Loading…
Loading…
8,374 results • Best match
Soil Investigation for Construction of 01 (One) No of Overhead Reservoir, Construction of 400 Cum capacity .....providing Functional House Hold Tap Connection (FHTC)....Hridaypur water supply ...under Nadia Arsenic Civil Division - II P.H.E. Dte
Construction of Reinforced Cement Concrete Wall front and left side of government land C T S No 1 2 Mumbai Suburban District for Sport Activity and Preliminiary Soil Investigation at Bombay Soap factory Mankhurd
Construction of 100 Cu.M. capacity R.C.C. Elevated Reservoir of 20 Mtrs. Staging Height with laying distribution system, soil investigation, rising main, boring of deep tubewells, ......Gangaram Tea Garden PWSS of Phansidewa block (2nd Call)
Detailed Survey, Soil Investigation, Design, Drawing, preparation of land acquisition plan/proposal, Preparation of DPR of ROB construction work, Liosining with railway department and obtaining necessary approval, Vetting of final design from any IIT
Construction of new Community Hall Vijay Nagar in Mukherjee Nagar ward no. 13/CLZ. Sub head Consultancy services for structural design/ drawings, mechanical, electrical, plumbing MEP operations alongwith soil investigation for construction of new
Construction of 100 cum. capacity R.C.C OHR as per Departmental design, drawing and specification, including bored pile,pile cap and Soil Investigation at Kurulia (Zone-I) Water supply Scheme, under Barasat Division, P.H.E. Dte.
Soil Investigation for Construction of 01 (One) No of Overhead Reservoir, Construction of 350 Cum capacity .....providing Functional House Hold Tap Connection (FHTC)....Rajapur water supply ...under Nadia Arsenic Civil Division - II P.H.E. Dte
Soil Investigation for Construction of 01 (One) No of Overhead Reservoir, Construction of 350 Cum capacity .....providing Functional House Hold Tap Connection (FHTC)....Tarinipur water supply ...under Nadia Arsenic Civil Division - II P.H.E. Dte
Providing FHTC including supplying..all com,plete...Construction of 250 cum capacity 20 Mtr. staging height RCC Over Head Reservoir...soil investigation..for Badkulla Zone-II to accommodate FHTC...under Nadia Division P.H.Engineering Dte
Laying of Distribution System...Providing FHTC including supplying..all complete...Construction of 200cum capacity 20Mtr. staging height RCC Over Head Reservoir...soil investigation..for Karimpur Jalangi Zone-IXB to accommodate FHTC..under Nadia Divn
Construction of Boundary wall Soil investigation Construction and Commissioning of RCC OHR of capacity 200 cum and Accommodate FHTC under JJM for Pachra PWSS in Midnapore Sadar block under Midnapore Division PHE Dte. PART_B
Construction of 200 CuM capacity O.H.R.with Soil Investigation,5.90 m X 4.10 m Pump, Chlorine room with sanitary arrangements,....FHTC and different works related to RANIBAZAR PIPED WS SCHEME within Birbhum Division, PHE Dte.
Construction of Boundary wall Soil investigation Construction and Commissioning of RCC OHR of capacity 100 cum and Accommodate FHTC under JJM for Khangardihi PWSS in Midnapore Sadar block under Midnapore Division PHE Dte. PART_B
Construction of 150 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with Laying D.I. Pipe Line including design drawing of foundation after soil investigation for Buraburirtat Water Supply Scheme, Block - Pathar Pratima
Providing FHTC including supplying..all com,plete...Construction of 250 cum capacity 20 Mtr. staging height RCC Over Head Reservoir...soil investigation..for Bagula Zone-I to accommodate FHTC...under Nadia Division P.H.Engineering Dte
Construction Pump,Chlorine room with sanitary arrangements, 250 CuM OHR, Boundary wall, Soil Investigation, Land development, Rising main, Laying distribution, road restoration and Providing FHTC..at HANSAN WS scheme under BIRBHUM Division, PHE Dte.
Soil Investigation work for the Extension of 5 nos of CD at Ch. 923.35, Ch 943.35, Ch 988.85, Ch. 1007.35, Ch 1054.00 of KSMC under Bolpur (I) Sub-Division under Mayurakshi south canals Division.
Sinking of Tubewell, Laying of Rising Main and Distribution System, Providing FHTC, Construction of 500 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House etc. for implementation of Bartakkigram PWSS.
Work for complete detail survey works along with profile tower spotting and submission of survey details including soil investigation of proposed tower of 400KV SC TTPS Biharsharif Transmission Line under the jurisdiction of JUSNL
Laying dist. system and constn. of RCC OHR of 400 cum capacity along soil investigation of KAYRAPUR and its adj. mouzas W.S. Scheme _PART-A_ of Ausgram - I Block under Burdwan Division_ PHE. Dte.
Construction of 600 cum capacity 20 mtr. Staging height RCC Elevated Reservoir as per Departmental Design Drawing including Soil Investigation, Design of Pile foundation and all pipe connections for KHILA PWSS of Udaynarayanpur Block
Construction of 200 cum cap. 20 Mtr. staging height RCC Over Head Reservoir including ............... including soil investigation for PRATAPPUR-Zone-I and its adj.mouzas W.S. scheme under Durgapur Sub-Division_under Burdwan Division_ P.H.E. Dte.
Laying of Distribution System including specials,valves...all compl..Providing FHTC ..with all necessary ..Construction Of 500Cum Capacity..RCC OHR..Soil Investigation all complete..Ground Based WS Scheme at Payradanga under Nadia Divn,PHED
Soil investigation work of proposed construction of New District EVM _ VVPAT warehouse in front of Land Acquisition Office, in the compound of old collectorate building, Chinsurah, under Hooghly Division, P.W.D. during the year 2023_2024.
Soil investigation for the proposed Construction of a new cart bridge at ch.514.00 of DaBC under DC No-III Sub-Division of Damodar Canal Division,Block-Aushgram-I,P.S.-Aushgram, District-Purba Bardhaman
Soil investigation for construction of a new Sluice structure with bridge , Head Regulator Structure over Dev Khal at Vill -Teandul, G.P. Natu, Block - Raina - I under Seharabazar (I) Sub-Division under Damodar Canal Division
Construction of 350 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for JAGADISHPUR Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block
Soil Investigation for Construction of 01 (One) No of Overhead Reservoir, Construction of 350 Cum capacity .....providing Functional House Hold Tap Connection (FHTC)....Binodnagar water supply ...under Nadia Arsenic Civil Division - II P.H.E. Dte
Soil Investigation for Construction of 01 (One) No of Overhead Reservoir, Construction of 100 Cum capacity .....providing Functional House Hold Tap Connection (FHTC)....Jayrampur water supply ...under Nadia Arsenic Civil Division - II P.H.E. Dte
Preparation of Detailed Project Report along with Topographical Survey, Soil Investigation, Traffic Survey and Axle Load Survey etc related to the work Belpahari-Banspahari Road from 12.00 KMP to 23.80 Km, Widening and Strengthening
Preparation of Detailed Project Report along with Topographical Survey, Soil Investigation, Traffic Survey and Axle Load Survey etc related to the work Gopiballavpur-Nayagram Road (SH-9) 35.00 Kmp to 41.60 Km Strengthening work
Supplying Installation and Demonstration of different instruments equipment to the Quality Control Laboratory Soil Testing Laboratory under Quality Control Division II Siliguri 2nd call
SOIL TESTING FOR PROVISION OF SUMP AND PUMPING STATION TO FEED POTABLE WATER INSIDE FACTORY AT OFC KANPUR under GE (I) (P) (Fy) Kanpur
Please refer to BOQ
Please refer to BOQ
Laboratory Glassware Volumetric Flask (Q4) (3 (3 ))
Atomic Absorption Spectrometer-Flame
Quartz Plate, Disc, Crucible, Wafer (Q3) (3 (3 ))
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Healthcare, Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Healthcare
minimum 3 nos of bore holes are to be drilled for collecting the soil samples from the site.
Please refer to BOQ
Investigation works
ON OPEN PLOT OB-9 (OLD OB 8-1,8-2,8-3), NEAR SULBHA SCHOOL , TILAK NAGAR ,CHEMBUR- MUMBAI.-71,
Boring and Soil Investgation work
Investigation Work
1. Widening and Strengthening of GMC limits to Nidamarru (via) Reddypalem, Venigandla and Kantheru from 0/0 to 2/7 in Guntur District 2. Widening and Strengthening of JKC College to Ponnekallu road from Km 2/0 to 7/0 in Guntur District. Sub Work :- ... (R&B) Soil Testing Cell ...
Hiring of Consultancy Services - Percentage based - Technology Consultants, Soil Investigation for provn of deficient Married Accommodation for service and civilian personnel at Service Selection Board, Kolkata (New proposed site for 2 x Md accn for ..
Construction of 150 CUM capacity OHR,including Soil Investigation, 5.09mX4.1 m Pump House,Chlorine Room with Sanitary...Rising Main and Laying Distribution FHTC and const.Boundary Wall...Bheter PIPED WS SCHEME within Birbhum Divn, PHE Dte
Laying of Rising Main, Providing FHTC, Construction of 300 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Shyampur Piped Water Supply Scheme
Const. of 100 cu.m. RCC Reservoir..... laying distri. system, Soil Investigation, RM, Deep TW, PH, Boundary Wall, FHTC under JJM for Augmentation of Hansqua Tea Garden of Phansidewa block under Siliguri Sub Divn, PHE Dte.