Loading…
Loading…
2,246 results • Best match
Request for Price bid/Tariff bid (RfP) are invited from eligible bidders of EoI TN-DSM-81 for setting up grid connected solar power plants under PM-KUSUM A of 2 MW Solar Power Plant at CHAMPLA GSS (1043461) under Jaisalmer District
Request for Price bid/Tariff bid (RfP) are invited from eligible bidders of EoI TN-DSM-81 for setting up grid connected solar power plants under PM-KUSUM A of 2 MW Solar Power Plant at CHANDHAN GSS (1043451) under Jaisalmer District
PWRJT24078-Replacement of 1 MW solar capacity modules alongwith necessary cabling and connectors and integration with the existing systemat IOCL 5MW Solar power plant located at Rawra Village Tehsil-Bap District Jodhpur
2 KILOWATT SOLAR POWER PLANT (1 SET) (OF GRID) SUPPLY SOLAR MODULES, PCU INVERTER-RATING-2 KW, BATTARY GALVANIZED IRON STRUCTURE, EARTHING, DC WIRE AND AC CABLE AND ALL DEVICE WITH INSTALLATION
Contract for Security and Allied Services for Colony, ROW and Rawra Solar Plant under Jodhpur DS from DGR-sponsored agencies.
Spare Solar PV Modules at SIPS and SRS
Off-grid Roof-top Solar PV Power Plant
PROVN OF GROUND BASED SOLAR POWER GENERATION (SPV) 1MW CAPACITY AT ITARANA ALWAR MIL STN
Dismantling and Re-installations including providing net metering connection and 2 years Comprehensive maintenance of 100 KWp Roof Top Solar power plant two different locations of Jaipur International Airports
Custom Bid for Services - Comprehensive Annual Maintenance CAMC of Hitachi Make Inverters at NGEL Solar Power Plants for 03 years Similar Category AMC/CAMC of Solar Energy Power Plants
MANNING, OPERATION AND COMPREHENSIVE MAINTENANCE FOR SOLAR PHOTOVOLTAIC (SPV) POWER PLANT INSTTALLED AT SURATGARH, SRI GANGANAGAR AND KANASAR
Supply Installation and Commissioning of Solar PV rooftop at
Custom Bid for Services - Design Supply Installation Testing Commissioning Annual Maintenance Contract Of SCADA System At 5MW Solar Plant Of NICDC Neemrana Solar Power Ltd
SOLAR SYSTEM
Solar System
SITC OF ON GRID ROOF MOUNTED SOLAR PV PLANT OF
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
SITC of Roof Top Grid Connected Solar Power Plant in LM Sports Complex and Bed Minton Academy Back Side MM Ground Nathusar Bas Ward No 43 Bikaner ( Under MLA Fund Scheme) (EW)
Design_survey_installation_commissioning_25 yrs_O_M from COD of grid connected SPP through RESCO Mode_its associated line_33 or 11 KV to connect plant to 33_11 KV substation_RMS of Solar Power plant
Custom Bid for Services - Carrying out IV CurrentVoltage curve tracing work of Solar Photo Voltaic modules at IOCL 5MW SPV plant Rawra Similar Category AMC/CAMC of Solar Energy Power Plants
Solar Power GPS Handheld Navigator
Solar Power System 10 KW
solar plant sthapna karya Koshithal
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Solar Panel, Battery Bank, Inverter, Prefab Cabinet, Chain link fencing, Paver Blocks, CCTV, Tool Kit, LED Light with Pole, LED Light with High Mast, Aluminum armouredCable, Cable laying in trench, Mandatory Spares
JOB WORK ORDER FOR OUTSOURCING OF BILLING AND ADJUSTMENT SERVICES UNDER OPEN ACCESS FOR CAPTIVE POWER WITH WHEELING AND BANKING FOR 1 MW SOLAR POWER PLANT AT NORTH CAMP MFFR UNDER GE (N) BIKANER
Solar Power Plan
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant
Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant