Loading…
Loading…
8,374 results • Best match
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 350 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Panchhata PWSS
Sinking Of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 300 cum OHR ( Intze type with pile foundation) and Accommodate FHTC under JJM with allied work for Gopinathpur W/S scheme
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 600 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Lohaganja PWSS
Survey, Soil Investigation, Design, Supply of all materials, labour, etc required for construction, completion, testing and commissioning of water supply works such as RCC OHT, CWR, TW with PLC SCADA, Rising Main, Distribution System, etc
Laying of Rising Main, Partial Distribution of pipeline, Providing FHTC, Construction of 300 Cum capacity OHR with 20m Staging Height including Soil Investigation, Construction of Pump House for implementation of Bhoir Piped Water Supply Scheme.
Laying of Distribution System, Providing FHTC, Soil investigation, Construction of 300 cum capacity OHR, Construction of Pump House, Boundary Wall, Service Road, for Gar Shyamnagar in under N 24Pgs W/S Div-I, PHE Dte
Construction of 450 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for SERPUR Piped Water Supply Scheme to accommodate FHTC in Bhangar-I Block
Soil investigation in connection with construction of bridge over Kamakhya Khal under Damodar Canal Division at Village-Chandipur, G.P.-Mertala, Block- Purbasthali-II. Purba Bardhaman. (IW/SI-94/2025-26), Project ID- IW2526343055000 (3rd Call)
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 350 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Installation of IEP, Pump House etc. for implementation of Saraihat Bajedonor PWSS.
Const of 200,350 CuM OHR (ZONE-I,II) with Soil Investigation, Laying distribution Boundary wall,Land development,road restoration and Providing FHTC and different works related to KUSUMBA WS scheme under BIRBHUM Division, PHE Dte
Construction of 400 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection and soil investigation under GOPIKANTAPUR Piped W/S. Scheme within Jamalpur Block under Burdwan Division, P.H.E Dte._3RD CALL
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 100 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Kakhar PWSS
Augmentation of SELIMABAD PWSS with LDS FHTC Risingmain Construction of 350 cum capacity OHR with 20.0 mtr Stag he soil investigation including construction of switchrooms 5.40mx3.6m Boundary walls for new site under Jamalpur BlockDist PurbaBurdwan
Augmentation of NADRA Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation and Rising Main under BARDHAMAN-II Block, District- Purba-Bardhaman. _2ND CALL.
Construction of New Dhobi Ghaat by demolishing old dilapidated Dhobi Ghaat in Block No. 14, Kalyanpuri, Ward No. 195 AC-56 Kondli. SH Consultancy Services for Structural Design and Drawings and Soil Investigation at site
Soil Investigation for proposed work Improvement of Irrigation potential in Kafran bundh minor irrigation system at G.P.Paraj Block Galsi I and Gajabali bundh minor irrigation system at G.P. Eral Block Ausgram II, Dist Purba Bardhaman.
Engineering Study including Road Inventory, Topographical Survey, Traffic Study, Pavement Soil Investigation etc. and submission of Reports for Jougram Khanpur Road from 6.50 km to 10.27 km Strengthening work including Reconstruction of 3 Nos. HP
Pump House ,150 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (1023 nos) under JJM with allied work of BRINDABANPUR PWSS
Engagement of Surveying Agency for carrying out Route Alignment, Detailed survey and detailed soil investigation of transmission scheme Network Expansion scheme in Maharashtra for Evacuation of RE Power from Dharashiv, Beed Districts and associated line
Soil investigation work for the proposed Pump House over Charial Khal at outfall point (Ch. 17.85 Km) under Budge Budge Municipality, Dist. South 24 Parganas under Suburban Drainage Sub-Division No.II of Suburban Drainage Division
Construction of 300CuM cap. 20 Mtr. staging height RCC Over Head Reservoir including pipe connection_cost of pipes,specials including soil investigation for BHATKUNDA and its adj.Mouzas W.S.Scheme under Durgapur Sub-Divin. under Burdwan Divn_PHE Dte.
Surveying Soil investigation design and Supply of all materials labour TP etc complete required for completion of following works of Sewerage Scheme for Administrative Campus of Dr Ram Manohar Lohia Awadh University Ayodhyanon turnkey basis
BALUNDI SELALPUR MADHABPUR DHARKUNDU Z-II PWSS with TW Switch room boundary wall LDS FHTC RCC OHR with 20 mtr. soil investigation work at ARAMBAGH Block under Arambagh Sub-Division under Hooghly Division, PHE Dte.
Augmentation of MADHABPUR ZONE-I Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation and Rising Main under JAMALPUR Block, District- Purba-Bardhaman_3RD CALL.
Laying of Distribution System including specials,valves...all complete..Providing FHTC ...with all necessary ...Construction Of 300 Cum Capacity.. RCC OHR...Soil Investigation all complete..Ground Based WS Scheme at Andharkota under Nadia Divn, PHED
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 600 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Berail PWSS
Construction of 350 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for NALMURI Piped Water Supply Scheme to accommodate FHTC in Bhangar-I Block
Laying of Distribution System including specials,valves...all compl..Providing FHTC ..with all necessary ..Construction Of 450Cum Capacity..RCC OHR..Soil Investigation all complete..Ground Based WS Scheme at Krishnagar Rural under Nadia Divn,PHED
Sinking of tubewell, Laying of Rising Main and Distribution System, Providing FHTC, Construction of 500 Cum capacity OHR with 20m Staging Height including with Soil Investigation etc. for Augmentation of Hili Piped Water Supply Scheme.
Supplying, Laying, Distribution all type of specials..Providing FHTC laying, fitting..Construction Soil investigation of 350 Cum Capacity RCC OHR.Subarna Behar ZONE-II in Krishnagar-I Block of Nadia District under Nadia Division PHE Dte.
Laying distribution pipe line, Pump House, Boundary Wall soil investigation, Accommodate FHTC ( 500Nos) under JJM with allied work for Dakshin Sitala Its Adjoining Mouzas Water Supply Scheme within Ramnagar-II Block under Digha Sub-Division
Tantisal W/S scheme with LDS Rising mainFHTC workPump House(5.9mx4.1m) with sanitary w/s arrangementsPump house(4.1mx3.5m)450 cum capacityOHR with20 mtr. staging height including soil investigation at Khanakul-IBlockin ArambaghSub-Divn, Dist-Hooghly.
Laying of Rising Main, Providing FHTC, Construction of 200 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Sundail Piped Water Supply Scheme
Interconnection between Tube wells OHR and Construction of 700 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection soil investigation Baniban with foundation design Baniban Piped Water Supply Scheme (Zone-III)
C/o GOs living accommodation, Pl office, Kote, Ration, Clothing, Ors living accommodation, MI Room, WT Office and Recreation hall at Kharsangla BOP SH Carrying out digital survey Soil investigation Contour plan and Consultancy services
Laying of Distribution System including specials,valves...all compl..Providing FHTC ..with all necessary ..Construction Of 450Cum Capacity..RCC OHR..Soil Investigation all complete..Ground Based WS Scheme at Durgapur Chowgacha under Nadia Divn,PHED
Sinking of Tubewell, Laying of Rising Main, Providing FHTC, Construction of 450 Cum capacity OHR with 20m Staging Height including Soil Investigation, Construction of blower room and Pump House, etc. for Augmentation of Kamarpara PWSS
Soil Investigation of SAMD (Part-1) Channel and 17 (Seventeen) Nos non I and WD Khals within Rajpur-Sonarpur Municipality, GP-Sonarpur-II, Bonhooghly-II, South Garia, Begampur and Ramnagar-II, Block-Sonarpur and Baruipur
Surveying soil investigation engineering design and supply of all materials labour TandP etc complete required for completion of following works of Nagar Panchayat Pratapgarh City Re organization Water Supply Scheme Pratapgarh on turn key basis
Sinking of Tubewell, Laying of Rising Main an Distribution System, Providing FHTC, Construction of 600 Cum capacity OHR with 20m Staging Height including with Soil Investigation etc for implementation of Baldu Piped Water Supply Scheme.
ORGRAM Piped Water Supply Scheme with Rising Main and Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at Head work site under Ausgram Block, Distric- Purba-Bardhaman.
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 500 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Chandipur PWSS
Estimate for Soil Investigation for Ranaghat Krishnanagar State Highway SH-11 under Ranaghat Highway Sub-Division of Nadia Highway Division NoII P.W.Roads Dte in the district of Nadia during the year 25-26 2nd Call
Construction Pump,Chlorine room with sanitary arrangements,350 CuM OHR,Boundary wall,Soil Investigation,Land development,Rising main, Laying distribution,road restoration,Providing FHTC..at NARAYANPUR,Zone-I-II WS scheme under BIRBHUM Division,PHEDte
Soil Investigation for construction of Proposed RCC Box Culvert over Moukhali Khal at Ch. 1.10km near Rajjak Molla House under Mouza- Moukhali Kumrakhali, P.S- Jibantala, Block- Canning-II under Canning (I) Sub-Division of JID
Soil investigation work in connection with the construction of new bridges over river Banka near Bidyarthi Bhaban Girls High School and at Raynagar in Burdwan municipalityan and Block Burdwan-I, P.S - burdwan, District- Purba Bardhaman
Soil investigation, Design, Supply of all materials, Labour, TanP etc. required for construction, completion, testing and commissioning of water supply works such as RCC OHT, UGR, Rising main, Distribution system, Tube wells, Pump house, etc.
Soil Investigation work in connection with the work of Construction of RCC Bridge over Peali Channel at 2580 M in mouza Machpukur under GP Brindakhali under Block and PS Baruipur in Dist South 24 Parganas
Sinking of 300X200 mm Dia and 180 m deep tubewell, Pump/Chlorine room 250 CuM OHR, Boundary wall, Soil Investigation, Laying distribution etc.. Providing FHTC at Dhananjaypur its adjoining mouzas under BIRBHUM Division, PHE Dte
Construction of 600 cum capacity 20 mtr. Staging height RCC Elevated Reservoir as per Departmental Design Drawing including Soil Investigation, design of pile foundation and all pipe connections for UDAYNARAYANPUR ZONE-1 and 2 PWSS