Loading…
Loading…
4,044 results • Best match
Mud multi court, Construction of drainage and compound wall, renovation of existing infrastructure facilities, Electrification works- toilet and street light works
Work includes road resurfacing, landscaping, construction of gate and security cabin and associated MEP works, street light and higmast works etc.
Supply of Accessories for HT ABC of size 3x150sqmm 1x120sqmm insulated messenger
Electrical work
As per tender documents
As per Tender documents
As per tender documents
DAY TO DAY MAINTENANCE OR REPAIRS TO EXTERNAL WATER SUPPLY , EXTERNAL ELECTRIC SUPPLY,DG SETS , LIGHTING PROTECTION SYSTEM ,SECURITYOR STREET LIGHTS ETC AT CGAE NEDUMBASSERY UNDER GE (I) (CG) KOCHI
Electrification work of building no 1,2,3 and extended portions of 3 and 4 with lights, power plugs, Street lights and all other requirements as mentioned in BOQ, Drawings and Specifications.
Up Gradation of Industrial Development Area at Edayar Providing Solar Street light and roof top solar panelling at Industrial Development Area Edayar
Please refer Tender document
Compound fencing, Interlock laying, Drain work, House renovation (5 Nos), Supply and fixing 12m high mast light Civil and electrical works, Community hall and Padanamuri construction and electrification, Buffalo shed construction
Land Development - Earth Filling, Drain, Retaining wall, Fencing and Gate, Mud Court, Interlock Pavement, Synthetic Football Turf , Kerb, Fencing, Cricket Pitches, Security Cabin, Electrification works - Flood lighting, Street lighting, Security
As per Tender Documents
This work consists of Construction of Concrete road, RCC Retaining wall, RR Retaining wall, DR Retaining wall, RCC Culvert, Construction of well and water supply project, Installation of solar street lights
LED tube light 18-20W IP 20, LED bulb 18-20W, LED Street light 30W to 35W, LED flood light 50W to 60W
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6919152 Dated : 24-11-2025 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 75000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 12 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : GM FIN Name of A/c Holder: Fertilisers And Chemicals Travancore Ltd. Account Type : Cash Credit Account No : 57017844467 IFS CODE : SBIN0070158 Name of Bank: State Bank of India Branch : Udyogamandal District : Ernakulam State : Kerala. (The Fact Ltd) 2/11 UIN Number NCTGC2415P
Mud Football Court, Drain, Fencing, Electric Pole foundation, Step Gallery, Toilet cum Office Building, Inauguration Stone, Long Jump Pit, Borewell, Electrification works for toilet cum office building and Street Lighting works
AS PER BOQ AND TENDER DOCUMENTS
AS PER BOQ AND TENDER DOCUMENTS
AS PER BOQ AND TENDER DOCUMENTS
LED Streetlights 24 watts with new fittings clamps nuts bolts including installation charges and replacement warranty of 2 years or more. Only reputed and well known brands will be considered.
CIVIL WORK
Energy audit Implementation Replacing defective SV lamp Street light Flood light fittings with LED fittings at various buildings Guruvayur temple premises under Guruvayur Devaswom
Supply of 1.1 kV Aerial Bunched Cable of Size 3 x 95 sq mm 1x16 Sqmm (Street light) 1 x 70 sqmm (Insulated Messenger)
Site development, Indoor stadium, Sump, Pump room, Borewell, Substation civil works, Swimming pool, Septic tank - 50-100 users Electrification for Indoor stadium, Substation, Swimming pool, Floodlighting, street lighting, Filtration and Fire fight
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6516969 Dated : 31-07-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6532983 Dated : 04-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6659224 Dated : 14-09-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
AS PER BOQ AND TENDER DOCUMENTS
AS PER BOQ AND TENDER DOCUMENTS
AS PER BOQ AND TENDER DOCUMENTS
C/o Administrative Building for CRCK, NIEPMD including internal sanitary Installations, Water supply, Drainage, Internal roads, storm water drain, 2 Nos Septic tank, 2 Nos UG sump, Compound wall, Gate and Security cabin, Internal Electrical ... cables, Street lights etc. ...
Astronomical Timer for Street Light Control (Timer Controls) as per IS 9000 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6560165 Dated : 12-08-2025 Bid Document 1/7 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Providing earth ring using 20mmx3mm Aluminum conductor Supply installation and commissioning of lightning protection systems Supply and installation of a high mast of 12m height ALERT Earth Termination system using 16mm DIA 1500mm length copper
Supply of accessories for 1.1 kV Aerial Bunched Cable of Size 3 x 95 sq mm 1x16 Sqmm (Street light) 1 x 70 sqmm (Insulated Messenger)
item rate
Electrification
Astronomical Timer for Street Light Control (Timer Controls) as per IS 9000 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6338381 Dated : 12-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stringing of 1.1 kV Aerial bunched cable of size 25 sqmm with bare insulated Messenger through existing poles 13502m Erection and commissioning of street light metering 11Set
Supply of Accessories required for HT ABC of size 3x150 1x120sqmm and 3x120 1x95sqmm LT ABC of size 3x95 1x16sqmm street light 1x70sqmm insulated Messenger for IPDS
Please refer Tender document
Construction of 200 bedded Hostel for Girls, 200 bedded Hostel for Boys under Pradhan mantri Janvikas Karyakram and 100 bedded Boys hostel for SC students under Babu Jagagivan Ram Chhatrawas Yojana . SH: Building portion including internal water ... Lift, Street lighting etc. ...
Leasing in of Commercial Properties - Office Space; Wet Lease (maintenance to be borne by lessor); Upto 5 years; 2; Ground Floor; Electricity back-up, Streetlights near the building, water facility; yes; no; yes; 2000
Self Ballasted LED Lamps for General Lighting Service as per IS - 16102 (Q2), LED Tube Light (Retrofit Type) (Q2), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
Erection and commissioning of street light metering 12Set and Stringing of 1.1 kV Aerial bunched cable of size 25 sqmm with bare insulated Messenger through existing poles 9110m
Padanamuri and Library above existing community hall, Construction of Compound wall , Kitchen and paving tile, House maintenance (3 Nos), Supplying and fixing water tank and water connection, Mini high mast light, OH tank , Bore well and pump set
Supplying,Testing,Installing and Commissioning of 5.5Km,1.1kV,LT ABC of size 3Cx50sq.mm, 1x 16sq.mm (Street Light), 1x35sq.mm (Insulated messenger) in Turnkey basis, for the Electrification of TSP Amboor.
PROVISION OF ELECTRIC GEYSER FOR P 43 AND P 44 MARRIED ACCOMMODATION BUILDINGS AT CGRA RAMESWARAM AND SO S INLIVING ACCOMMODATION AT CGDHQ-4, FORT KOCHI, PROVISION OF 02 NOS EACH HIGH MAST LIGHT AT CGDHQ 4 AND CGRA
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7139091 Dated : 23-01-2026 Bid Document 1/7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No