjinappa nagar Roopangudi road Ballari(SC)
Maintenance of UGD System in ward no.16, Vijayapura City corporation Limit.
UGD Repair work at ward no 18 to 35 in Chitradurag City
Construction of UGD & Open drain near Namma clinic Hospital in w.no. 17
Maintenance of UGD System in ward no.15, Vijayapura City corporation Limit.
Operation and Maintenance of Robotic UGD Machine hole Cleaning System (Bandicoot Robot)
Supply and fixing af UGD Rings and Covers in Hosapete City Limit
YEARLY MAINTAINANCE OF UGD IN WN 01 TO 15 IN CMC JAMKHANDI
UGD Maintanance for the year of 2025-26 at ward no. 58
Construction of UGD pipe line Venkataramana temple cross road in Karamballi ward
UGD Work in ward no. 21 beyond renuka theatre Belur town limit
Restoration TO UGD CUTTING PORTION OF CHAMARAJA DOUBLE ROAD IN WARD 50
YEARLY MAINTAINANCE OF UGD IN WN 16 TO 31 IN CMC JAMKHANDI
Regarding laying of ugd line at valvekar galli in ward no 64
Site Clearance,De-Silting,Fencing Pole And UGD Works Of STP Land
Construction of UGD line and Borewell in Sub Prison Nanjangud Town, Mysore.
Providing and laying ugd line at shirur park in ward no 48
Maintenance of UGD in Ward No 33 of Vijayapura City (General Fund)
Construction of UGD line Ambagilu-perampalli main road in Udupi CMC limit
Providing the UGD connection to others poor People houses in Kolhar town
UGD Maintanance for ward no. 43 for the year of 2024-25
Construction of UGD Work at Ward no 19 Channabasava Nagar at Basavanabagewadi
Construction of UGD Pipeline Work at Ward No 15 In Nagamangala TMC
Providing Patch on UGD line in Anchatageri Oni at ward no 65.
Construction of UGD line B.B. Nagara 2nd cross road in Kinnimulki ward
UGD Repair work at ward no 1 to 17 in Chitradurag City