Loading…
Loading…
8,374 results • Best match
Soil investigation for the proposed Construction of a new cart bridge at ch.565.00 of DaBC under DC No-III Sub-Division of Damodar Canal Division,Block-Bhatar,P.S.-Bhatar District-Purba Bardhaman.
Soil Investigation work for construction of Single Lane Bridge over Keorapukur khal at Jalasi under Diamond Harbour I Sub-division of Canals Division in Mouza-Kamarpukur, Block-Magrahat-II Dist-South 24 Parganas.
Construction of Community Hall in Dussehra Ground, Mukherjee Nagar, ward no. 13/CLZ. Sub head Consultancy services for structural design drawings, mechanical, electrical, plumbing MEP operations alongwith soil investigation for Construction of C
Construction of 750 M3 Capacity OHR with Soil Investigation and FHTC of Kharba Piped Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Hiring of Consultants - Milestone/Deliverable Based - Subject Matter Experts, Consultancy Services for Soil Investigation, Structural Analysis and Design and detailed Cost Estimates for DSC Platoon at Kanpur.; Engineering Design; Yes; Hybrid(As speci..
Soil investigation work in 32 locations in connection with New or Re construction of sluices in different Blocks under Howrah and Hooghly District under WBMIFMP FM Package XI, comprising 4 Lots LOT 4
Soil Investigation work for the proposed 2 nos check Dam at Monoharpur Lat 23.6820N, Long 87.6209 E and Sangri Mahula Lat 23.7440N, Long 87.7361 E in Block Bolpur Sriniketan, PS.-Bolpur, dist. Birbhum.
Soil investigation of for proposed R.C.C Sluice over Left Bank of Rupnarayan River over Laharipara Khal near Anantapur in G.P- D.M Ghat-II, Block-Shyampur-II, Dist-Howrah under Lower Damodar Construction Division.
Soil investigation work in 32 locations in connection with New or Re construction of sluices in different Blocks under Howrah and Hooghly District under WBMIFMP FM Package XI, comprising 4 Lots LOT 3
Soil investigation on the right bank of river Ganga under Jangipur Irrigation Sub-Division No-II of Ganqa Anti Erosion Division No-I at Kamalpur and Loharpur within Block Samserganj, Murshidabad.(2nd Call)
Construction of 300 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection and soil investigation under HATGOBINDAPUR Piped W.S. Scheme within Burdwan- II Block under Burdwan Division, P.H.E Dte.
Construction of 500 M3 Capacity OHR with Soil Investigation and FHTC of Choupaldanga Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Construction of 250 cum. capacity 20 mtr. staging height RCC Over Head Reservoir alongwith Soil Investigation work, Laying Distribution System .. for Kashinathpur Piped Water Supply Scheme, Block-Bhangar-I, District-South 24-Parganas
ENGAGEMENT OF REPUTED CONSULTANCY / PROFESSIONAL FOR PREPARATION OF SOIL INVESTIGATION REPORT, TRAFFIC SURVEY REPORT AND PAVEMENT DESIGN REPORT AT GOPAL NAGAR KHELAR MATH TO GOPAL NAGAR BANSTALA IN WARD NO-142, BR-XVI.
Construction of Reinforced Cement Concrete Wall Right Side and Back Side of government land C.T.S No.1/2 Mumbai Suburban District for Sport Activity and Preliminiary Soil Investigation at Bombay Soap factory, Mankhurd
Construction of 200 cum capacity R.C.C. Elevated Reservoir including Soil investigation, Construction of Boundary Wall and Land Improvement at Iswarchandrapur Water Supply Scheme under Nadia RWS Sub-Division under Nadia Division PHE Dte
Soil investigation total station survey Planning design detail engineering preparation of estimate working drawing BOQ DPR etc for Construction of G plus 10 Paribahan Bhaban within WBTC Kasba Depot compound Kolkata 700 107
Soil investigation for Construction of lock gate at Khargram Kaki gore Danga irrigation channel at khargram in Mouza - palsit bridge and lock gate from kana nadi irrigation channel near sanat Mukherjee and p
Sinking of Tube well Laying of Rising Main Pump House Boundary wall Soil investigation 100 CuM OHR and FHTC for Augmentation of Amrakuchi PWSS in Keshpur block under Midnapore Division PHE Dte._PART_C
Augmentation of SASINARA ZONE II PWSS with LDS FHTC Rising main Construction of 350 cum capacity OHR with 20.0 mtr Staging height inclusive of soil investigation under MEMARI I Block District Purba Burdwan.
Construction of 700 M3 Capacity OHR with Soil Investigation and FHTC of Kushida Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Augmentation of NATUNGRAM Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation and Rising Main under BARDHAMAN-I Block, District- Purba-Bardhaman.
KARAIL Piped Water Supply Scheme with sinking of Tube-well, LDS,Rising Main, FHTC with Staging height including soil investigation .............. at different TW site under Purbasthali-I Block, District- Purba-Bardhaman. NEW SCHEME.
Soil Investigation work for proposed Single Lane RCC Bridge of Carriageway 4 point 250 M at Mouza-Dadpur Ch 275 Over Suryapur Inner Channel under Block Mograhat II PS Mograha, Dist.South 24 Parganas.
Soil investigation work in 32 locations in connection with New or Re construction of sluices in different Blocks under Howrah and Hooghly District under WBMIFMP FM Package XI, comprising 4 Lots LOT 2
Soil investigation for the proposed re-construction for the bridge at ch.429.00 of DBC under D.C. No-III Sub-Division of Damodar Canal Division, Block- Aushgram-I, P.S.- Aushgram, Dist.- Purba Bardhaman
Soil investigation over river Mora Mahananda for a length of 39.00 km in connection with the No cost to State Exchequer model within Ratua I and II, PS Ratua and Pukhuria, Dist Malda
Construction of 600 M3 Capacity OHR with Soil Investigation and FHTC of Hatinda Piped Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Soil investigation work in 32 locations in connection with New or Re construction of sluices in different Blocks under Howrah and Hooghly District under WBMIFMP FM Package XI, comprising 4 Lots LOT 1
Augmentation of NABABHAT PWSS with LDS FHTC RisingmainConstruction of 450cum capacityOHR with 20.0 mtr. Staging height of soil investigation Repairing of Pump house at Headworks 2nd TW site under Burdwan-IBlock Dist PurbaBurdwan
Construction of 600 M3 Capacity OHR with Soil Investigation and FHTC of Wari Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Construction Pump,Chlorine room with sanitary arrangements,250 CuM OHR,Boundary wall,Soil Investigation,Land development,Rising main, Laying distribution,road restoration,Providing FHTC..at SANDHYAJOL WS scheme under BIRBHUM Division,PHE Dte
Soil Investigation work for proposed construction of R.C.C. Bridge at chakbhabani, Nichdanda, keutgeria over Argoal draimage khal, Balighai main drain in Block- Patashpur-II, Egra-II, P.S.-Patashpur, Egra and Dist-Purba Medinipur.
Survey Soil investigation Design Supply of materials labour T and P etc required for construction erection completion testing and commissioning of water supply works for KANNAUJ NAGAR PALIKA PARISHAD WATER SUPPLY REORGANISATION SCHEME
Soil Investigation for the work of Construction of R.C.C Elevated Reservoir of Capacity 500 m3 Staging Height 20 mtr. For Paschim Khalna W/S Scheme under Uluberia Sub-Division, under Howrah Division, P.H.E.Dte.
Preparation of Detailed Project Report with all necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design and with necessary Estimate for upcoming project work of Dewanhat-Balarampur road, from 0.00km to 9.30km
Survey Soil investigation, Design, Supply of all materials etc. Required for construction of Over Head Tanks, CWR, SCADA room, Rising Main, Distribution Network, House connection, Boundary wall, MS gate, site development work etc.
SH-Hiring of Consultancy services for complete Soil Investigation report, Preparation of Preliminary Project Report, Detailed Project Report, Digital Contour Survey, Structural Design/Drawings and other approval from the competent authority and vetti
Soil investigation for proposed sluice cum road bridge along right bank of Hooghly River over Kurchiberia Khal near Kurchiberia Bazar in G.P-Dingakhola, Block-Shyampur-I, Dist-Howrah under Seijberia (I) Sub-Division.
Soil investigation for proposed R.C.C road bridge along left bank of Rupnarayan over Atteswari Khal near Atteswari Sana Para in G.P-Baneswarpur-II,Block-Shyampur-I, Dist-Howrah under Seijberia (I) Sub-Division.
Hiring of Consultants - Milestone/Deliverable Based - Architectural Drawings, Structural Design, Soil Investigation, Topographical Survey and Estimate on SSR 2020, Market Rates, Abstract & Yardstick and Current Market Rate Analysis for Provn of OTM A..
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - Civil, SOIL INVESTIGATION; Specific gravity, Moisture content, (i) Shrinkage limits (ii) Atterberg limits (iii) Natural moisture content (iv) Wet and dry density ..
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - Civil, SOIL INVESTIGATION; Specific gravity, Chemical analysis, Moisture content, (i) Shrinkage limits (ii) Atterberg Limits (iii) Natural moisture content (iv) Wet a..
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - Civil, SOIL INVESTIGATION; Specific gravity, Moisture content, (i) Shrinkage limits (ii) Atterberg limits (iii) Natural moisture content (iv) Wet and dry density ..
Hiring of GIS Implementation Agency for Survey, Software Development and Master Planning related activities - Provn of Family Welfare Centre at Salt Lake; Mobilization and Demobilization of tools/equipments and personnel required soil investigation, ..
Procurement of Laboratory permeability Apparatus for use in Geotechnical Lab, GSI SR Hyderabad
Drilling and sampling sub-contract work for the AAI Coimbatore Geotechnical consultancy project
Geotechnical Exploration at proposed Balawas and Chota Rangit SHP 18 MW, Darjeeling District
mobilization,clearing acess to the site,boring in all classes of soil,hard rock ,completion of field data,total station survey etc.