Loading…
Loading…
870 results • Best match
As per attached NIT
Biennial contract for OnM of Construction Power System and 33by11KVConstruction power substation of TeSTPP Phase-I
Installation, testing and commissioning of Aluminium Pipe Bus Bar connector at Substation no-3 (ENM), KOCP
As per SOW
Assistance for miscellaneous work in all three shifts for day to day work in new Substations 01, 02 and 3 of 33/6.6/3.3KV at KOCP for a period of 360 days.
SUPPLY INSTALLATION TESTING & COMMISIONING OF NEW 33 KV LINE FROM 132/33 KV PULGAON SUBSTATION TO 33/6.6 KB SUBSTATION NEAR PUMP HOUSE, BHARDA KONARI ANICUT, CHANDRAKHURI VILLAGE. UNDER THE WORK OF SUPPLY OF RAW WATER FROM BHARDA KONARI ANICUT TO MARODA TANK (DEPOSIT WORK)
supply of CSD at WARDHA SS, supply of CSD at SOLAPUR SS, supply of CSD at SEONI SS, supply of CSD at PARLI SS, supply of CSD - PUNE GIS wr-1, Supply of CSD at Aurangabad SS, supply of CSD at KORBA SS WR-1, supply of CSD at KOTRA SS, supply of CSD at CHAMPA SS, supply of CSD at Vindhyachal, supply of CSD at BINA SS, supply of CSD at BHUJ SS, Supply of CSD at JABALPUR SS, Supply of CSD at PIRANA SS, supply of CSD at DAMOH, supply of CSD at BACHAU, supply of CSD at BETUL, supply of CSD at SHAJALPUR, Supply of CSD at BANASKATHA, installation of CSD at SEONI, installation of CSD at PARLI, installation of CSD at VCHAL, installation of CSD at BINA, installation of CSD at BHUJ, Installation of CSD at JabalPUR, Installation of CSD at PIRANA SS, installation of CSD at DAMOH, installation of CSD at BACHAU, installation of CSD at BETUL, installation of CSD at SHPUR, installation of CSD at BKATHA
“Development of Electrical Infrastructure in Newly Developed Areas under Layer-1 and Layer-2, including Construction of 03 Nos. 33/11 kV Electrical Substations at Nava Raipur Atal Nagar, District Raipur (C.G.).”(1st Call)
PROVIDING & FIXING 33/ 0.4 K.V. , 630 K.V.A. COMPACT TYPE SUBSTATION & 100 KVAR CAPACITOR PANEL AT CIPET CAMPUS , BHANPURI , RAIPUR C.G.
Construction of Office-cum-Museum and Auditorium Building for Anthropological Survey of India, Sub-Regional Centre, Jagdalpur (C.G.). SH: Construction of Office cum Museum bldg. (B plus G plus 7) & Auditorium Bldg. (GF) including development works, ... installations, Substation , ...
As per SOW
Facility Management Services - LumpSum Based - Kurasia Sub Area; Contractual assistance required for daily maintenance work of electrical installations at NPH, Dumanhill-NCC, WCC and Korea Substations and day to day electrical maintenance work of the..
Design, Drawing, Construction, Testing, Commissioning of floating pontoon , 2 Nos. Raw water pumps and motors 140050 lph & 40m head, Raw Water Electric Sub station 100 KVA/33/0.415 KV with all required Work, 3 MLD conventional Type Water Treatment ... Electric Sub station 160 ...
Design, Drawing, Construction, Testing, Commissioning of Collecting well capacity 300KL with canal intake arrangement by 300 mm dia D.I. Connecting Pipeahead of collecting well 50 m Long , Raw water pumps and motors 61975 lph & 34m head -3 no, Raw ... Electric Sub station 100 ... Electric Sub station 160 ...
Day to day shifting, dismantling and drawing of 6.6KV overhead line for Feeder No. 05 and Feeder No. 04 from substation no. 01(old)/ substation no. 03 to mines to enable the expansion of mines for power supply of HEMM of KOCP for a period of 360 days
Supply of Digital Level Meter cum Level Generator for various sites of Western Region -I
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6427709 Dated : 18-08-2025 Bid Document 1/12 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 2781715.44 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 56000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DGM (F&A) POWER GRID Corporation OF INDIA Limited, WR-1 RHQ, Sampriti Nagar, Nari Ring Road, P.O. Uppalwadi, Nagpur440026 (Dgm) 2/12 Splitting
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio, Or Equivalent Vehicle; 2025; 0- 25, 000 kms; A/C; 12
DSLR/Compact/Handheld Camcorder or Video Cameras (Q3)
Repairing and painting of existing Boundary wall and construction of new boundary wall in damaged portion at 400/220kV Substation, Raipur (Kumhari)
"Provision of IOT devices/Intelligent Field Devices (IFDs) for monitoring & control (Indian Railways Native IOT based Yield Analysis Telemetry, Recording and Control -IR-NIYANTRAC) of electrical general assets like pump, platform (30/70%) lighting, ... Escalators, Substation etc. ...
Construction of Office cum residential building for ESIC department at Kamal Vihar Raipur (C.G.). SH: Office building G 7 stories in office plot, residential building (24 Nos. Ty II, 24 Nos. Ty III, 4 Nos. Ty IV and 1 No. Ty V), substation and pump room, parking shed, 1 No. volley ball court, 1 No. badminton court, UG sump, sanitary installation, water supply and other development works.
Design, Drawing, Construction, Testing, Commissioning of Intake well 6 m dia height 26.70 m with 3 no rose piece, A 350mm dia D.I. Connecting Pipe ahead of Intake well 200 m Long , Raw water pumps and motors 70298lph & 60m head -3 no, Raw Water ... Electric Sub station 100 ... Electric Sub station 160 ...
Leasing of Electric Vehicles (Long Term) - Wet Lease; Tata Nexon Hyundai Kona TATA Tigor Mahindra XUV 400 or Higher Model SUV EV Vehicle; 2400 KMs per Month & 10 Hours per Day; 36 Months Lease; White
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - MUV; Mahindra Bolero Camper; 2025; 0-25, 000 kms; A/C; 12
Office Suite Software (Version 2.0)
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio; 2025; 0-25, 000 kms; A/C; 12
Substation Clamps/Connectors (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6596086 Dated : 25-08-2025 Bid Document 1/11 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 180000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Replacement of floor finish with fitting and fixing vitrified/ceramic tiles and other fittings as per BOQ in Residential quarters and HRD Hostel of 400/220kV Substation, Raipur
Earthing Leads and Discharge rods for 800 kV HVDC Lines
2.5 sqmmX 14 core Control Cable, 2.5sqmmX 7 core Control Cable, 2.5sqmmX 5 core Control Cable, 2.5sqmmX 19 core Control Cable, 35 sqmm X 3.5 core Power Cable, 16 sqmm X 4 core Power Cable
Providing and fixing of Numerical Protection Relay in Control and Relay Panels of 3.3 KV Prabhu make VCBs and GEC make OCBs installed at 33/3.3KV GPT Substation, Gevra Area.
Development of new A site retail outlet at village Sunderpur Between Narayanpur Geb Substation and Ucchal ITI Teen Rasta Taluka Uchhal District Tapi under Surat Divisional Office of Gujarat State Office.
SITC of 33/0.4 KV Outdoor Substation (Equipment), LT Cable, Hume Pipe, MV panels, area lighting, earthing works, Pumps, Lightning Arrestor, ELV works & Air Conditioner works in Integrated Sports Complex, Raigarh (C.G.)
Facility Management Services - LumpSum Based - TOWN ADMINISTRATION, GEVRA AREA; Branch trimming below the overhead lines and grass cleaning within the substation transformer yard under Town Administration (E&M), Gevra Area; Consumables to be provided..
Facility Management Services - LumpSum Based - Industrial; Assistance in day to day minor breakdown/maintenance of HT/LT overhead lines, street lighting circuits and power supply to various service and industrial buildings under 33KV Substation & S..
Facility Management Services - LumpSum Based - Industrial; Assistance in day to day minor breakdown/maintenance of HT/LT overhead lines, street lighting circuits and power supply to various service and industrial buildings under 33KV Substation & S..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Electrical System or Installation, Supply & Installation of 11 KV HT VCBs Main Incoming feeders, Line PTs & Bus coupler at Main substation-TS-3(DESIG..
Facility Management Services - LumpSum Based - Gevra Open cast Project; Assistance required for day to day work in General Shift Maintenance rectification of breakdown of Overhead lines 33KV, 6600V, 3300V and 440V other substation related works under..
Electrical repairing or wiring arrangement in different sections Excavation Offices, Shovel section, drill section, Dumper section, MTK 1 and 3, EnM substation and offices, Gevra siding, CHP, East and West Cabin under KOCP for a period of 360 day
Facility Management Services - LumpSum Based - Industrial; Uprooting of rank vegetation, grass, brush wood etc of inside active outdoor switch yards of 132 KV substation at interval of each 3 months/4 times in one year including removal of rubbish up..
and fixing of NGR system on 6.6 KV side of Transformer (33KV/6.6 KV) at Baroud OCM .
Work of re-arrangement, repairing and maintenance of 33 KV line feeder no- F-01, F-13, F-15 and F-16 feeding power supply to 33 KV / 3.3 KV GPT substation, Gevra area and CEWS, Gevra from 132 KV/33 KV, Gevra Area.
Improvement to Raipur Water works including 3 months Trial run,12 months Defects Liability Period and 5 years Operation and Maintenance of all Project Components/whole scheme. i. Providing and Constructing 16.00 M Dia Intake Well cum Pump house on ... Electric Sub Station of ... Electric Sub Station of ...
Custom Bid for Services - Supply, Installation and Repair works for the Faulty components in the HVAC system of Champa HVDC Similar Category Comprehensive Annual Maintenance Services for Precision Air Conditioners Operation And Maintenance Of HVAC ... Of Substation
locations as mentioned in scope of work in Annex-01, 216 kV Surge Arrester for WR-I at various locations as mentioned in scope of work in Annex-01, 216 kV Surge Arrester for NR- II at various locations as mentioned in scope of work in Annex-01, 216 kV Surge Arrester for SR-II at various locations as mentioned in scope of work in Annex-01, 132 kV Surge Arrester for NR-I Gr-1 at various locations as mentioned in scope of work in Annex-01, 132 kV Surge Arrester for NR-I Gr-2 at various locations as mentioned in scope of work in Annex-01, 132 kV Surge Arrester for NR-III at various locations as mentioned in scope of work in Annex-01, 132 kV Surge Arrester for WR-I at various locations as mentioned in scope of work in Annex-01, 132 kV Surge Arrester for Kotra PS as mentioned in scope of work in Annex-01, 120 kV Surge Arrester for WR-I at various locations as mentioned in scope of work in Annex-01, 120 kV Surge Arrester for NR-III at various locations as mentioned in scope of work in Annex-01, 120 kV Surge Arrester for NR-I Gr-1 at various locations as mentioned in scope of work in Annex-01, 60 kV Surge Arrester for NR-I Gr-2 at various locations as mentioned in scope of work in Annex-01, 624 kV Terminal connector for NR-III at various locations as mentioned in scope of work in Annex-01, 390 kV Terminal connector for NR-III at various locations as mentioned in scope of work in Annex-01, 336 kV Terminal connector for NR-III at various locations as mentioned in scope of work in Annex-01, 336 kV Terminal connector for NER at various locations as mentioned in scope of work in Annex-01, 336 kV Terminal connector for SR-II at various locations as mentioned in scope of work in Annex-01, 336 kV Terminal connector for WR-II at various locations as mentioned in scope of work in Annex-01, 216 kV Terminal connector for NR-III at various locations as mentioned in scope of work in Annex-01, 216 kV Terminal connector for NER at various locations as mentioned in scope of work in Annex-01, 216 kV Terminal connector for SR-II at various locations as mentioned in scope of work in Annex-01, 216 kV Terminal connector for WR-II at various locations as mentioned in scope of work in Annex-01, 132 kV Terminal connector for NR-III at various locations as mentioned in scope of work in Annex-01, 120 kV Terminal connector for NR-III at various locations as mentioned in scope of work in Annex-01, Surge Monitor for SR-II at various locations as mentioned in scope of work in Annex-01
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia height 21m, Raw water V.T. pumps and motors 189490 lph & 31m head-2 no, For Raw& clear Water Electric Sub station 200 KVA/33/0.415 KV with all required Work, 4 MLD conventional Type Water Treatment Plant, 3 Nos-90955 lph-139m head centrifugal pumps clear water pumps&motors, Construction of RCC Over Head Service MBR-3 Numbers - 90KL Capacity/ 30m Staging, 105KL Capacity/25m Staging, 215KL Capacity/ 30m Staging, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 400 m And Clear water pumping main 250 mm Dia DI K-9 Length 5625m, 200 mm Dia DI K-9 Length 4093 m, 150 mm Dia DI K-9 Length 1610m Total Length 11328 m &Clear Water Gravity Mains pipe 110mm dia of pipe material OPVC – 57737m., 160mm dia of pipe material OPVC –5386 m. 250mm dia of pipe material OPVC – 442 m, Total length OPVC – 63565m, with all required valves & specials, Providing and fixing Bulk flow meters & Entire Scheme upto Village OHTsAllied All civil works including Boundary wall around WTP campus. After completion of all components of the scheme 03 months of testing and 09 months trial run of Entire scheme (with defect liability period of one year). (On Risk and cost Basis)
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia height 18m, Raw water V.T. pumps and motors 1919 lpm & 20m head-2no, For Raw & clear Water Electric Sub station 160 KVA/33/0.415 KV with all required Work, 2.5 MLD conventional Type Water Treatment Plant, 3 Nos.centrifugal pumps-923 lpm-155m head, Construction of RCC Over Head Service MBR-2 Numbers – 210 KL Capacity 30m Staging, 50KL Capacity 30m Staging, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 300 m And Clear water pumping main 250 mm Dia DI K-9 Length 3000m, 200 mm Dia DI K-9 Length 11500m, 150 mm Dia DI K-9 Length 300m Total Length 14800m & Clear Water Gravity Mains pipe 110mm dia of pipe material OPVC – 50097m., 160mm dia of pipe material OPVC – 24538m. 250mm dia O-PVC-1874m, Total length OPVC – 76509m, with all required valves & specials, Providing and fixing Bulk flow meters & Entire Scheme upto Village OHTsAllied All civil works including Boundary wall around WTP campus. After completion of all components of the scheme 03 months of testing and 09 months trial run of Entire scheme (with defect liability period of one year). (On Risk and cost Basis)MULTI VILLAGE SCHEME -BADWAR BLOCK- PRATAPPUR DISTRICT –SURAJPUR
Fall Protection Emergency Rescue Kit
Procurement of 5C* 1.5sqmm control cable