Loading…
Loading…
280 results • Best match
Geotechnical investigation services in the bed of Mir alam tank for sub soil exploration and determination of Engineering properties of soil
GEOTECHNICAL INVESTIGATION (SUBSURFACE) FOR WARDHA PROJECT
Construction of High level Bridge at Km 18/4-6 (Near Dargapally Village) on Macahapur-Nanganoor road in SIddipet District Sub work:- Conducting Soil Exploration and presurvey (Preliminary Sub Soil Investigation) for proposed HLB
Geotechnical Investigation of proposed construction site at Khajaguda, Hyderabad.
Construction of ROB @ Km.74/6 of Khammam- Devarapally road in Khammam- District. Sub Work :- Conducting sub-soil Investigation
Construction of RUB in lieu of LC No.120T at Motumarri in Khammam District Sub-work:-Preliminary sub soil investigation
Construction of HLB at Km.57/6-58/2 of Suryapet - Aswarapet Road in Khammam District. Sub Work:- Preliminary Sub-soil Investigation work for HLB Construction of HLB at Km.57/6-58/2 of Suryapet - Aswarapet Road in Khammam District. Sub Work:- ... Preliminary Sub -soil ... Sub- soil Investigation work
Geotechnical Investigation of proposed construction site at CBI Residential Colony, Guttala Begumpet, Jubilee Hills, Hyderabad.
Conducting Sub-soil Investigation work for Construction of HLB at km.10/2-4 on NH-16 to Bheemgal (via) Velpur road in Nizamabad District.
Main Work: Construction of HLB on Vattimalla -Nimmapalli road Konaraopet (M) in Rajanna Siricilla District. Sub-Work: Conducting Pre-Survey and Sub-Soil Investigation work.
Main Work: Construction of HLB on Bavusaipet - Venkatraopet road Konaraopet (M) in Rajanna Siricilla District. Sub-Work: Conducting Pre-Survey and Sub-Soil Investigation work.
Conducting Sub-soil Investigation work for Construction of HLB at km.6/4-8 on NH-16 to Bheemgal (via) Velpur road in Nizamabad District.
Re-Construction of HLB at km 14/4-6 on Madnoor - Pothangal in Kamareddy District ( Sub-work: Preliminary sub soil investigation for work proposed HLB)
Construction of High Level Bridge at Km.6/0 - 4 on Bayyaram - Mutyalammagudem road in Mahabubabad Dist. Sub - Work:- Conducting Pre Survay and Sub - Soil Investigation.
Main Work: Construction of HLB on Mamidipally - Nizamabad road Mamidipally, Konaraopet (M) in Rajanna Siricilla District. Sub-Work: Conducting Pre-Survey and Sub-Soil Investigation work.
Re-Construction of HLB at km 8/8-10 of Bichkunda -Dongli road in Kamareddy District ( Sub-work: Preliminary sub soil investigation for work proposed HLB)
Construction of HLB across Gunde Vagu (4 vents of 10 m) near Gangasthan in Nizamabad district. Sub work:- Pre-survey and Preliminary sub-soil investigation work
FDR to Construction of HLB at Km 7/0-2 on Vemulawada - Korutla Road in Rajanna Sircilla District. (sub work:Conducting Pre-survey and Sub-soil Investigation work.)
Preliminary Sub Soil investigation for the proposed constructions of HLB's at Km18/2-4 ( Proposed for 2 vents of 10m) on Kangti- KOdapgal road in Kamareddy District.
Main Work: Construction of HLB at Kondapoor (V) on Pente Vagu, Konaraopet (M) in Rajanna Siricilla District. Sub-Work: Conducting Pre-Survey and Sub-Soil Investigation work.
Enquiry for Consultancy Services Towards Geotechnical Investigation for Machine Foundation at BHEL Corp R n D Hyd
FDR to construction of HLB at Km 9/6 to 9/8 on Pegadapally - Gundi road in Karimnagar District Sub work :- Pre- Survey and Sub Soil investigation work.
Preliminary Sub- Soil investigation for the proposed Construction of HLB at KM 3/6-8, 17/4-6 & 19/2-47 on Maddelacheru- Pitlam road in Kamareddy District.
Re-Construction of HLB at km 8/750 to 8/950 on Takkadpally-Jukkal road in Kamareddy District ( Sub-work: Preliminary sub soil investigation for work proposed HLB)
Conducting Pre-survey and sub-soil investigation work for the proposed construction of HLB at Km 2/8-10 on Bhavanipet - Gajasingavaram Road, Near Bhavanipet village in Kamareddy district.
Priliminary sub soil investigation work for the Proposed construction of HLB at Km 7/8-10 (proposed for 10 vents of 10m) on Shanthapur-Dadgi road in Kamareddy District
Widening and Strengthening of Panagal - Nakrekal road to Indloor road from Km 0/0 to 11/2 in Nalgonda District ( sub work: conducting sub soil investigation work for HLB
FDR to Construction of HLB (High Level Bridge) at Km 3/2 on Kunaram - Mutharam road in Peddapally District Sub work:- Conducting Pre-survey and Sub-soil Investigation work.
Survey and Preliminary Sub- Soil Investigation work for the construction of High Level Bridege( 7 vents of 10m) at Km 17/4 on Kapri to Bela road in Adilabad District .
Reconstruction of HL Bridge and Providing CC pavement on Mahabubnagar - Nalgonda road at Km 155/6-10 in Nalgonda District sub estimate for conducting the preliminary sub soil investigation work
Reconstruction of High Level Bridege at Km 0/8 to Kuntala waterfall Road in Adilabad District Under FDR Scheme . Sub Work:- Pre- Survey and Preliminary Sub- Soil Investigation work for HLB
FDR to Construction of 2v of 10m span HLB at Km 8/2-4 on Venkatraopally-Mallapur-Illantakunta Road in Rajanna Sircilla District. (sub work:Conducting Pre-survey and Sub-soil Investigation work.)
Construction of Flyover at Marriguda at Km 13/6 to 14/0 on NAM Road in Nalgonda District (Sub work : Conducting pre survey and preliminary sub soil investigation work for proposed flyover)
FDR to Construction of 2v of 10m span HLB at Km 6/2-4 on Venkatraopally-Mallapur-Illantakunta Road in Rajanna Sircilla District. (sub work:Conducting Pre-survey and Sub-soil Investigation work.)
FDR to Construction of High Level Bridge (4V of 10.0M) at km 6/4-6/6 on Molangur to Veenavanka road in Karimnagar District. Sub Work :- Pre-Survey and Sub Soil Investigation Work.
FDR to Construction of High Level Bridge (4V of 10.0M) at km 14/8-15/0 on Jammikunta-Tanugula-Vavilala road in Karimnagar District, Sub Work :- Pre-Survey and Sub Soil Investigation Work.
FDR to Construction of 10v of 10m span HLB at Km 8/4-6 on Machareddy-Mustabad-Siddipet Road (CRN) in Rajanna Sircilla District. (sub work:Conducting Pre-survey and Sub-soil Investigation work.)
Estimate for geotechnical investigation and total station survey at proposed construction of multipurpose complex at Anees-ul-Ghurba orphanage complex, Nampally,Hyderabad
Construction of ROB inlieu of L.C. No. 49/A at Railway Km 275/46-48 of Kazipet 0 Ballarsha Section in Peddapally Dist. Sub work :- Conducting Sub soil Investigation work for ROB (2nd Call)
Conducting Pre-survey and sub-soil investigation work for the proposed construction of Minor Bridge HLB at Km 2/6-8 on Palvancha marri-Bhiknoor road (via) Janagamarri near Wai village in Kamareddy district.
Conducting Pre-survey and sub-soil investigation work for the proposed construction of Minor Bridge HLB at Km 12/4-6 on Palvancha marri -Bhiknoor Road via Janagamarri Near Mamdapur village in Kamareddy district.
Reconstruction of HLB at Km 15/2 on Kapri to Bela Road in Adilabad District under FDR Scheme Sub work Pre survey and sub-soil investigation work for the HLB at Km 15/2
Construction of Bridge at Km 18/6 on Sirpur - Methaldini Road in Asifabad District. Sub-work : Preliminary sub-soil investigation work for the proposed construction of Bridge (proposed for 5 vents of 10 m)
Soil investigation
Construction of High level Bridge at Km 0/2-4 of road from Waddepally church junction to Unikicherla via Nirupnagar thanda in Warangal Urban Dstrict sub-work: Conducting Preliminary sub soil Investigation work for HLB
Construction of 3V of 10m span minor bridge at km 8/2-4 on road from NH44 to Domakonda via Peddamallareddy in Kamareddy district (Sub-work: Preliminary Sub Soil Investigation for work for proposed HLB)
Construction of HLB at km 15/2-4 on road from Bibipet to Siddipet R&B road via Issanagar, Peddamallareddy, Issannapally in Kamareddy district (sub-work: Preliminary Sub soil Investigation for work for proposed HLB)