Loading…
Loading…
4,967 results • Best match
SUPPLY AND INSTALLATION OF GOODS (PALLET TYPE PERMANENT BUS SHELTER FOR TWO PRECAST SOFA BENCH) AS P (Q3), SUPPLY AND INSTALLATION OF GOODS (Solar high mast 9 m with Manual ladder) AS PER ANNEXURE A (Q3)
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6789276 Dated : 30-10-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 96735 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 62 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/8 Beneficiary : PFA/WCR West Central Railway, Indian Railways, West Central Railway, Ministry of Railways (Pfa/wcr)
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7134107 Dated : 21-01-2026 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 42240 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 16 (a). 2/11 EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CHIEF GENERAL MANAGER Munitions India Limited, Ordnance Factory Itarsi Central, Department of Defence Production, Ministry of Defence Itarsi 461122 Narmadapuram (MP) (Munitions India Limited, Ordnance Factory Itarsi)
LED STREET LIGH 90 WATT (Q3), TAPE ROLL (Q3), ALUMINIUM CABLE 2 CORE 12 MM (Q3), LED STREET LIGHT 60 WATT (Q3), LED STREET LIGHT 45 WATT (Q3), HOLDER (Q3), POWER SARVER CHOWK 24 WTAA (Q3), POWER SAVER TUBE ROD 24 WATT (Q3), LED BULB 18 WATT (Q3), ALUMINIUM 6 MM WIRE (Q3), ALUMINIUM 10 MM WIRE (Q3), ALUMINIUM 8 MM WIRE (Q3)
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6744559 Dated : 30-09-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 5000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : cmo Nagar Palika Parishad Dhar, Urban Development and Environment Department, Urban Administration and Devlopment, (Cmo Dhar)
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6744496 Dated : 30-09-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 4000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : cmo Nagar Palika Parishad Dhar, Urban Development and Environment Department, Urban Administration and Devlopment, (Cmo Dhar)
MOEI & Fans, Street Light, Compound light, Lift Pump, DG Set and Sub Station etc. of Non-Residential Building of CGO, Income Tax office, New CIA Building, Central Excise Manik Bagh, Malwa House, B2 Bunglow, Inspection Bunglow, Guest House, holiday Home at Indore (M.P.) for year 2025-26. SH: Temporary illumination of RGB base miniature LED lighting for Decoration of various Government Buildings at Indore, (M.P.) Subwork/Packages: SH: Temporary illumination of RGB base miniature LED lighting for Decoration of various Government Building at Indore, (M.P.)
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6586577 Dated : 19-08-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6586747 Dated : 20-08-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
TROMMEL MACHINE, MOBILE TOILET 10 SEATER, WHEELBARROW, TWIN BIN HANGING DUSTBIN, DOUBLE URINAL PORTABLE TOILET, MINI HIGH MAST 9 METER, SAFETY EQUIPMENT TOOL KIT FOR SWACHHTA KARMI, WHITE PHEYNL, BLACK PHEYNL, PHENOLIC POWDER, CRESOLIC POWDER, FOGGING OIL
MOEI Fans Street light and compound light etc. of Residential and Non Residential building of CGO, Income Tax Office New CIA Building Old CIA building, Central 1. Excise manikbagh , Malwa House, B2 Banglow and General pool Residential accommodation and Income Tax and Central Excise Qtr at Indore MP 2. all Authorization work contingency and deposit work contingency SH Providing services of operational and working staff and security guard in Division office . Subwork/Packages: Providing Services of staff and security guard in Division Office
led bulb, insulation tape, switch, socket, isolater, mcb, isolater tp, street light led, tube led, capacitor, aluminium wire, multicore wire copper, ceiling rose, energy meter BOQ Title BOQTITLE1
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years Of Experience Yes Startup Exemption for Years Of Experience Yes Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6308891 Dated : 07-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Road widening signages pavement table top crossings for smooth movement of traffic and pedestrians including street lighting Landscaping cum Beautification drainage works etc from Dalibaba Chowk to Satna River Bridge in Maihar Road in EPC mode satna
White - LED Based Solar Street Lighting System (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6766972 Dated : 10-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 16700 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Ch. Mgr. KOLKATA CORPORATE OFFICE, HINDUSTAN COPPER Limited, HINDUSTAN COPPER Limited, Ministry of Mines (Mexan Minj)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6659680 Dated : 09-09-2025 Bid Document 1/5 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller ... Tubular Street Light Poles ...
lighting pole or post and hardware- tubular street light poles Lighting Pole Or Post And Hardware- Tubular Street Light Poles ( 3 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERIC Tubular steel poles shall be conforming to IS 2713/80(Part-1& 2) with amdt No-1 latest Yes * Designation of Tubular steel poles as per table 2 of IS 2713/80 Part-2 with amdt No 1 410SP-48 * Length of Tubular steel poles (Metre) 10 10 Coating on the tubular steel poles Galvanised min. Mass of Zinc coating 360 Gms. sq. Mtr. Galvanised min. Mass of Zinc coating 360 Gms. sq. Mtr. BIS Marked Yes Yes If Yes, Declare BIS License Number, If No Write Not Applicable - * CONSTRUCTIONAL Type of steel poles Swaged (SP) * 1/3 Finials, Base plates and taper plug shall be as per clause 15 of IS 2713(Part-1)/1980 YES * Grade of steel tube, as per IS:1161/1998 YST 240 * CERTIFICATIONS Availability of Type Test Reports of the product from Central Govt/NABL/ILAC accredited Lab showing compliance to the specification YES * Test Reports No. - * Test Reports Date - * Name of the Labs - * Test report and approvals to be furnished to the buyer on demand. YES * * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Dharmendra Rajak 472338, OFFICE NAGAR PARISHAD, TIKAMGARH ROAD, PRATHVIPUR 3 15
16 sq. mm 4 core armoured cable laying for street light illumination, Tawa Dam downstream side from gallery to ( between pole no. 1 to pole no. 21) main canal.
Leasing in of Commercial Properties - ESIC Holiday Home Ujjain MP; Wet Lease (maintenance to be borne by lessor); 5 years- 10 years; Any; First Floor; CCTV facility, Streetlights near the building, Electricity back-up, As per
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Neemchowk ke pass plot par Gram and Gram Panchayat Bagwada Vikaskhand Bherunda; Solar Hybrid LED High mast (9 m pole Size) Solar Hybrid light (40watt 6 NO); Service Prov..
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 80 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6367473 Dated : 20-06-2025 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 37500 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CMO NAGAR PARISHAD MANPUR DISTT UMARIA, Urban Development and Environment Department, e-Nagar Palika Government of Madhya Pradesh, (Cmo, Nagar Parishad Manpur, District Umaria M.p.) Splitting
24 Watt TS Rod, 24 Watt TS Choke, Holder Tube Light, Pnedent Holder, 45 watt Led Bulb, Aluminium Wire 1.5MM, Tape Roll, LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3)
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6599407 Dated : 22-08-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 10000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CMO badawada, Urban Development and Environment Department, Urban Administration and Devlopment, (Cmo Badawada) Splitting
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6872629 Dated : 11-11-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 7000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CMO Nagar Parishad Kymore, Urban Development and Environment Department, N/A, (Cmo Nagar Parishad Kymore)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6914562 Dated : 21-11-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 10000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CMO Nagar Palika Parishad Bina, Urban Development and Environment Department, e-Nagar Palika Government of Madhya Pradesh, (Cmo Nagar Palika Parishad Bina)
Leasing in of Commercial Properties - ESIC Holiday Home at Indore MP; Wet Lease (maintenance to be borne by lessor); 5 years- 10 years; Any; First Floor; CCTV facility, Streetlights near the building, Electricity back-up, As per
Transformer oil filtrations, painting, n minor repair of all Transformers and replacement of old/rusted street light junction box of pole installed in Office Building CMPDI, RI-VI, Singrauli (MP)
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6915688 Dated : 24-12-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 225000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Additional ... Tubular Street Light Poles ...
Galvanized pole 9 meter, XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7010289 Dated : 23-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 15000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CMO NAGAR PARISAD BARGAWAN AMLAI, Urban Development and Environment Department, Urban Administration and Devlopment, (Cmo Nagar Parishad Bargawan)
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7073232 Dated : 05-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 21000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CMO Nagar Parishad Tendukheda Damoh, Urban Development and Environment Department, N/A, (Cmo Nagar Parishad Tendukheda)
Leasing in of Commercial Properties - Office Space; Wet Lease (maintenance to be borne by lessor); 10 years- 15 years; 1; Ground Floor or First Floor; CCTV facility, Streetlights near the building, Electricity back-up; yes; yes; yes; 165
For Providing Electrification Work in CPL Labs Different Room , Brnakoscopy Room, Sleeping Room, Gallery and Conferrence Room And Fixing of Octagonal Pole and Repairng of street light at TB Hospital Bhopal.
Layer 2 Access Switch, lighting pole or post and hardware- tubular street light poles, Camera for CCTV System, Small form-factor pluggable transceiver Bidder Turnover (Last 3 Years) 90 Lakh (s)
Construction of OBC Girls Hostel (96 Seater) (Civil work of (G plus 2) RCC framed structure with water supply, sanitary installation, drainage, storm water drain, septic tank including internal and external finishing, electrical work of EI, Fan, ... alarm, street lighting , ...
For Pole Shifting of LT and 33/11KV line and line Transformer and Electrification work for Street lighting due to construction of four lane CC road from kolipua to jhagaria square (Bhopal Indore Highway) at Sehore Road length (1.58 km)
1. MOEI, Fans, Street Light and compund Light etc. of Residential and Non Residential Building of CGO, Income Tax Office, New CIA Building old CIA Building Central Excise Manikbagh Malwa House B-2 Banglow and General Pool Residential accomondation and Income Tax and Central Excise Qtr at Indore (MP) 2. All Authorization work contengency and Deposit work contengency SH: Providing services of Operation / Working staff and security guard in Electrical Division Office and Sub Diviaion Office. Subwork/Packages: Providign Services of Operation / Working staff and security guard in Electrical Division Office and Sub Divison Office.
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) (3 (3 ))
Custom Bid for Services - Outside assistance of Electrical maintenance and repair works Sanjay Nagar sub station, all electrical installation, overhead lines, street lights, internal work in residence quarters of Sanjay Nagar colony, Guest House, JET .. Similar Category Manpower Outsourcing Services - Man-days based
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2), Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
PURCHING OF SKY LIFT MACHINE 9.5 MTR. ON MAHINDRA BOLERO PICKUP EXTRAL LONG 1 PIECE ARTICULATED BOOM 150 KG CGEPL CGESI -9.5 MCM 3.5 MTR 9.5 MTR HYDRAULIC STREET LIGHT REPAIRING 360 DEGREE
For Shifting / Height Raising of 33 KV, 11 KV, LT Line, DTR and Providing Street Light on Octagonal Pole with Applied Aceessories from Railway platform-1 to Rajendra Nagar Bhopal. (Length - 15.95 KM)
PROVAIDING AND FIXING MAIN SWITCH 100 AMP, PROVAIDING AND FIXING LED STREET LIGHT 90 WATT, PROVAIDING AND FIXING HDPE PIPE 40 MM ( 500 meter ), PROVAIDING AND FIXING ALUMINUM CABLE 16 MM ( 600 meter )
As per BOQ
Providing New AMF Panel and Controller Panel and Shifting of DG Set and New Controller Panels for A-Block, B- Block, C- Block and O2 Plant from main Panel with Seperate Supply Cables and Cable for Oxygen Plants and Street Lights at JP Hospital-1250,
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Octagonal Pole (V2) (Q3) (3 (3 ))