Loading…
Loading…
4,064 results • Best match
As per NIT Document
Remaining Internal Repair works of 200 cusec RCC viaduct and its expansion joints b/w Manhole No 32 to 33 under Delhi Water supply Maintenance Scheme.
REAPIR/MAINT AND CLEANING OF SEWAGE LINE, DRAIN, CULVERT, TRAPS, MANHOLE AND OTHER ALLIED WORKS IN TECH AREA AND OFFRS ENCLAVE AND TMQ AREA AT 24ED
CLEANING AND MAINT OF SEPTIC TANKS, SOAKAGE WELLS, SEWAGE LINES, MANHOLES, PATH, FENCING BOUNADRY WALL, GATE AND MISC ITEMS IN ARC AND AIRWING AREA SARSAWA UNDER GE AF SARSAWA
Submersible Sewerage Pump (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6929393 Dated : 25-11-2025 Bid Document 1/5 Number of Auto Extension count 1 Past Performance 30 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 393000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
COMPLETION OF INCOMPLETE WORK FOR PROVISION OF CENTRAL SEWAGE SYSTEM AT MEERUT (SEWER INCL LIFT WELL n SERVICES)
Construction of A Type Kendriya Vidyalaya G1 4 Nos Type II Qtrs G 1 4 Nos Type III Qtrs G 1 1 No Type V single storey Boundary wall including external sewerage water supply rain water harvesting Internal Road and Footpath Internal Electrical Installation Compound Lighting Service Connection Down comer System etc at Chitrakoot SH Hiring of Inspection vehicle for EE E ACED CPWD Allahabad Office
Construction of Research Lab Complex Building, Basement plus Four storey with mezzanine floors including plumbing sewerage system internal and external Electrical works Firefighting Fire alarm Public address system Building Management System Lift HVAC external Development pathways all complete and all other related works to make the building function on Engineering Procurement and construction EPC basis at IIT Campus Kanpur SH SITC of 2 x 160 KVA UPS
C/o A-Type Kendriya Vidyalaya G Plus 1, 4 Nos. T-II Qtrs. G Plus 1, 4 Nos. T-III Qtrs. G Plus 1, 1 No. T-V Single Storey, Boundary wall, including External Sewerage, Water Supply, Rain Water Harvesting, Internal Road and Footpath, Internal Electrical Installation, Compound Lighting, Service Connection, Down Comer System etc. at Mirzapur, U.P. SH - Pdg. Services for Skilled and Unskilled Staff.
Special repair work of main Hospital building, ANM Centre, dispensary building, Pakshala, Residential quartes (1-Type-V, 9 - Type-IV, 8- Type -III quarters and one Matrons quarter), generator room, roads, sewerage system, water supply system, drainage system, and construction of Lift, parking shed, underground fire sump in ESIC Hospital campus at Modinagar (U.P.). (SH - Submission of Architectural structural and services designs drawing for electrical work).
TRACTOR, TRACTOR TROOLY, HYDRAULIC TIPPER, MS CONTAINERS, WATER TANKER, HYDRAULIC E CART, FOGGING MACHIENE, MOBILE TOILET, SEWER SUCTION MACHIENE
OPERATION and MAINTENANCE OF WATER TREATMENT PLANT (WTP) including cleaning of sewer chambers, water tanks at SAI NSRC Lucknow
Repair and Overhauling Service - Repair & Maintenance of Water Storage Tank; Repair & Maintenance of Water Storage Tank; No; Buyer Premises, Repair and Overhauling Service - Repair & Maintenance of Sewerage Tank; Repair & Maintenance of Sewerage Tank; No; Buyer Premises, Repair and Overhauling Service - Supply of Toilet Cleaning Materials; Supply of Toilet Cleaning Materials; No; Buyer Premises
DISC OF BOTTOM VALVE, GROUND UNIT GASKET MAIN BODY, EMCO GASKET COVER, PNEUMATIC LINE FILTER, HOSE REEL GLAND PACKING, COVER GASKET FOR FILTER WATER SEPERATOR, TANK MANHOLE GASKET
Annual sweeping, cleaning of roads, drains, sewerage system, sanitation and water supply of residential and non-residential building of CISF colony, Obra, Sonebhadra
REPAIR OF PATH HARD STANDING DRAIN AND CULVERT INCLUDING REPAIR TO SECURITY FENCING BOUNDARY WALL AND CLEANING MAINTENANCE OF SEWAGE LINES MANHOLES SEPTIC TANK INCLUDING SANITARY FITTINGS AND OTHER CONNECTED WORKS
WELCOME MAINTENANCE, PERIODICAL SERVICES, MISC REPAIRS TO CERTAIN BUILDINGS AND CLEANING OF SEWAGE LINES, SEPTIC TANKS, SOAK WELL AND MANHOLES AT CQA(I) RAIPUR DEHRADUN UNDER GE(I) (P) FY KANPUR.
Please Refer to tender document
As Per Tender Documets
Please refer Tender documents.
Special repair work of main Hospital building, ANM Centre Dispensary building Pak Shala, Residential quarters One type V 9 Type IV 8 Type III quarters and one matrons quarter Generator Room Roads Sewerage system Water Supply System Drainage System and Construction of Lift Parking shed Underground Fire Sump in ESIC Hospital Campus at Modi Nagar UP SH Submission of Architectural structural and services designs drawings Subwork/Packages: Civil works buildings
Development works, Road, Drain, Sewer, Water Supply and Park in sector-3(Part), Scheme No. 11, Jagriti Vihar (Ext.), Meerut.
Development works, Road, Drain, Sewer, Water Supply and Park in sector-3(Part), Scheme No. 11, Jagriti Vihar (Ext.), Meerut.
Development works, Road, Drain, Sewer, Water Supply and Park in sector-2(Part), Scheme No. 11, Jagriti Vihar (Ext.), Meerut.
Development works, Road, Drain, Sewer, Water Supply and Park in sector-2(Part), Scheme No. 11, Jagriti Vihar (Ext.), Meerut.
Development works, Road, Drain, Sewer, Water Supply and Park in sector-3(Part), Scheme No. 11, Jagriti Vihar (Ext.), Meerut.
Development works (Road, Drain, Sewer and Water Supply) in PMAY Pocket sector-8A, Scheme No. 11, Jagriti Vihar (Ext.), Meerut.
Development works, Road, Drain, Sewer, Water Supply and Park in sector-2(Part), Scheme No. 11, Jagriti Vihar (Ext.), Meerut.
Development works (Road, Drain, Sewer and Water Supply) in PMAY Pocket sector-8A, Scheme No. 11, Jagriti Vihar (Ext.), Meerut.
Development works, Road, Drain, Sewer, Water Supply and Park in sector-3(Part), Scheme No. 11, Jagriti Vihar (Ext.), Meerut.
Custom Bid for Services - 200147531 Biennial Contract for Housekeeping, Sanitation Services & Sewerage line maintenance at NTPC Singrauli Similar Category Manpower Outsourcing Services - Minimum wage
Submersible Sewerage Pump (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7160013 Dated : 28-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Past Performance 50 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 10000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Executive Officer Nagar Panchayat Tulsipur, Urban Development Department Uttar Pradesh, N/A, (Executive Officer) 2/6
C/o A Type KV G Plus 1, 4 Nos. T-II Qtrs. G Plus 1, 4 Nos. T-III Qtrs. G Plus 1, 1 No. T-V Single Storey, Boundary Wall i/c external sewerage, water supply, rain water harvesting, internal road and footpath, IEI, compound Lighting, service connection, downcomer system etc. at Bhadohi, UP. SH - Pdg. services of computer operator and office assistant in sub-division office.
CLEANING AND MAINT OF SEPTIC TANKS, SOAKAGE WELLS, SEWAGE LINES, MANHOLES AND MISC ITEMS WITH REPAIR/ MAINT OF B/R WORKS IN E/M INSTALLATIONS AT AF STATION SARSAWA UNDER GE (AF) SARSAWA
Essential Civil Maintenance Works such as Plumbing, Sanitary and Sewerage works etc for all hostels,Admin buildings Staff quarters in the jurisdiction of ALTTC Ghaziabad
Essential Civil Maintenance Works such as Plumbing Sanitary and Sewerage works etc for all hostels Admin buildings Staff quarters in the jurisdiction of ALTTC Ghaziabad
Road Resotration Sewer repairing work , Line electrification Replacement of STP Pole NSEZ Noida Under EUDD-II Noida. in Full deposit scheme
Construction of 250 Nos. Type-II Qtrs. (S plus 6), in EPC Mode 1, at CISF SSG Campus Greater Noida (UP). (SH: Civil works i/c internal water supply and sanitary installations, sewerage system, drainage & development of site, electrical works i/c internal and external electrical installations, Sub-Station, DG sets, fire fighting system, automatic fire alarm and lifts, water supply system, external development works, horticulture works & other Misc. works.) Subwork/Packages: Civil and Electrical
REAPIR TO PARTH HARD STANDING DRAIN AND CULVERTS INCLUDING REPAIR TO SECURITY FENCING AND LEANING MAINTENANCE OF SEWAGE LINES MANHOLES SEPTIC TANK INCLUDING SANITARY FITTINGS AND OTHER CONNECTED WORKS IN TECH AREA AND NEW PROJE
Precast Concrete Manhole Cover and Frame (V3) Conforming to IS 12592 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7017688 Dated : 18-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Past Performance 30 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1000000 Payment Timelines Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 30000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/7 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Nagar Panchat Obra, Nagar Panchat Obra, Urban Development Department Uttar Pradesh, N/A, (Executive Officer)
Precast Concrete Manhole Cover and Frame (V3) Conforming to IS 12592 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7014987 Dated : 18-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Past Performance 30 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1000000 Payment Timelines Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 30000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/7 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Nagar Panchat Obra Nagar Panchat Obra, Urban Development Department Uttar Pradesh, N/A, (Executive Officer)
Precast Concrete Manhole Cover and Frame (V3) Conforming to IS 12592 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7017425 Dated : 18-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Past Performance 30 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1000000 Payment Timelines Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 30000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/7 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Nagar Panchat Obra Nagar Panchat Obra, Urban Development Department Uttar Pradesh, N/A, (Executive Officer)
Precast Concrete Manhole Cover and Frame (V3) Conforming to IS 12592 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7017829 Dated : 18-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Past Performance 30 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 30000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/7 Beneficiary : Nagar Panchat Obra, Nagar Panchat Obra, Urban Development Department Uttar Pradesh, N/A, (Executive Officer)
Precast Concrete Manhole Cover and Frame (V3) Conforming to IS 12592 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6986440 Dated : 12-12-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 30 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 12 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 30000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/7 Beneficiary : Nagar Panchat Obra, Nagar Panchat Obra, Urban Development Department Uttar Pradesh, N/A, (Executive Officer)
C/o A-Type K.V. G Plus 1, 4 Nos. T-II Qtrs. G Plus 1, 4 Nos. T-III Qtrs. G Plus 1, 1 No. T-V Single Storey, Boundary wall, i/c external sewerage, water supply, rain water harvesting, internal road and footpath, internal electrical installation, compound lighting, service connection, down comer system etc. at Mirzapur, U.P. SH - Providing services of computer operator and office assistant in sub-division office.
CONSTRUCTION OF PHASE-B WORK COMPRISING OF 0.75 BOYS DORMITORY (G PLUS 2), 0.25 GIRLS DORMITORY (G), 6 NOS. TYPE-III QTRS (G PLUS 2), 4 NOS. TYPE-III QTRS, PLUS 2 NOS. WARDEN RESIDENTIAL (G PLUS 2), 5 NOS TYPE-II QTRS (G PLUS 2), 1 NO. VICE PRINCIPAL ... EXTERNAL SEWERAGE , ...
Day to day Sweeping and Cleaning work Sewerage System in BSNL Staff Quarters Compound at Lakhanpur under CSC Lakhanpur Kanpur during 2020 21 (Extended to 2021 22
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Installation of 200ft pipeline between septic tank to sewer; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; installation of 200ft pipeline between septic tank to sewer; Service Provider
Disc of Bottom Valve, O Ring Bottom Valve, Ground Unit Gasket, Filtering Monitoring O Ring, Hose Reel Gland Packing, Pneumatic Line Filter, Cover Gasket for filter water separator, Gasket Cover, Tank Manhole Gasket