Loading…
Loading…
665 results • Best match
EXIDE SPV application 100 12 V (for SPV application) Polypropylene, EXIDE SPV application 100 12 V (for SPV application) Polypropylene (PP)
POWERSTACK SPV application 100 12 V (for SPV application), POWERSTACK SPV application 100 12 V (for SPV application) Styrene-acrylonitrile (SAN)
Supply of Spares of Solar Power Obstruction Lights installed on the hill tops at Gaya Airport, Gaya
POWERSTACK SPV application 100 12 V (for SPV application), POWERSTACK SPV application 100 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
EXIDE SPV application 40 12 V (for SPV application) Styrene-, EXIDE SPV application 40 12 V (for SPV application) Styrene-acrylonitrile (SAN)
POWERSTACK SPV application 100 12 V (for SPV application), POWERSTACK SPV application 100 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
ENERTEX SPV application 200 12 V (for SPV application) Acrylonitrile, ENERTEX SPV application 200 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
SUPPLY, INSTALLATION & COMMISSIONING OF 10 FEET HEIGHT ON-GRID BASED WOOD FINISH GI SOLAR TREE WITH 1 KW SOLAR PV PANEL, 2 KW ON-GRID INVERTER AND ACCESSORIES AS PER THE DETAILED SPECIFICATION ENCLOSE
Solar Photovoltaic Modules/Panels - Crystalline silicon terrestrial (Q3) MSE Exemption for Years of Experience and Turnover
Supply, Installation, Testing and Commissioning of On grid Solar Photovoltaic Power Plant at GPOA complex, Patna.
ON GRID SOLAR AS PER NIT
Custom Bid for Services - PROVIDING AMC FOR CP SYSTEM FOR MSV : 1-6 AT BPCL PATNA LPG PLANT Similar Category AMC/CAMC of Solar Energy Power Plants
Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service - On-Grid system without battery; 650; 6
Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service - On-Grid system without battery; 150; 3
Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service - On-Grid system without battery; 650; 6
Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service - On-Grid system without battery; 488; 2
SITC of 15KWp off grid solar power station at Border Out Post Kamla of 48th bn Jaynagar under SHQ,SSB,Muzaffarpur
Custom Bid for Services - Operation and Maintenance contract for 5 Years of 5000 Kw Ac 13ILR65 Dc capacity grid connected ground mounted solar PV system at Nalanda University Rajgir DistrictNalanda Bihar
Upgradation of Patna Medical College & Hospital under PMSSY (Phase-IV). SH:- C/o Sub-station i/c Providing and Fixing IEI & Fans, Lift, Electrical Sub-station, DG Set, UPS, Fire Alarm System, Solar PV panel & Solar Water Heating System, Package-II, III & IV (Balance worrk)
DC SPV Deep Well Submersible Pumping
Design Supply Installation Testing and Commissioning of on grid 60 kWp Rooftop Solar Plant on New Technical Block in Operational Area at Gaya Airport Gayaji
Unbranded 1 horsepower DC SPV Deep Well Submersible, Unbranded 1 horsepower DC SPV Deep Well Submersible Pumping Systems
Custom Bid for Services - Dismantling Testing and Commissioning for 3UA and 3UB damaged parts of busduct at NSTPS Nabi Nagar 3X660 MW Project Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Ground ... Mounted Solar Power Plant Service ... Top Solar Power Plant Service ...
Engineering, Procurement, Construction (EPC) inclusive of 1 Year Comprehensive Operation and Maintenance (O and M) of 120 KWp On-Grid Roof Mounted (Solar and Grid or DG) Captive Solar Power Project at IOCL,Patna Terminal
AC SPV Deep well (submersible) Pumping Systems
DC SPV Deep Well (Submersible) Pumping Systems
AC SPV Deep well (submersible) Pumping Systems
SITC of 15KWp off grid solar power station each in 03 Border Out Posts(BOPs) Bop Harpur kalan Bop Majorganj and Bop Bhanga of 20th bn sitamarhi under SHQ,SSB,Muzaffarpur
Custom Bid for Services - 200137206 - Service contract for O&M activities of 3MW solar plant at NTPC Kahalgaon Similar Category Operation and Maintenance Power House/Power Plant
As per schedule
AC SPV Deep well (submersible) Pumping Systems (Q3)
AC SPV Deep well (submersible) Pumping Systems (Q3)
DC SPV Deep Well (Submersible) Pumping Systems (Q3) (
DC SPV Deep Well (Submersible) Pumping Systems (Q3)
DC SPV Deep Well (Submersible) Pumping Systems (Q3)
DC SPV Deep Well (Submersible) Pumping Systems (Q3)
DC SPV Deep Well (Submersible) Pumping Systems (Q3)
Custom Bid for Services - FIRE INSURANCE FOR 1 YEAR FOR 125 MWP SOLAR POWER GENERATION SYSTEM WORK IN OFFICE BLOCKS AND RESIDENTIAL BLOCKS FOR NBCC INDIA KIDWAI NAGAR EAST NEW DELHI, Custom Bid for Services - MBD EEI INSURANCE FOR 1 YEAR FOR 125 MWP ... MWP SOLAR POWER GENERATION ... MWP SOLAR POWER GENERATION ...
BSO ENGG Engineering, Procurement, Construction (EPC) inclusive of 1 yr comprehensive Operation and Maintenance of about 315 KWp on grid roof / vertical wall / solar tree mounted captive solar power project at IOCL new green office building of BSO
Unbranded Float application 100 12 V (for SPV application), Unbranded Float application 100 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
POWERSTACK Float application 100 12 V (for SPV application), POWERSTACK Float application 100 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
Unbranded Float application 60 12 V (for SPV application), Unbranded Float application 60 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
POWERSTACK Float application 60 12 V (for SPV application), POWERSTACK Float application 60 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
POWERSTACK Float application 100 12 V (for SPV application), POWERSTACK Float application 100 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
EXIDE XPRESS SPV application 80 48 V (for float application), EXIDE XPRESS SPV application 80 48 V (for float application) Polypropylene (PP)
Unbranded Float application 60 12 V (for SPV application), Unbranded Float application 60 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
Unbranded Float application 100 12 V (for SPV application), Unbranded Float application 100 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
EXIDE Float application 20 12 V (for SPV application) Acrylonitrile, EXIDE Float application 20 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
At NJP: Implementation of ground mounted grid connected solar PV system of project of 1MWp capacity at Dy.CMM/NJP Store Depot campus, N.F. Railway, New Jalpaiguri, W.B. through Public-Private Partnership (PPP) Design, build, operation and transfer ("the DBFOT") basis under RESCO model.
Design, Supply, Installation & Commissioning of Solar PV rooftop plant (Q3)