Loading…
Loading…
280 results • Best match
KTPS-I to IV Stages-Conducting geological/geotechnical investigation in proposed 8MW solar power project opposite to Navabharat temple at Palvancha, Bhadradri-Kothagudem (Dist.).
Improvements by Widening and Strengthening of the from Mancherial IB to Kyathanpally on Hyderabad-Karimnagar-Chanda road from Km.251/900 to 255/700 of Mancherial District (Sub-Work:- Conducting Pre survey and Sub soil investigation)
Estimate for Consultancy services for conducting sub-soil investigation for Construction of ROB on L.C.No.18/JB on Nizamabad Bodhan section of Hyderabad -Medak-Bodhan road at km 182/8-10 in Nizamabad District.(2nd call)
GEOTECHNICAL INVESTIGATION WORK FOR HIGH-SPEED ELEVATED RAIL CORRIDOR BETWEEN HYDERABAD-CHENNAI. (Package-1)
GEOTECHNICAL INVESTIGATION WORK FOR HIGH-SPEED ELEVATED RAIL CORRIDOR BETWEEN HYDERABAD-BENGALURU (PACKAGE-2)
GEOTECHNICAL INVESTIGATION WORK FOR HIGH-SPEED ELEVATED RAIL CORRIDOR BETWEEN HYDERABAD-BENGALURU. (Package- 1)
GEOTECHNICAL INVESTIGATION WORK FOR HIGH-SPEED ELEVATED RAIL CORRIDOR BETWEEN HYDERABAD-CHENNAI. (Package-2)
GEOTECHNICAL INVESTIGATION WORK FOR HIGH-SPEED ELEVATED RAIL CORRIDOR BETWEEN HYDERABAD-BENGALURU. (Package- 2)
Construction of ROB in liew of LC.No.90 at Railway Km.460/6-8 of Kazipet - Vijayawada Section and at Km.14/2-4 of Satyanarayanapuram - Dornakal road in Mahabubabad Dist. Sub - Work:- Conducting Sub - Soil Investigation.
Construction of Major Bridge at Km 22/727 on Munugode - Nampally road in Nalgonda District ( sub work: conducting sub soil investigation for proposed HLB at Km 22/6-8 on Munguode to Nampally road in Nalgonda District
Hiring of Consultants - Milestone/Deliverable Based - soil investigation; soil investigation; Yes; Onsite
Construction of High Level Bridge at Vemulawada - Sirikonda road at Km.7/2-4 at Hanumajipet Rajanna Sircilla District. Sub-Work:- Conducting Pre-survey and sub soil Investigation work for the proposed construction of HLB (10Vents of 10m)
Widening and Strengthening of Cherlapally at NAM road to Pitttampally from Km 0/0 to 5/4 in Nalgonda District ( sub work: Conducting presurvey and sub soil investigation work for the proposed HLB at Km 1/2-4
Conducting Pre-survey and sub-soil investigation work for the proposed construction of HLB at Km 4/2-4 on Karimnagar-Kamareddy-Yellareddy (R&B) road to Reddypet (Via) Arepally, Singharaipally road near Gudem village in Kamareddy district.
Construction of ROB in lieu of LC No.129 across railway line at Km.545/5-6 of Kazipet-Vijayawada section in Km.0/0 of Yerrupalem-Jamalapuram road in Khammam District Sub-work:-Preliminary sub soil investigation
Construction of HLB (10 vents of 10m span) across phulong Vagu on NH-63 to Manikbandar road near Mubaraknagar of Makloor mandal in Armoor Constituency in Nizamabad district. Sub work:- Pre-survey and Preliminary sub-soil investigation work
Construction of Minor Bridge at Km 14/912 on Munugode - Nampally road in Nalgonda District ( sub work :- conducting sub soil investigation for proposed minor bridge at Km 14/8-10 on Munugode to Nampally road in Nalgonda District)
Construction of Major Bridge at Km 23/8-10 on Munugode - Nampally road in Nalgonda District ( sub work;- conducting sub soil investigation for proposed HLB at Km 23/8-10 on Munguode to Nampally road in Nalgonda District
Construction of ROB in lieu of LC No.107T across railway line at Km.493/1-2 of Kazipet-Vijayawada section in Km.0/4-6 of Ramakrishnapuram-Peddagopathi road in Khammam District Sub-work:-Preliminary sub soil investigation
Construction of New BG line between Bhadrachalam road to Sathupalli Station ROB No.50 on V-J Road NH-30 in Bhadradri Kothagudem Dt. Sub Work: Conducting Sub Soil investigation at Km 93/2-4 on V-J Road.
Construction of ROB in lieu of LC No.113E across railway line at Km.505/28-30 of Kaipet-Vijayawada section in Km.6/4-6 of Chintakani-Nagulavancha road in Khammam District Sub-work:-Preliminary sub soil investigation
Proposed Construction of ROB in lieu of LC No. 191 on Secunderabad - Manmad Line on Byepass Road to Nizamabad Town at Km 10/4-6 in Nizamabad District. (Sub-work : Preliminary sub-soil investigation work for the proposed ROB)
Construction of ROB in lieu of L.C.No.54 at Railway Km 313/24-26 of Kazipet -Secunderabad Section on Peddapendyal -Punnel road at Ch.0/0-2 in Warangal Urban District Sub Work:Conducting Sub soil Investigation work for ROB
Survey and Soil Investigation
Survey and Soil Investigation
Survey and Soil Investigation
Geotechnical Investigation and Topographical survey work for Flue Gas Desulphurization system of Unit 12, at 1 X 800 MW at Kothagudem Power Project, Khammam District, Telangana State
Construction of ROB in lieu of L.C. 34 at Railway Km 304/14-16 of Kazipet -Ballarsha section on Sulthanbad - Kalvasrirampur road at Km 11/6-8 in Peddapally Dist. Sub Work :- Conducting Sub - Soil investigation work for ROB (2nd Call)
Construction of ROB in lieu of L.C.No.1 at Railway Km 362/22-24 of Kazipet -Ballarsha Section on Hanamkonda -Malkapur road at Ch.7/6-8 in Warangal Urban District Sub -Work: Conducting Sub Soil Investigation work for ROB
Construction of ROB in lieu of L.C No.67 at Railway Km.391/4-6 of Kazipet - Vijayawada section on Ookal - Thorrur road at Km.7/0-2 in warangal Rural District. Sub - Work: Conducting Sub Soil Investigation work for ROB
Construction of HLB at Km 34/4-6 on Adilabad - Boath road in Adilabad District. Subwork: Pre-survey and Preliminary sub-soil investigation work for proposed construction of HLB at Km 34/4-6 on Adilabad - Boath road in Adilabad District.
Topo Survey and Soil Investigation
SOIL INVESTIGATION AT BPCL MALKAPUR
Construction of ROB in lieu of L.C No. 40 at Railway Km 291/8-10 of Kazipet - Ballarsha sction on Peddapally Goureddypet road at Km 0/6-8 in Peddapally Dist. Sub Work :- Conducting Sub - soil Investigation work for ROB (2nd Call)
Conducting detailed survey and preparation of discharge calculation drawings for construction of HLB at km 6/6-8 on NH-44 to Tadwai via Takrial road in Kamareddy District( Sub-work: Pre-Survey and Preliminary sub soil investigation work for proposed HLB)
Improvements and widening of road from 1. Nagaram to Sangam road from Km 0/0-6/0 and 2. Regalla to Karakavagu road from Km 0/0-5/4 in Bhadradri Kothagudem DIstrict Subwork: Conducting pre survey and preliminary sub-soil investigation
Construction of ROB in lieu of L.C No.64 at Railway Km.381/28-30 of Kazipet - Vijayawada section on Hanamkonda - Narsampet - Mahabubabad road at Km.7/4-6 in warangal Rural District. Sub - Work: Conducting Sub Soil Investigation work for ROB
Construction of HLB at Km. 35/8-10 on Adilabad - Boath road in Adilabad District. Sub Work: Pre-survey and Preliminary sub-soil investigation work for proposed construction of HLB at Km 35/8-10 on Adilabad - Boath road in Adilabad District.
Construction of HLB in place of Existing low level causeway at Km 25/8 & Km 38/8 on Adilabad to Boath Road in Adilabad District .Sub work:- Pre- Survey and Preliminary Sub- Soil Investigation work for the proposal HLB At Km 38/8.
Conducting detailed survey and preparation of discharge calculation, drawings for construction of HLB at km 4/8-10 on NH-44 to Tadwai via Takrial road in Kamareddy District( Sub-work: Pre-Survey and Preliminary sub soil investigation work for proposed HLB)
Conducting detailed survey and preparation of discharge calculation, drawings for construction of HLB at km 3/0-2 on NH-44 to Tadwai via Takrial road in Kamareddy District ( Sub-work: Pre-Survey and Preliminary sub soil investigation work for proposed HLB)
Construction of HLB at Km 34/2-4 on Adilabad - Boath road in Adilabad District. Sub Work: Pre-survey and preliminary Sub-soil investigation work for the proposed construction of HLB at Km 34/2-4 on Adilabad-Boath road in Adilabad District.
Construction of ROB in lieu of L.C.No.60/E at Railway Km.369/14-16 of Kazipet - Vijayawada section on Fathimanagar to Mamnoor road at Km 0/8-10 in Warangal Urban District Sub -Work : Conducting Sub -Soil Investigation Work for ROB
Construction of Four Lane ROB in Lieu of LC No.18T Interlocked at Railway Km 35/5-6 of Karimnagar - Jagtial Section and at Km 54/6-8 of Rayapatnam - Kodad road in Karimnagar District Sub Work:- Conducting Preliminary Sub Soil Investigation Work