Loading…
Loading…
251 results • Best match
SOLID WASTE MANAGEMENT PROJECT
Processing and Disposal of Legacy Municipal Solid Waste at Dhekiajuli Dump Site, through Bio Mining
Procurement of Equipment for Primary Collection System of Solid Waste for Municipal Solid Waste Management in Dibrugarh
Management and Processing of Legacy Waste and Fresh Municipal Solid Waste MSW at SWM Plant at Lekai, Ghoramora, Dibrugarh
Processing and Disposal of Legacy Municipal Solid Waste at Mangaldai Dump Site, through Bio Mining under 15th CFC (tied grant).
Scientific Bio-Mining and Remediation of Legacy Waste at Moilapatar Dumpsite
Selection of Agency for Processing and Disposal of Legacy Municipal Solid Waste at Barpeta Road Dumpsite through Bio Mining under BARPETA ROAD MUNICIPAL BOARD
Bio Mining of Legacy waste under Nagaon Municipal Board at Katimari Rangagarah Huz
Bio Mining Segregation of Legacy waste using Trammels, other allied infrastructure and manpower.
Construction of Proposed Solid Waste Management Plant at Silchar ULB of Assam Establishment and Commissioning of Material Recovery Facility MRF an Waste to Compost Plant W2C under SBM on Engineering, Procurement and Construction EPC Mode 1 Basis
Selection of agency for the work bio-mining of legacy waste and land reclamation at old dumpsites and disposal of residual waste in Barpeta
Selection of agency for the work bio-mining of legacy waste and land reclamation at old dumpsites and disposal of residual waste in Barpeta
Construction of Solid Waste Management Plant at Silagrant, Ward No-1 under North Guwahati Municipal board under 15 F/C Tied Grant
Construction of RCC Drain inside Dhemaji Municipal solid waste Management plant including CD work under 15th finance(Tied) for the year 2023-24 113 No. Dhemaji (ST) LAC
Construction of Solid Waste Management Office and other Accommodation with Boundary Wall of Barpeta Road Municipal Board at Khudnabari (Bogoriguri) under 15th FC Tied Grant (SWM Components)
NEW SOLID WASTE MANAGEMENT AND PROCESSING PLANT (MRF and W2C), MARIANI MUNICIPAL BOARD (Phase II)
SELECTION OF AGENCY FOR PROCESSING AND DISPOSAL OF LEGACY MUNICIPL SOLID WASTE AT SIVASAGAR DUMPSITE THROUGH BIO MINING
Land Development for Solid waste Management Project at Moridhal Khajua under 15th Finance Commission TIED grant
Establishment, Construction, Supply, Procurement, Fabrication, Installation of Machinery, Trial Run, and Commissioning of a 20 TPD Automatic Solid Waste Segregation Plant as per the Solid Waste Management (SWM) Rules, 2016
Construction of Boundary Wall at Sootea Solid Waste Management Plant(PH-II) under 15TH FC Tied Grant
Pkg 03 Rate Contract for containerized tricycle, battery rickshaws with garbage loader for solid waste collection and transportation and machineries for Plastic waste management units for solid waste management works under SBM G Assam
Pkg 01 Rate Contract for containerized tricycle, battery rickshaws with garbage loader for solid waste collection and transportation and machineries for Plastic waste management units for solid waste management works under SBM G Assam
Pkg 02 Rate Contract for containerized tricycle, battery rickshaws with garbage loader for solid waste collection and transportation and machineries for Plastic waste management units for solid waste management works under SBM G Assam
Solid Waste Management Scheme at Gossaigaon Town under 5th Assam Finance Commission for the year 2018-19
PROVN OF SOLID WASTE MANAGEMENT SYSTEM AND GARBAGE DISPOSAL SYSTEM AT MISSAMARI MIL STN UNDER GE MISSAMARI
Construction of Boundary Wall with Entry Gate(PH II) at Jamugurihat Solid Waste Management Plant Under 15th FC Tied Grant
Construction of Proposed SOLID WASTE MANAGEMENT PLANT at Digboi ULB of Assam under SBM on Engineering, Procurement and Construction EPC
Construction of brick boundary wall at Digboi Solid Waste Management ground for implementation of PMKKY under District Mineral Foundation Trust.
Custom Bid for Services - HANDLING OF SOLID WASTE MANAGEMENT IN GUWAHATI REFINERY TOWNSHIP TENDER No 9010C25B89 Similar Category Support Services
FOR SUPPLY AND INSTALLATION OF MATERIAL RECOVERY FACILITY MRF AND WASTE TO COMPOST W2C PLANT AND ASSOCIATED CIVIL WORKS UNDER SOLID WASTE MANAGEMENT COMPONENT OF SBM U 2 FOR THE YEAR 2024 25 15TH FC TIED GRANT UNDER LAKHIPUR MUNICIPAL BOARD G
Construction of Assam type building for office an chowkidar to monitor the Solid waste management plant paver block road and internal drain development of the site under Hojai MB
Construction of Proposed Solid Waste Management Plant at Tezpur ULB of Assam under SBM on Engineering, Procurement and Construction (EPC) Mode-1 Basis.
Construction of Waste to Compost Plant and Material Recovery Facility during the FY 2024-2025
Construction of Proposed Solid Waste Management Plant at Dhekiajuli MB of Assam under SBM on Engineering, Procurement and Construction (EPC) Mode-1 Basis
Appointment of agency for providing Technical Support for Decentralised Solid Waste Management through Community Engagement in ULBs of Assam under SBM (U) 2.0.
Legacy Waste Dumpsite Remediation through Bioremediation Bio mining and disposal of Residual waste in Digboi MB
Construction of a RCC culvert on the approach Road to Solid Waste Management Project, FSTP Plant etc at Polokhoni under 15th FC Tied Fund
To Select an Agency for Establishment and Commissioning of Material Recovery Facility (MRF) and Waste to Compost Plant (W2C), at HOJAI, ASSAM
Establishment of Waste to Compost Plant and Material Recovery Facility at Teok MB, Teok.
Custom Bid for Services - Hiring of services for collection transportation and disposal of Municipal Solid Waste MSW by engaging two 02 Nos of vehicles trucks
Construction of Boundary wall around Material Recovery Facility and Waste to compost plant, Earth filling in dump site, for construction of Material recovery facility and Waste to compost plant, Construction of RETAINING wall around Material Recovery
Establishment and Commissioning of Material Recovery Facility (MRF) waste to compost plant under Sorbhog Municipal Board.
Establishing and Commissioning of Material Recovery Facility (MRF) and Waste to Compost Plant in Katimari, Nagaon
Construction of Paver Block road on the embankment for movement of heavy motor vehicles from FSTP entrance gate to Admin Building of Solid waste management project at Belortol
Custom Bid for Services - Hiring of services for collection transportation and disposal of garbage and Municipal Solid Waste MSW by engaging 02 two Nos of vehicles truck
RFP for Rehabilitation of Legacy Municipal Solid Waste dumpsite and regular generating waste at NLMB
Selection of Concessionaire for Design-Build-Operate-Transfer of a 10.0 KLD FSTP for 3 years at New Solid Waste Management site in Golai No. 5 under Digboi Municipal Board
Fresh/Regular waste dumpsite remediation through Bio-Mining and disposal of residual waste under Rangapara Municipal Board
Construction of Paver Block road on the embankment for movement of heavy motor vehicles from Admin Building to the terminal point of the embankment of Solid waste management project at Belortol
Construction of approach road to the proposed Solid Waste Management Plant and FSTP etc. along Boundary Wall of Assam Energy Institute at Polokhoni under 15th FC Tied 1st Installment 2024 2025