Loading…
Loading…
1,131 results • Best match
Soil investigation works(Boring)
soil investigation work 3boreholes
Soil investigation for Aqueduct
mobilization setting up boring with rotary power drilling up to 20m depth SPT taken up to 6m at 1m interval or for balance depth as usual 3 Nos of UDS samples for each borehole recovering disturbed undisturbed samples total station surveying
Conducting Final Location Survey (FLS)/ Detailed field survey for the following: i. Final location survey for 3rd line between TVC-NCJ & other New line/Doubling/future projects including soil investigations. ii. Detailed field survey & preparation of ... including soil investigation for ... including soil investigation for ...
Traffic Survey, Soil Collection and Testing, BBD, Pavement Composition Details,Topographic Survey, Inventory and Subsoil Investigation
Traffic Survey, Soil Collection and Testing, BBD, Pavement Composition Details,Topographic Survey, Inventory and Subsoil Investigation
Investigation work - Total station survey, soil exploration, CBR, Traffic study
G E N E R A L - R E G I S T R A T I O N DEPARTMEMENT-SUB REGISTRAR OFFICE KANNUR-SOIL INVESTIGATION WORK-Construction of building for Sub Registrar office Kannur-Investigation Work
GENERAL Investigation estimate GHSS Sankaramangalam General Education Department Annual Plan 2021 22 Construction of School building for the High School Wing of the Govt Higher Secondary School Sankaramangalam Kollam Part TSInvestigation Work
Construction of additional room for Cyclic Triaxial testing setup in Geotechnical Engineering Laboratory
6no. Boreholes are proposed for a depth 42.50m.The provisions included in this soil investigation Estimate are Mobilization,Setting up bore,Rotary drilling at various depths,Drilling Hard rock,SPT,Collecting samples,Compilation of Field data etc.
Mental Health Centre-Annual plan 20-21- Additional fund for construction of GLR, Water tank and new arrangement of new water supply line and other allied works (Soil Investigation)
This Estimate includes Boring with Rotary Power drilling Equipments 2 bores up to 0 to 10 m depth and 1 bore up to 12 m depth as the soil surrounding is pure laterite
Mobilization of tools and plants soilinvestigation details of 2 nos of boreholes in all class of soil soft rock hardrock conduction of SPT and collection of soilsamples for lab test ncluding recommendation of foundation from Geotechnical Engineer
Total Station Survey and Soil Investigation-Govt. L.P School Kurichiarmala at Pozhuthana Panchayath, Construction of School Building for Govt. UP School at Erumakolly in Meppadi Panchayath, Govt. LP School Puthumala.-Investigation Work
GENERAL Department of Labor and Skills Industrial Training Department Construction of new building for Plumber Trade Workshop in Government I T I Chenneerkara Pathanamthitta Soil Investigation and Total Station Survey Investigation Work
GENERAL-Soil investigation at the proposed site for the setting up of new building for Respiratory medicine at Institute of Chest Disease attached to Govt.Medical college Kozhikode-Part TS-Work-Investigation Work
GENERAL - Construction of Bund Road Madhupalom to Punchakkari Bridge with Retaining wall in Nemom LAC - Phase 2 (Priliminary soil investigation Ch.0/400 to 1/000) Part TS - investigation work Investigation Work
Jal Jeevan Mission (JJM)-JJM-Phase 3-CWSS to Edappal and adjoining Panchayaths-Site Clearing and conducting of soil investigation of Proposed OHSR Site at PALAPRA KUNNU in Vattamkulam Panchayath-Investigation Work.
Wayanad Development Package-Wayanad Development package (2024-25) Soil investigation and Total Station Survey Work - Construction of School Building at Govt. High School, Athirattukunnu in Poothadi GP - Investigation Work-General Civil Work
Annual Plan-TLP 2022-23 SO148/23 Soil Test.(For Construction of Chakkala SC Colony Cultural Center in ward 14 in Thalayolaparambu Panchayat)-General Civil Work
Geotechnical investigations along the corridor between Thiruvananthapuram to Thrissur and Geological and Geophysical surveys at Tunnel sections between Thiruvananthapuram to Kasaragod for Semi High Speed Rail Corridor SilverLine
Feasibility study by conducting Impact Assessment and Soil Investigation for the construction of new 10000 MT Ammonia Storage Tank and allied structures at WI near FACT Ammonia Berth and Q4 berth, as per tender documents.
GENERAL-RENOVATION OF JAILS- ANNUAL PLAN (2025-26) Soil investigation work for the reconstruction of the damaged retaining wall at the boundary portion of Central prison and correctional home, Thavanur in Malappuram District
Health and Family Welfare Department Government Medical College Kozhikode Implementation of Annual Plan Scheme for 2020 2021 Construction of Hostel for House Surgeons Soil Investigation work For part TS Work General Civil work
GENERAL P. W. L. P. S Pavukkara, Mannar General Education Department Annual Plan 2023-24-Construction of School building for Govt. P. W. L. P. School, Mannar Alappuzha- Soil Investigation Works-Investigation Work
This work includes the conveyance of boring machine and Boring through soil and rock etc. at the proposed site of Lowerchatta Munnar dam.
GENERAL Investigation work for the Construction of New BTS garage and Compound wall In KSRTC Kayamkulam -Soil investigation for the Construction of New BTS garage and Compound wall In KSRTC Kayamkulam Investigation Work 1
Soil test
Soil Test
Soil investigation Karshaka Suhrutha link Road
Topographical survey and soil investigation works
GENERAL Hamp FWD-Medical education - Implementation of Plan Scheme during the year 2019 - 20 - Construction of Level 1 Trauma Care center in Govt. Medical College Kozhikode- Soil investigation works For Part TS-Work-General Civil work
GENERAL Health amp Family welfare Department Medical Education Implementation Of Plan Schemes during the year 2018-19- Construction of Building For Postpartum unit in institute of Maternal amp Child Health Phase I Soil Investigation work
G E N E R A L - M L A A D S - 2 0 2 5 - 2 6 - CONSTRUCTION OF NEW BUILDING FOR DISTRICT AYURVEDA HOSPITAL IN ALAPPUZHA-Soil Investigation-Investigation Work(Re Tender)
GENERAL Construction of new school building for Govt LPS Vayala Vadakku in Konni LAC of Pathanamthitta district Soil investigation work for the Construction of New School building for Govt LPS Vayala Vadakku Pathanamthitta Investigation Work
Kasargod Development Package-Kabaddi Academy And Indoor Court at GHS Kodiyamma-Soil investigation including total station survey and preparation of structural drawing for the Kabaddi academy and construction of the indoor court at GHS Kodiyamma
K I I F B 2 0 1 7 1 8 C o n s t r u c t i o n o f Wadakkanchery Bypass road in Thrissur District Soil Investigation Work-Investigation Work
NABARD RIDF XXVI- Establishment of Nile Tilapia Hatchery at West Kallada in Kollam- Work package I- Construction of earthen ponds, Bio fencing,Hatchery building,Boundary Fencing,Land Development,Lining of pond,Geotextile for bund,soil Investigation
KIIFB 2017 18 Improvements to Muringoor Ezhattumugham Road from km 0/000 to 12/200 in Thrissur District Construction of protection wall for approch of Palathuzhi bridge at ch. 0/370 soil investigation works Investigation Work
transportation of all necessary plants equipment and materials setting up of bore hole at each location for conducting field test and collectingsamples boring with rotary power drillingequipment in all type of soil and hard rock
Soil Investigation Fire Station Chavara Setting up of new Fire Station Soil Investigation Setting up of new Fire Station Chavara
Soil investigation work and Total Station Survey
Soil investigation, Surveying and planting boundary pillars
Annual Plan-Edavetty G P - 2023-24 Construction of Smart Anganwadi in Ward 11- Soil Testing and Structural Designing-Proj No- 134/23-24-General Civil Work
Selection of Laboratories for Testing of Products/Material - WORK CONSULTANCY SERVICES REQUIRED FOR SOIL INVESTIGATION FOR PROVISION OF DEFICIENT MARRIED ACCOMMODATION AT MUTTATHARA; As per Scope of Work Attached; As per Scope of Work Attached; As pe..