Loading…
Loading…
8,374 results • Best match
Surveying Soil investigation design and Supply of all materials labour TP etc complete required for completion of following works of Dostpur Nagar Panchayat Reorganization Water Supply Scheme on turn key basis
Soil Investigation work for construction of CWR (900 CUM CAPACITY) under rejuvenation of Onda Water Supply Scheme, Block -Onda under Bankura Sadar Sub Division of Bankura Division, P.H.E. Dte (Zone- II)
Designing of Vented Causeway 30mtr span Sangar incl. Topographical Survey and Soil investigation test (with Bore Method only), vetting of structural drawings from IIT / GCET / DIQC Jammu any other recognized institute.
Construction Pump,Chlorine room, 250 CuM OHR..Boundary wall, Soil Investigation,Land development, Rising main, Laying distribution, road restoration and Providing FHTC at DHALLA WS Scheme under BIRBHUM Division, PHE Dte.
Surveying Soil investigation design and Supply of all materials labour TP etc complete required for completion of following works of Amethi Nagar Panchayat Reorganization Water Supply Scheme on turn key basis
Surveying Soil investigation design and Supply of all materials labour TP etc complete required for completion of following works of Nagar Panchayat Kadipur Water Supply Reorganization Scheme on turn key basis
Construction of 1 no. 350 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with soil investigation, Pump connections and other allied works for Bagdanga Water Supply Scheme, Block - Namkhana
Sinking Of Tube Well, Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 400 cum OHR (Intze type with pile foundation) and Accommodate FHTC under JJM with allied work for ..
Construction of 10 Bedded Hospital at 55th Bn ITB Force (SH Carrying out Soil investigation and Consultancy Services for detailed Architectural and Engineering design and detailing structural Analysis and detailed estimation)
Surveying Soil investigation design and Supply of all materials labour TandP etc complete required for completion of works of Lambhua Nagar Panchayat Water Supply Reorganization Scheme as given in bid document
C/o 10 Bedded Hospital at 25 Bn, ITBP Force (SH. Carrying out Soil investigation and Consultancy Services for detailed Architectural and Engineering design and detailing, structural Analysis and detailed estimation)
Augmentation of KETUGRAM ZONE-II PWSS with LDS, FHTC Construction of 1250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Ketugram-II Block, Dist Purba-Burdwan
Sinking of Tubewell, Laying of Rising Main and Distribution System, Providing FHTC, Construction of 400 Cum capacity OHR with 20m Staging Height including Soil Investigation etc. of Augmentation of Dhiltail PWSS.
Soil investigation in connection with No cost to the State Exchequer project over River Pagla for a length of 19.0 KM in Block Kaliachak-I and III under Malda Irrigation Division.
Construction of Pump Chlorine room with sanitary arrangts, 300 CuM capacity O.H.R. Boundary wall, Soil Investigation ,Laying distribution ,Providing etc.. FHTC related to SRIKANTAPUR WS scheme under BIRBHUM Division, PHE Dte
Soil investigation work for proposed construction of Bridge at Raj Hat over river Kunti at 5.90km of Bandel_Rajhat_Polba Road under Hooghly Division, PWD during the year 2023_2024 _Bore Hole 3 nos
Soil Investigation work for proposed construction of R.C.C Bridges at Madhabpur and Hamarjita over Kudi Khal and K.D.C, G.P.- Barida and Jerthan in Block-Egra-I, P.S.-Egra, Dist-Purba Medinipur
Soil Investigation work at Guniagachi Branch channel and T.P. Main Khal Junction near Kishore Bharati Stadium under Ward No. 109 of KMC, P.S.- Survey Park, District-Kolkata Under MDD-II Division.
Soil Investigation work in connection with proposed construction of new multistoried (G plus 2) building with provision for further construction of one additional floor within the campus of ITI Howrah Homes.
Soil Investigation Work at the site for CAPACITY EXPANSION AND MODERNISATION OF GOVT. FRESHWATER FISHERIES RESEARCH AND TRAINING CENTRE, KULIA, KALYANI IN THE DISTRICT OF NADIA DURING THE YEAR 2024-25
Sinking of Tube well Laying distribution pipe line Pump House Boundary wall Soil investigation 200 Cum OHR etc. for Aug. of Shanrpur PWSS in Debra block under Midnapore Division PHE Dte.
Construction of 500 Cum OHR including soil investigation. LDS with FHTC, Two Nos Pump House of SONATALA PWSS at Udaynarayanpur Block of Howrah District under Howrah Division, P. H. E. Dte.
Co Type A Kendriya Vidyalaya and Residential Quarters T II 04 Nos T III 04 Nos and T V 01 No at BSF Rampura Distt Fazilka Punjab Subwork/Packages: Soil Investigation
Hiring of Third-Party Inspection Agency - Professional services under KASO; CONTRACT FOR PROFESSIONAL SERVICES/WORKS SUCH AS SURVEYING, SOIL INVESTIGATION, STRUCTURAL DESIGNING, DEVELOPING LAYOUT PLAN & OTHER DETAILED DRAWINGS FOR DEVELOPMENT/MODER..
Consultancy services for preparation of detailed structural design Geo technical investigation and electrical resistivity tomography ERT test works for the C/o RCC boundary wall Approx 3000 Mtrs including Augmentation of security lights installation of high security bullet proof main gate alongwith sentry post and allied security accessories installation of additional access gate alongwith sentry post C/o 4 Nos. RCC living cum fighting bunkers and c/o 34 Nos. RCC bullet proof observation post at SHQ BSF Kupwara JandK
Consultancy services for preparation of detailed structural design Geo technical investigation and electrical resistivity ERT test works for the C/o RCC boundary wall Approx 3000 Mtrs including Augmentation of security lights installation of high security bullet proof main gate alongwith sentry post and allied security accessories installation of additional access gate alongwith sentry post and c/o 04 Nos. RCC living cum fighting bunkers and c/o 20 Nos. RCC bullet proof observation post at 172 Bn BSF Trehgam JandK.
Consultancy services for hydrological investigation, topographical surveying, and geo- technical investigation of sites including submitting detailed architectural and structural drawing of all cross drainage structures like (Culvert and bridges) with detailed project report (DPR) and detailed estimate duly vetted from IIT/NIT or any other Govt. Engineering college along GIN 58, 59,63, 64, 65, 66, 71, 72, 73, 74, 75, 76, 78, 79, 80, 81, 82 and 83 (Total Length 44.52 Km) at Murshidabad district, West Bengal. Subwork/Packages: Same as Name of Work
As per NIT and Tender Document
Procurement of Aggregate Impact testing Apparatus for Geotechnical Lab GSI SR Hyderabad
Procurement of Bentley Systems Structural WorkSuite, Bentley Systems GeoTechnical Analysis 2D WorkSu
Soil Test for proposed construction of RCC bridge at Daspara over Guniagachhi Branch Channel, P.S. Purba Jadavpur, Ward No. 109 of KMC under MDD-II
Construction of Partition Wall in between Engineering Section and Soil Testing Laboratory and Sign Board for Administrative Building under WBCADC, Berhampore Project.
Setting up Soil Testing Laboratory (STL) at Dantan Manav Kalyan Kendra, Krishnapur, P.O.-Dantan, Dantan-I Block, District- Paschim Medinipur, Pin-721426.
Soil Testing for Construction of Proposed buildings for accommodation of Medical facilities for MCH, CNMCH and NRSMCH at 17, Convent Road, Kolkata.
SOIL TESTING FOR PROVN OF AIR CONDITIONING (VFD TYPE VRF SYSTEM) IN BUILDING NO 234 AND 391 (PH ONE) AT VSN NAGPUR
Purchase for regular laboratory classes of UG and PG courses and for project thesis work of Mtech.
Hiring of Consultants - Milestone/Deliverable Based - Architectural Drawings, Structural Design, Soil Investigation & Topographical Survey and Estimate Abstrack & Yardstick including BoQ and Current Market Rate Analysis for Provn OTM Accn for EME BN ..
Construction of 200 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection and soil investigation at Gangadharpur Zone - II under Serampore Sub-Division of Hooghly Division, P.H.E. Dte.
To conduct investigations for the improvements of major 5 bridges.This estimate includes soil investigation with 3m hard rock boring for 4 bridges .Hydraulic and velocity calculation Cross sectional details, Total station surveying .
Soil investigation for proposed Sluice gate of Moukhali Khal at Ch. 0.00 Km. near Moukhali Kheyaghat over river Karati at Mouza Moukhali Kumarkhali, Block Canning-II, District South 24 Parganas. (2nd Call)
Construction of 200 cum. capacity R.C.C OHR as per Departmental design, drawing and specification, including bored pile,pile cap and Soil Investigation at Bagdah Water supply Scheme, under Barasat Division, P.H.E. Dte.
Hiring of Consultants - Milestone/Deliverable Based - Architectural Drawings, Structural Design, Soil Investigation and Estimate Abstract & Yardstick including BoQ and Current Market Rate Analysis for Construction of A1 type (Single Section upto XII ..
Tender for detailed survey including route alignment, profiling, tower spotting, optimization of locations,contouring and preparation of Forest clearance proposals including Revenue papers, Soil investigation reports for the Construction of 132kV sc
Preparation of Detailed Project Report with all necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design including Conducting Falling Weight Deflectometer Test and Analysis for Overlay Design and with necessary Estimate
Consultancy services for preparation of Detailed project Report, Falling Weight Deflectometer Test, Axle load survey , Conducting traffic census and Soil investigation test, in connection with Widening and Strengthening of Amta Rajapur Dihibhurs
Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR PREPARATION AND SUPPLY OF ARCHITECTURAL DESIGNS & DRAWINGS, STRUCTURAL DESIGNS & DRAWINGS, DETAILED ESTIMATE AND SOIL INVESTIGATION OF BUILDINGS UNDER JOB PROVN OF KLP FOR..
Construction of 200 cum. capacity R.C.C OHR as per Departmental design, drawing and specification, including bored pile,pile cap and Soil Investigation at Gangrapota Water supply Scheme, under Barasat Division, P.H.E. Dte.
Laying of Rising Main, Providing FHTC, Construction of 300 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Brahmangaon PWSS
Laying of Rising Main, Providing FHTC, Construction of 300 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Bagbari PWSS
Engineering Study including Road Inventory, Topographical Survey, Traffic Study, Pavement Soil Investigation etc. and submission of Reports for Arambagh Gourhati Bandar Road from 0.00 Kmp. to 19.67 km. under jurisdiction of AHSD