Loading…
Loading…
8,374 results • Best match
Mobilization,clearing acess to the site,boring in all classes of soil,hard rock ,completion of field data,total station survey etc
Maintenance work
Investigation Work
As per BOQ
mobilization,clearing acess to the site,boring in all classes of soil,hard rock ,completion of field data,total station survey etc.
Investigation works
Construction of (G plus 5) building for structural engineering laboratory, geo technical laboratory, traffic engineering laboratory and classrooms under civil engineering department in the IIEST campus, Shibpur Howrah. SH: Providing services of one no unskilled labour for attending miscllaneous works for sub division and division office and another one no unskilled labour for sweeping and cleaning of the office premises of Kolkata-II and its attached sub division offices. Subwork/Packages: Providing services of one no unskilled labour for attending miscellaneous works for sub division and division office and another one no unskilled labour for sweeping and cleaning of the office premises of Kolkata-II and its attached sub division offices.
Conducting Final Location Survey (FLS) for (i) New BG Railway Line Projects (Appx. Length equal to 900.00 km), (ii) Gauge Conversion/Doubling/ Third line/ 3rd and 4th line (Appx. Length equal to 600.00 km.) of various projects in India, Nepal and ... with Geo -Technical ... Geo- Technical Investigation. ...
Sangameshwara Lift Irrigation Scheme - Conducting detailed survey including preliminary Investigation, Net level survey, taking cross sections along the alignment and detailed final survey along the alignment of AQpproach Channels, Open Canals, Pump ... and soil investigation to ...
Construction of Composite Border Out Post (Coy Level BOP) at D.T. Mal Enclave (under SHQ FZR) at Ferozpur Punjab. SH: C/o Admin Block, 32 Men Barrack, 8 Bed Mahila, Toilet Block, SOS Room, 02 nos. Central Morcha, 04 nos. Corner bunker, 02 nos. Two ... SH: Soil Investigation at ...
Providing consultancy services for carrying out survey, assessment of discharge andHFL, geo technical investigations, detail designing, working drawings, detailed estimates with BOQ, BBS, other allied works etc. and site visits including proof checki
Exploring Alternate Alignments Final location survey Geological mapping, Geo Technical Investigation, Detailed Design of Tunnel and its approaches including Viaduct if any and other ancillary works in Sohna Manesar Section of HORC project
Hiring of Consultants - Milestone/Deliverable Based - Architectural Drawings, Structural Design, Soil Investigation and Estimate Abstract Yardstick including BoQ and Current Market Rate Analysis for Provn of Certain OTM Accn and Stores at Damdim Bag..
Hiring of Consultants - Milestone/Deliverable Based - Architectural Drawings, Structural Design, Soil Investigation and Estimate Abstrack & Yardstick including BoQ and Current Market Rate Analysis for Provn of Flag Staff House at Tezpur; DPR, RFP Prep..
Construction of 200 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for GOBINDAPUR Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block.
Laying dist. system and constn. of RCC OHR of 600 cum capacity along soil investigation of KAMARHATI _Zone-I_ and its adj. mouzas W.S. Scheme of Raina - II Block under Burdwan Division_ PHE. Dte.
Soil investigation, Survey, Design, Supply of all materials, Labour, required for construction, erection, completion, testing and commissioning of water supply works such as repairing of RCC OHT,Rising main, Distribution system,Tube wells etc.
Construction of 200 cum. capacity R.C.C OHR as per Departmental design, drawing and specification, including bored pile,pile cap and Soil Investigation at Sindrani (Zone-I) Water supply Scheme, under Barasat Division, P.H.E. Dte.
Construction of 200 cum cap. 20 Mtr. staging height RCC Over Head Reservoir including ............... including soil investigation for PRATAPPUR-Zone-II and its adj.mouzas W.S. scheme under Durgapur Sub-Division_under Burdwan Division_ P.H.E. Dte.
Augmentation of MOUGRAM ZONE-II Piped Water Supply Scheme with LDS, FHTC Construction of 300 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under Ketugram-II Block, District Purba-Burdwan
Design,Const.Commi.of 01 no.GLR (capacity 400 cum) with pump house inclu. Soil Investigation,LT, Chlorine Guard Room,other ancillary civil works for Hasnabad Surface Water Based Piped WS Scheme under Barasat Division,PHE Dte
Survey Soil investigation Design Supply of all materials labour TandP etc required for construction erection completion testing and commissioning of water supply works such as RCC OHT Pumping Station Rising main Feeder main Distribution
Laying of Distribution System including specials, valves...Construction of 550 Cum Capacity 20 Mtr. Staging Height RCC Over Head Reservoir...Soil Investigation...at Betai Zone-I to accommodate FHTC under Nadia Divn, PHE Dte.
Construction of 300 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for JAGOTIPOTA Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block.
Construction of Different capacity O.H.R., with Soil investigation......different (6 nos). PIPED WATER SUPPLY SCHEME within LABPUR Block including supply of all labour and materials under Bolpur Sub-Division within Birbhum Division, PHE Dte
Survey Soil investigation, Design, Supply of all materialsetc. Required for construction of Tube Wells,Pump House,Over Head Tanks, SCADAroom, Rising Main, Distribution Network, House connection,Boundary wall,MS gate,site development work etc.
Hiring of GIS Implementation Agency for Survey, Software Development and Master Planning related activities - Defence Land; Soil investigation and contour survey; 2D; Survey Expert; Not Required to be Provisioned by Service Provider; Service provider..
Hiring of GIS Implementation Agency for Survey, Software Development and Master Planning related activities - Defence Land; Soil investigation and contour Survey; 2D; Survey Expert; Not Required to be Provisioned by Service Provider; Service provider..
Hiring of Consultants - Milestone/Deliverable Based - Structural Design, Topographical Survey, Soil Investigation and Estimate on SSR 2020, Abstract & Yardstick including BOQ and Current Market Rate analysis for Provn of Fmn Amn Storage Facility (FA..
Hiring of Consultants - Milestone/Deliverable Based - CONSULTANCY SERVICES FOR PREPARATION AND SUPPLY OF STRUCTURAL DESIGNS & DRAWINGS, SOIL INVESTIGATION FOR BUILDINGS AND ASSESSED MR FOR PREPARATION OF ESTIMATE FOR PROVN OF STORE ROOM, GUARD POST, ..
Construction of 200 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for HOGALKURIA Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block.
Sinking Of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 2nos 400 cum OHR ( Intze type with pile foundation ) 3 Nos 300 Cum OHR Accommodate FHTC(10944 Nos) under JJM
Visiting site, collecting all required data, information etc., conducting land survey, soil investigation etc and preparation of drawing, structural design and estimate/DPR, structural details and working drawing along with quantity assurance plan fo
Soil Investigation for construction of a proposed single vent sluice at left embankment of Gaighata Khal at Paschim khalna, G.P- Khalna Block-Amta-II ,P.S-Joypur, District-Howrah under LDC Sub-Division No-I.
Engineering Study including Road Inventory, Topographical Survey, Traffic Study, Pavement Soil Investigation etc. and submission of Reports for Boinchee Bhastara Majinan Belmuri Road from 0.00 Kmp. to 11.30 km. under jurisdiction of HHD I
Engineering Study including Road Inventory, Topographical Survey, Traffic Study, Pavement Soil Investigation etc. and submission of Reports for Moshat - Dhitpur Road from 0.00 Kmp. to 11.26 km. under jurisdiction of Serampore Highway Sub-Division
Laying of Distribution System, Providing FHTC, Soil investigation, Construction of 350 cum capacity OHR, Construction of Pump House, Boundary Wall, Service Road, for BALIBHARA in under N 24Pgs W/S Div-I, PHE Dte
Sinking of deep tubewell....Pump,Chlorine room with sanitary arrangements,Boundary wall,Soil Investigation,Land development,Rising main,Laying distribution,road restoration for Zone-I,II...Providing FHTC....Kashtagara WS Scheme, under BIRBHUM Divn.
Construction of 250 cum capacity 20 Mtr. staging height RCC Over Head Reservoir ................. specials including soil investigation for TARAPOSH and its adjoining mouzas W.S. scheme under Burdwan Sub-Division under Burdwan Division PHE Dte.
Soil Investigation for Construction of 01 (One) No of Overhead Reservoir, Construction of 500 Cum capacity .....providing Functional House Hold Tap Connection (FHTC)....Baruihuda water supply ...under Nadia Arsenic Civil Division - II P.H.E. Dte
Construction of 250 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for GANGAJOARA Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block.
Laying of Distribution System including specials, valves...Construction of 300Cum Capacity 20 Mtr. Staging Height RCC Over Head Reservoir...Soil Investigation...at Maidanpur to accommodate FHTC within Chapra Block under Nadia Divn, PHE Dte.
Survey, soil investigation, design, supply of all materials, labour, TP etc. for construction, erection, completion, testing and commissioning of water supply works such as RCC OHT, CWR cum pump house, rising main, distribution System
Sub Surface Based PWS Scheme with LDS, FHTC, Construction of different capacity RCC OHRs with 20.0 mtr. with Staging height including soil investigation ........ of TAHERPUR PWS Scheme under Galsi-II Block, District- Purba-Bardhaman.
Engagement of Surveying Agencies for carrying out Route Alignment, Detailed survey and detailed soil investigation of transmission scheme Establishment of 400/220 kV Saswad (Dist. Pune) and associated lines under TBCB in WR-I
Preparation of DPR including Soil Investigation and Determination of field data for Kuli-Moregram road from 24.45 Km to 36.45 Km under Kandi Highway Sub-Division under Murshidabad Highway Division No.II during 2022-23
Augmentation of SRIDHARPUR PWSS with LDS FHTC Rising main with necessary interconnection Construction of 200 cum capacity OHR with 20.0 mtr Staging height inclusive of soil investigation under Burdwan-I Block Dist Purba-Burdwan
Construction of 150 cum. capacity R.C.C OHR as per Departmental design, drawing and specification, including bored pile,pile cap and Soil Investigation at Sindrani (Zone-II) Water supply Scheme, under Barasat Division, P.H.E. Dte.
Construction of Boundary wall Soil investigation Construction and Commissioning of RCC OHR of capacity 250 cum and Accommodate FHTC under JJM for Sholkamari PWSS in Midnapore Sadar block under Midnapore Division PHE Dte. PART_B