Loading…
Loading…
2,762 results • Best match
Extension and Renovation of AC workshop near SIF substation LPSC Valiamala - Electrical works
Extension and renovation of AC workshop near SIF substation LPSC Valiamala - Civil works
Augmentation of AMF substation at ASMG, LPSC Valiamala - Electrical works Replacement of transformer
RECONDUCTORING OF HT LINE FROM THIRUMALA SUBSTATION TO MATTUPAVU UNDER ELECTRICAL SECTION, MALAYINKEEZH
Interior partition works, Construction of Yard and bike sheds, Rain water storage tank and interlock tiling works for new Section Office Building at Ramapuram Substation Compound
earth work,excavation,foundation PCC,RCC,Fabrication angle iron,Fitting and creating D60tower,line stringing,back filling excavated earth,etc.
Earth work, transporting earth, supplying and stacking 6mm, 40mm metal and spreading the same in the yard etc
Supply and stringing 6.6km of covered conductor (Equivalent to ACSR DOG) in already erected 14m A poles and Lattice towers. ( 33kV single circuit line from 110kV Substation Kodungallur to 33kV Substation Methala )
Upgradation of 66 kV Substation Palode to 110 kV -Site preparation, construction of retaining wall and allied works
Transgrid Downstream work - Upgradation of 66 kV Substation, Edathala to 110 kV - Civil Part - Construction of foundations etc
Providing HT metering cubicle, 500 KVA unitised substation, 250 KVA DG set, LT distribution including construction of LT room at AMU Perinthalmanna, Kerala. SH: Clearing jungle near the substation and 2 pole structure, serivicing of the DG set, ... the substation .
Providing Earth mat for strengthening yard earthing at existing 110 Kv switchyard of Kuttiady Hydro Electric Project Kakkayam under Generation Division Kakkayam, Kozhikode KSEB Ltd
Supply Construction testing and Commissioning 4.5 Km of HT ABC of size 3x120 sq mm 1x95 sq mm on 9M PSC or A type Pole supports from Kadapra substation to Pannai via Kannassa including branch lines under Electrical Section Kadapra on turnkey basis
Transgrid 2.0 Project - Sabari Substation package - 220kV and 110kV UG cable laying and allied works for establishing connectivity between the proposed 220/110kV MCMV line and the respective bays at 220kV substation, Edappon
Demolition of existing indoor and outdoor power cable trenches, construction of new power cable trench, extension of existing trench in control room, alteration of control room wall and yard metalling of the 11 kV yard.
Supply of 2 Nos of CC(E) type RMU
for Construction of MAC road and providing concrete paver blocks at road inside the yard and road in front of control room at 110 KV Substation Kodungallur
Capital Work at 220 kV Substation, Punnapra - Capacity Addition by Installing 1 No additional 110/33 kV, 16 MVA Transformer - Erection of C R Panel, Laying of Control Cable and Power Cable and Control Wiring for New 110 kV and 33 kV Transformer Bay
POWER EVACUATION FROM NEW OLIKKAL AND POOVARAMTHODE SHEPS-33kV CABLE LAYING FROM POOVARAMTHODE SHEP TO 33kV SUBSTATION URUMI
Constuction of equipment foundation, erection of equipments in EHT substation
Re-tarring of existing road and allied works at 220 kV Substation compound, Pothencode
GENERAL-Annual plan 2020-21-Implementation of plan scheme-Setting up of Maternity units in Taluk HQ Hospital Taliparamba-Various works at Taluk HQ Hospital Taliparamba,kannur-Construction of Sub station
Truss Roof Work for 66 kV GIS Substation, Marine Drive of Transmission Division Ernakulam
Constructing 11 KV UG feeder of 1.4 km from Edappal Substation
Earth work excavation Demolishing brick laterite Demolishing stone rubble Supplying filling quarry muck PCC 1 3 6 RCC Steel reinforcement Solid block masonry Plastering Painting Filling available earth Centering and Shuttering works
The work mainly involves Erection of Equipment and yard structures and assembling of columns and beams, Earthing of equipment and structures, Stringing of Busbar and earthwire and Fabrication of structures for erecting equipments .
Earth work excavation PCC 1 3 6 Solid block masonry Plastering Dismantling steel work and asbestos sheet Demolishing RCC Filling quarry muck CC 1 2 4 Structural steel work for trusses and purlin Poly carbonate sheet PVC gutter Paver blocks etc
Design, manufacture, assembly, inspection, testing supply and delivery at site of Bolted type Hardware fittings for 220 kV switchyard of Thottiyar Hydro Electric Project.
Bay modification of 110KV yard by providing 110KV bus selection for 200MVA transformers No 1 and 2 and shifting of 110KV bus coupler bay at 220KV substation Kundara
construction cable trench and cover slab and connected earth mat work.
This involves dismantling old yard equipment, installing new 12.5MVA110/11kV TFR and bay equipment,laying 11kV UG cable and control cable providing interconnection between equipment, providing equipment and structure earthing etc at 220kV SS Brahmapm
O/R 2019-20 Urgent patch repairs to Koothattukulam substation road ch.1/000 to 2/000
Laying 11kV, 3x300sq.mm UG cable(Double run) from Kalamuku Junction to Bolgatty for interlinking Narakal and Mulavukadu Substations under ES Vypin under Electrical Division, Mattancherry.
Upgradation of 66kV Substation, Kuttanadu to 110kV level-Construction of Cable trench, foundation for equipment structures, renovation of yard and erection of equipments
Replacing damaged barbed wire with chain link mesh for fencing boundary of solar plant attached to 220 kV Substation Pothencode
Overhauling of 25 MVA 110/66kV Transformer No.1 along with replacement of old oil at 220kV GIS Substation, Kaloor
Erection and Commissioning of 3.3kV Switchboard at 110kV Substation of FACT-UC , as per tender conditions.
GENERAL-Urgent work of electrical substation maintenance at MCH, Thiruvananthapuram-Replacement of damaged 2 nos 250KVAr APFC panel and main panel board accessories in the electrical substation at MCH, Thiruvananthapuram-General Electrical Work
Supply Construction testing and Commissioning 0.65 Km of HT ABC 3x120 sq mm 1x95 sq mm from Kakkad 110 Kv Substation to Seethathode fish market for providing dedicated power supply to RAW water pump house Seethathode under Kakkad Electrical Section
supply of 50 numbers of silicon composite220kV,8kNbus post insulator without structure
Earthwork excavation filling quarry muck PCC Centering and shuttering RCC Steel reinforcement Filling excavated earth Fixing foundation bolts plastering
Foundation and Erection of Yard Structure, CT, CB, LA, and Isolators
Earthwork excavation Dry rubble masonry Random rubble masonry Providing weep holes PCC RCC Steel reinforcement with TMT bars Centering shuttering works Filling excavated earth Lifting loading and placing RCC slabs
Providing protection railing and metalling of 11 kV RMU Yard at 220 kV Substation, Pothencode
Up gradation of 66 kV Substation Karunagappally to 110kV- Constructing cable trench and fire wall
Supplying and filling quarry muck Surface dressing Earth work in excavation RCC Steel reinforcement for RCC work Centering and shuttering Plastering Finishing walls with Deluxe multi surface paint
Earth work in excavation Surface dressing Supplying and filling quarry muck PCC Centering and shuttering RCC Structural steel work Random rubble masonry Solid block masonry Plastering Lifting loading and proper placing of precast RCC slabs
Extension of 110kV bus, construction of 110kV bay, Erection of one number o D60 tower
Supply Construction testing and Commissioning 6.8 KM of HT ABC of size 3x120 sq mm 1x95 sq mm on 9M PSC or A type Pole supports with an average span of 20to 25 m from Kakkad 110 Kv Substation to Palathadiyar under Electrical Section Kakkad
CMLRRP Restoration of 220 KV Substation Road, Cheruvannur, Ward 42, Sector 7.