Loading…
Loading…
1,385 live809 closing this weekmost from Energy Department Uttar Pradesh and Karnataka Power Transmission Corporation Limited
1,385 results • Best match
AMC of preventive/routine/breakdown maintenance of 400 KV Switchyard, RGTPP
Construction of Departmental building for Office of the SSRM and HRO RMS N Division, Cuttack (SH Construction of Outdoor Pole mounted 63kVA, 11/0.433kV Substation for External Service Connection work)
Work of Residual Life Assessment RLA of 132/33 KV, 40 MVA Transformers at various Sub-Stations of ETD Hathras and ETD Mathura
Design, Engineering, Supply, Erection, Testing and Commissioning work towards Construction of 400 KV D/C Quad line from proposed NTTPP, NLC, Talabira to 400/220/132/33 KV Grid Sub-Station, Lapanga along with Construction of 02 Nos. of 400 KV bays at 400/220/132/33 KV GSS, Lapanga in the State of Odisha, on EPC contract basis.
Slab Construction over Deluge valve pump hut wall extension of hut and PCC of Old Store area at 400 220kV Abdullapur Substation of POWERGRID under Package No CS-213(26)
MOEI and Fans, Running Maintenance of DG sets, Water Supply Pump sets, Substation, Street lights, AC Units and Lifts etc at ESI Hospital at Ezhukone, Kollam. SH. Providing Office Assistance.
Erection of 66KV D/C line from Proposed 66KV NAROLI Substation LILO from Proposed 66KV H-Frame RAMPURA-PILUDA LINE on D/C Tower with ACSR Panther Conductor. (7.87 Rkm)
Improvement of earthing system by providing new earth pits for 132/33 kV Power Transformers, 33 kV Bays, Control Room and 40mm MS raisers at 132/33 kV Substation, Pydibimavaram
Comprehensive maintenance work for Project office, Dispensary, Base workshop, Glass House Area, Andrewyul SubStation, Dragline Section, Magzine House, Coal Testing Lab and DG Shed for a period of 2 years
Miscellaneous work for reliability improvement of electrical substation ,provision of pathway in yard area for shunting staff movement at WRS Kota & WRS Kota Extension of stripping shop (size-40mX48 m).
Design, Supply, Erection, Testing and Commissioning of 2x25 kV Auto-Transformer (AT) Feeding System, including 220/55 kV Makkajipalli (MKJ) Traction Substations, Dharmavaram (DMM) Sectioning Posts (SPs), Nagasamudram (NGM) and Penukonda (PKD) Sub-Sectioning Posts (SSPs), in Bangalore-Dharmavaram Section in Bangalore Division of South Western Railway
Construction of RCC road in switchyard at 132/33KV GSS Chandauti, Gayajee.
MOEI and fans, R/M of pump set, substation equipments, DG set, lifts etc for Residential and nonresidential building at CGST Vadodara. Subwork/Packages: Fully comprehensive maintenance of KONE make 2 nos. 8 passenger lifts at typr-IV CGST tower building at CR Colony.
Construction of Permanent Campus of Indian Institute of Technology Bhilai at Kutelabhata, Durg, Chhattisgarh. Phase-B-Part-1. SH- Engineering Department (3 blocks) (G Plus 5), Administrative block (01 block) (G Plus 3), Lecture Hall Complex (01 ... sets, Sub Station , ...
Repair of overhead external HT LT Netwok and substations at New University Campus
Anurakshan Maah Maintenance work of Substations, PT, DT and Line Under EDSD Sirathu
Anurakshan Maah Maintenance work of Substations, PT, DT and Line Under EDSD Manjhanpur
Anurakshan Maah Maintenance work of Substations, PT, DT and Line Under EDSD Saini
Contract for system strengthening works for survey, installation, testing and commissioning of new 5 MVA 33/11 KV Substation Chamradol (Parsili) DC-Majhauli under different schemes in awarded area Sidhi Circle
MISC REP TO ELECTRIC SUBSTATION WITH REPLACEMENT OF ELECTRIC FLOW CHART DIAGRAMS, DISTRIBUTION NETWORKS , REPLACEMENT OF INSULATION MATTING, RENEWAL OF EARTHINGS OF SWITCH GEARS AT AYODHYA CANTT UNDER AGE(I) AYODHYA.
S R of HT LT Substation in CN Tower at AIIMS New Delhi SH Replacement and old and outlived ACB and Retro fitting with new ACB in existing Main Emergency Panel
Turnkey Extension of Existing 245 kV GIS by Addition of 2 (Two) Nos. of 245 kV GIS Feeder Bays along with Associated Services at 400 kV Sonapur GIS Substation of AEGCL
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Substation; Substation; Service Provider
RMO 1600 KVA Electrical Substation equipments of Bhasha Bhawan, 2 Nos. 1000 KVA and 1 No. 500 KVA Electrical Substation, 8 Nos. Dumb Waiters in two banks (Comprising 4 Nos. each bank), 2 Nos. 10 passengers, 2 Nos. 8 passengers & 1 No. 13 passengers lift at Bhasha Bhawan, National Library Complex, Kolkata-27 (SH: Hiring of Diesel driven Maruti Swift Dzire/Hyundai Xcent / Indigo (CS)/Honda four wheeler inspection car).
Custom Bid for Services - 33 Kv Line Shifting Coming in the way of the under pass work at Railway gate no 14 situated at KM 1364 5 6Jagrajpur village between Shamshabad 11 KV PTW Line Neechakhera under 33 11 Kv substation Nibhora under the area of ... Of Substation Operation ...
Repairing of electrical wiring, switches, Holders, power supply system, digging and laying of UG cables, street Lights, LP finials etc.in J, B substation and LT area inside Factory area buildings at O.F.Bhandara
MLA-SDF-MLA SDF 2025-26 -Honble MLA Sri. Ramachandran Kadannapalli -Kannur LAC-Drainage Construction Near Padannapalam Substation infront of Shanil P Vs House in Kannur Corporation Division 52-General Civil Work
Construction of 132/33 kV, 2x80 MVA GIS Substation at Shiv Enclave (Sanganer), Jaipur alongwith Associated Transmission Lines Including Survey, Supply of All Equipments Materials, Erection (Including Civil Works), Testing And Commissioning
Supplying erecting testing and commissioning of 5 MVA transformer and 33/11 kV bay at Koprli substation for Janta Koprli Radhakrishna Hatmohide and Vishvatirtha Kakarde Lift Irrigation Scheme, Tal and Dist. Nandurbar.
Facility Management Services - LumpSum Based - Extension of control room at 33 11 KV SubStation Neri and Sanda District Sitapur; Civil Work; Consumables to be provided by service provider (inclusive in contract cost)
Custom Bid for Services - CPCL/PMC/T-005/2026-27 - Servicing of Package Substation for Group II/III LOBS Project Construction Power Supply Similar Category Operation and Maintenance Power House/Power Plant
Customized AMC/CMC for Pre-owned Products - 25 KVA rating Transformer Substation with External Service connection with 3 core HT Cable and metering unit; AS PER ATC; Comprehensive Maintenance Contract (CMC); AS PER ATC; No, Customized AMC/CMC for ... Transformer Substation with ... Transformer Substation with ... Transformer Substation with ...
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Electric Substation; Substation; Service Provider
Anurakshan Maah Maintenance work of Substations, PT, DT and Line Under EDSD P Sharira
Custom Bid for Services - MRPL Tender 3900002406 Supply and Installation of Stainless Steel Handrails for Electrical substations in MRPL Refinery and Aromatic Complex as per scope of work and BOQ Overall Total Lumpsum Amount to be Quoted Considering .. Similar Category Repair and Overhauling Service Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Improvements works of toilet roof interior wall surface and to providing solar reflective ceramic tiles over the roof etc in existing office of the Assistant Engineer O and M South Ayyermalai at Ayyermalai substation premises
Design, Engineering, Supply, Erection, Testing and Commissioning of work towards Construction of 400kV Indravati to Therubali Double Circuit Transmission Line from proposed 600MW, PSP Sub Station at Mukhiguda to proposed 400/220kV GSS Therubali with Twin ACSR Moose conductor and towers suitable for Quad Moose configuration Line Length 93.25 KMs Approx. in the State of Odisha, on EPC contract basis.
Substation Augmentation of Transformers capacity at 132 kV S/s Bhowali 66 kV S/s Thithki Manglore and 66 kV S/s Karanprayag and Kothiyalsain in Kumaon and Garhwal Zone under Package 6
Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial Run and Commissioning of 2X5MVA, 33kV/6.6kV Substation including Operation and Maintenance during DLP on Turnkey Basis at Amadand OCP, J and K Area, SECL
ARMO of E.I. & Fans, Substation equipments, Pump sets, DG set, Lifts, Fire Alarm and Fire Fighting system, AC Units i/c Street light & Compound lights at ITAT Campus, Jaipur for year 2026-27.
Supply and installation of 3.3KV Grade,190 ohms,10A NGR with safety features and accessories required to be installed with 1MVA , 11KV/3.3KV Transformer at Mine substation of Karma Project under Kuju Area.
Maintenance of various E&M Services at Dr. KSSR Stadium, Tughlakabad, New Delhi during 2026-27 (SH- Servicing of ACB, VCB, ATS and attached panels at substation Dr. KSSR stadium Tughlakabad, New Delhi
Supply, installation, commissioning and testing of Early streamer emission lightning protection system of 60 meter range (dia) for substation and all weighbridge locations along with earthing of weighbridges of Lingaraj OCP, Lingaraj Area
TENDER FOR UPGRADATION OF EXISTING SUBSTATION AUTOMATION SYSTEM (SAS) WITH LATEST IEC 61850 COMPLIANT ALONG WITH REPLACEMENT OF OBSOLETE DEVICES/SOFTWARE AND ITS AMC (ANNUAL MAINTENANCE CONTRACT) AT 220KV S/S CSPTCL, KUTHREL
RMO 1600 KVA Electrical Substation equipments of Bhasha Bhawan, 2 Nos. 1000 KVA and 1 No. 500 KVA Electrical Substation, 8 Nos. Dumb Waiters in two banks (Comprising 4 Nos. each bank), 2 Nos. 10 passengers, 2 Nos. 8 passengers & 1 No. 13 passengers lift at Bhasha Bhawan, National Library Complex, Kolkata-27 during the year 2026-27 (SH: Hiring of Diesel driven Maruti Swift Dzire/Hyundai Xcent/Indigo (CS)/Honda four wheeler inspection car).
Supply of 420KV, 4400PF, 1PH CVTs for Vemagiri Substation as per Technical specification, 1PH CVTs for Srikakulam Substation as per Technical specification, 1PH CVTs for Raichur Substation as per Technical specification, 1PH CVTs for Nagarjuna Sagar ... Sagar Substation as ... Maheshwaram Substation as ... Kadapa Substation as ... Gooty Substation as ... Warangal Substation as ... Vizag Substation as ... Kurnool Substation as ... Vijayawada Substation as ... Nellore Substation as ... Khammam Substation as ... Kunta Substation as ...
The work involves chipping of unsound/ weak concrete structures such as columns, beams, slabs, underside of staircase, rehabilitation by miro-concreting, applying epoxy coating, pressure grouting of leakage points, applying repair mortar, leak fixing