Loading…
Loading…
828 results • Best match
Provn. of 31 KW Roof top Solar System at Kendrapara-Jajpur ( Kendrapara-I Division 15 KW ,Kendrapara-II Division 16 KW)
Supply, Installation, and Commissioning of Roof top Solar power System at Saraswati Shishu Vidya Mandir, Bandhabahal, under the CSR works of Lakhanpur Area, MCL.
Supply, Installation, Testing and Commissioning of On-Grid Ground Mounted / Rooftop, 110 KW Solar Power Plants with Automation (SCADA, PLC) at STP , Basuaghai, Bhubaneswar
On-Grid Solar Photovoltaic Power Plant with Cumulative capacity of 390 kWp(capacity Smaller than 100 kWp) at different mines of OMC
On-Grid Solar Photovoltaic Power Plant with Cumulative capacity of 1610 kWp(capacity Greater than 100 kWp) at different mines of OMC
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Bargarh and Sonepur Divisions
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Kalahandi and Nuapada Divisions
Provn. of 25 KW Roof top Solar System at Balasore (Balasore Circle 10 KW , Balasore Division 10 KW , Jaleswar Division 5 KW )-
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Balasore Bhadrak Baripada Keonjhar
Supply, installation, testing and commissioning of Rooftop Captive Solar Power Plants of 30 KWp capacity at IOCL PPL Paradip (Odisha) with 2 Years Comprehensive Maintenance
Unbranded 1 horsepower DC SPV Deep Well Submersible, Unbranded 1 horsepower DC SPV Deep Well Submersible Pumping Systems
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based WSS along with CMC for five years pertaining to Kendrapada Athagarh BBSR Puri Angul Deogarh Div
Supply and installation of 45 KW On-Grid Solar power generation system to be installed at Housing scheme at Kalinga Nagar, Zone K-IX(B), Bhubaneswar
Repairing of damaged boundary wall in between DAV gate to Solar Plant and front of block no. 04 to DAV gate at Anand Vihar, MCL HQ
Installation of 30 KWP off grid roof top solar plant with battery at IIC complex, Banger, Gop, Puri. SH-Miscellaneous Electrical works in IIC complex building.
Tool kit Box portable, Electrical loads Set of Incandescent lamp Tube light CFL LED light Heater Geyser, Lamp Load Bank variable with 6 Steps Per Step Load 200W Current 5500mA 1200W, Batteries Inverter Transportation Trolley, Rooftop Mounting ... W solar panels ... Digital Solar Insulation ... software, Solar cell ... Ah, Solar simulator ... temp, Solar PV IV ... pen, Solar energy trainer ... load, Solar tracker ... 10W solar panel, ... panel, Solar PV e ... 48V, Solar PV 75W ... module, Solar PV 75 ... module, Solar PV 250W ... module, Solar PV 5W ... module, Solar PV 10W ... module, Solar PV 40W ... module, Solar PV panels ... Wp, Solar chargecontroller ... 10A, Solar chargecontroller ... No solar panel ... protection, Solar LEDlantern ... and Solar PV module, ... module, Solar CFLlantern ... and Solar PV module, ... module, Solar lantern ... loads, Solar cell ... Through Solar Panel ... PWM Solar Charge ... Wave, Solar PCU ... 4300mA, Solar Grid ... No, Solar Street ... controller, Solar wind ... 415V Solar PV 960W ... 100AH, Solar Traffic ... treatment solar plant demonstrator ... capacity, Solar DC ... 1HP Solar Panel ...
Digging of deep borewell and supply of water to village Padapali with solar system, Piplikani G.P. under CSR work of BOCM of Lakhanpur Area
Provn. of 55 KW Roof top Solar System at Jajpur (Kendrapara- Jajpur Circle 30KW , Jajpur-I Division 15 KW,Jajpur-II Division 10 KW)
Construction of dug-well and supply of water to Bhejikud Talpada with solar system, Piplikani G.P. under CSR work of BOCM of Lakhanpur Area
) Provn. of 45 KW Roof top Solar System at Cuttack (Cuttack Circle 20 KW , Cuttack-I Division 15 KW , Cuttack-II Division 10 KW, )
Design, Supply, Civil Work, Erection, Testing, Commissioning etc..for Grid Connected 1.21 MWp aggregated capacity of Solar PV Rooftop Projects including CAMC for a period of 05 Years after 1 year warrantee period located at different areas of MCL
Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service - On-Grid system without battery; as per scope of work; as per scope of work
Unbranded Float application 120 12 V (for SPV application), Unbranded Float application 120 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
Supplying all materials,labour,TandP and execution of RPWSand 2 Nos Solar PV integrated dual pump based WS system through off-grid mode to village NILAPARI and its adjoining habitations including five years O and M in Korukonda Block (40LPCD retro.)
SITC of 60kWp solar photovoltaic power system including its allied works etc as required at CCBF, Chiplima, Sambalpur, Odisha. SH:- Providing of LED glow sign boards and solar street light including allied works etc as required.
EXIDE Float application 40 12 V (for SPV application) Acrylonitrile, EXIDE Float application 40 12 V (for SPV application) Acrylonitrile butadiene styrene (ABS)
Supplying erection and commissioning of 9 nos. solar energy based PWS with 5000 ltr, capacity HDPE storage tank with 3 mtr. Staging height under block Anandapur, Ghasipura and Saharapada with 5 year O/M of RWSS Division Anandapur
13 KWp Off Grid with Battery backup Roof Mounted Captive Solar Power Project at IndianOil Talcher Plant Dist Angul Odisha with its further Comprehensive Operation and Maintenance for 4 Years.
Design, Installation, Supply, Civil works, Construction, Testing, Commissioning of 500 kW on-grid solar photovoltaic trees including Comprehensive Annual Maintenance Contract (CAMC) for a period of 05 Years
POWERSTACK 12 V (for SPV application) Valve Regulated Lead Acid, POWERSTACK 12 V (for SPV application) Valve Regulated Lead Acid Battery, Battery Capacity - 60 Ah
Unbranded 12 V (for SPV application) Valve Regulated Lead Acid, Unbranded 12 V (for SPV application) Valve Regulated Lead Acid Battery, Battery Capacity - 150 Ah
Unbranded 12 V (for SPV application) Valve Regulated Lead Acid, Unbranded 12 V (for SPV application) Valve Regulated Lead Acid Battery, Battery Capacity - 100 Ah
Deployment of approach road to the project site at Tentulipada Mouza of Junagarh Tahasil under Kalahandi district for implementation of 10MW on-grid solar power project in the district of Kalahandi
Provn. of 30 KW Roof top Solar System at RW Circle Baripada( Baripada Circle 8 KW , Baripada Division 8 KW , Rairangpur Division 6 KW, Karanjia Division 8 KW)
Supplying all materials, labours and TandP for installation, testing, commissioning of 16 (Sixteen) nos of solar energy based PWS with 5000 ltr capacity HDPE storage tank with a staging height of 3.00 mtrs. Including 5 (five) years O and M
EXIDE 12 V (for SPV application) Valve Regulated Lead Acid Battery,, EXIDE 12 V (for SPV application) Valve Regulated Lead Acid Battery, Battery Capacity - 120 Ah
Unbranded Polycrystalline Off-Grid Solar Photovoltaic (PV) power plant, Capacity 3 kVA Brand: NA (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687788084832 dt.12/0
Supplying all materials, labours and T and P for installation, testing, commissioning of 24 (Twenty four) nos of solar energy based PWS with 5000 ltr capacity HDPE storage tank with a staging height of 3.00 mtrs. Including 5 (five) years O and M
Supply, installation, testing and commissioning of 9 Nos. of Solar energy based PWS with 5000 litter capacity HDPE storage tank with a staging height of 3 mts including 5 years O and M at Schools and AWC of Khairput Block in Malkangiri District.
Supply, installation, testing and commissioning of 6 Nos. of Solar energy based PWS with 5000 litter capacity HDPE storage tank with a staging height of 3 mts including 5 years O and M at Schools and AWC of Mathili Block in Malkangiri District
Supply, installation, testing and commissioning of 8 Nos. of Solar energy based PWS with 5000 litter capacity HDPE storage tank with a staging height of 3 mts including 5 years O and M at Schools and AWC of Chitrakonda Block in Malkangiri District
Supply, installation, testing and commissioning of 6 Nos. of Solar energy based PWS with 5000 litter capacity HDPE storage tank with a staging height of 3 mts including 5 years O and M at Schools and AWC of Malkangiri Block in Malkangiri District.
Supply, installation, testing and commissioning of 6 Nos. of Solar energy based PWS with 5000 litter capacity HDPE storage tank with a staging height of 3 mts including 5 years O and M at Schools and AWC of Podia Block in Malkangiri District
Supply, installation, testing and commissioning of 7 Nos. of Solar energy based PWS with 5000 litter capacity HDPE storage tank with a staging height of 3 mts including 5 years O and M at Schools and AWC of Kalimela Block in Malkangiri District
Supply, installation, testing and commissioning of 8 Nos. of Solar energy based PWS with 5000 litter capacity HDPE storage tank with a staging height of 3 mts including 5 years O and M at Schools and AWC of Korukonda Block in Malkangiri District.
Design engineering supply installation commissioning testing and ONM ofGrid connected Solar PV
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 70 KWP SOLAR PV PLANT (Q3)
Execution of Landscaping, External electrification, Networking system, fire detection AND fire fighting system, Solar System, Interior works, HVAC system including supply, installation and commissioning of Lift, DG Sets and other allied works f
SPL REPAIR TO BLDG NO P21 OR INSTITUTE PROVN OF CHAIN LINK FENCING POWER CIRCUIT/WIRING ALONGWITH CONNECTED ITEMS AND ROOF ROP SOLAR SYSTEM AT BHUBANESWAR MILITARY STATION UNDER GE I GOS
Design, Engineering, Procurement and Supply, Construction, Erection, Testing, Commissioning, and Comprehensive Operation and Maintenance for 10 Years of 10 MW (AC)/12 MWp Solar Photovoltaic Grid-Connected Power Plant at Paradip Port Authority.