Loading…
Loading…
2,754 results • Best match
Replacing old slab of cable trench at 110kV Substation, Punalur
Installation of CCTV video surveillance system for 220KV Substation, Brahmapuram
Construction of Extention of 33kV Substation control room at Kumily
Extension of Drainage at 110kV Substation, Vazhoor through PWD Road
Capital work of 110 kV Substation, Edayar - Providing room for Reliable Communication equipments at 110 kV Substation, Edayar
Renovation of compound wall at 220kV Substation Kundara
Painting and Waterproofing at 33kV Substation Maniyampara, Palakkad
Laying of 33KV UG Cable at Ollur Substation for pattikkad and Puthur feeders
Construction of vehicle shed and roof covering for equipment stack yard at 220kV Substation, Edamon
Arranging Security Personnel for a period of one year from 01.04.2020 to 31.03.2021 at 110kV substation Rayonpuram.
Arranging Security Personnel for a period of one year from 01.04.2021 to 31.03.2022 at 110kV substation Marady
Arranging Security Personnel for a period of one year from 01.04.2024 to 31.03.2025 at 110kV Substation Muvattupuzha
Arranging Security Personnel for a period of one year from 01.04.2023 to 31.03.2024 at 110kV Substation Muvattupuzha
Arranging Security Personnel for a period of one year from 01.04.2020 to 31.03.2021 at 66kV substation Marady
Arranging Security Personnel for a period of one year from 01.04.2021 to 31.03.2022 at 110kV Substation Muvattupuzha
110kV Substation Kaloor Renovation Project Phase I Part A Raising the height of entry portion of 110kV Substation Kaloor and road for preventing the massive flow
Construction of two numbers of 110KV feeder bays at 110KV Substation, Kozhinjampara
Renovation of compound wall at 110kV Substation Vennakkara, Palakkad
O and M of 110kV Substation Paruthippara Maintenance and modification works of the existing store No 2 at 110kV Substation Paruthippara
Construction of Approach Road to Control Room and allied works at 220kV substation, Kunnamkulam
MOEI AND FANS I/C RMO OF WATER SUPPLY PUMP SET, LIFT, SUB STATION EQPT, DG SET, FIRE ALARM AND FIRE FIGHTING EQPT, VRF TYPE AC UNITS, STREET LIGHTS ETC AT CMLRE, PUTHUVYPIN, KOCHI DURING 2026-27.
MOEI AND FANS I/C RMO OF WATER SUPPLY PUMP SET, DG SET, SUB STATION, PASSENGER LIFTS, FIRE FIGHTING AND FIRE ALARM SYSTEM, AC UNITS ETC AT DWR RAMESHWARAM AND STAFF QUARTERS, PALLURUTHY, KOCHI DURING 2026-27
MOEI AND FANS I/C RMO OF WATER SUPPLY PUMP SETS, DG SET, WET RISER, PASSENGER LIFT, SUB STATION, FIRE ALARM SYSTEM, AC UNITS, ELECTRICAL INSTALLATIONS ETC AT RPO OFFICE AND STAFF QUARTERS, KOCHI DURING 2026-27.
110KV Substation Chakkittapara- Paving approach road to control room using interlock blocks.
Capital work of 110kV Substation Adoor-Capacity addition at 110kV Substation Adoor by Constructing one 110/11kV transformer bay and installing one 20MVA,110/11kV transformer at 110kV Substation Adoor.
Arranging Ex-service security guards for a period of one year from 01.04.2022 to 31.03.2023 at 110kV Substation Muvattupuzha
Arranging Ex-service Security guards for a period of one year from 01.04.2022 to 31.03.2023 at 110kV Substation Marady
Re_construction of damaged compound wall at North East Side of 110kV Substation compound at Muvattupuzha.
Construction of 33 kV Feeder Bay at 110kV substation, Thrikodithanam (for the newly Proposed 33 kV Substation at Kunnamthanam under Transmission Division, Pathanamthitta )
Construction of RR platform for stacking materials at 110kV Substation Koyilandy
Renovation of Road and Construction of Drainage at 66kV Substation Karimanal
220kV Substation Taliparamba- Transgrid Downstream Work - Construction of road inside yard
Control wiring for the Bay Extension Work of 110kV Substation, Paruthippara
Remetalling 110kV feeder bays and Tfr bays at 110kV Substation Kandassankadavu
Painting of compound wall including minor repairs at 110kV Substation, Pudukad.
Providing sheet roofing for 110kV Substation Ayyampuzha under Transmission Division , Chalakudy.
Interlocking pavers for landscaping and allied work for Palakkal 110kV Substation
CONSTRUCTION OF ROAD AND SIDE DRAIN AT 33 kV SUBSTATION VENGOLA
Remetaling of yard and alied works of 33 KV Substation, Pariyaram
110kV Substation, Chevayur- Remetalling and laying polythene sheet in the yard
Installation of additional 5 MVA Transformer at 33 kV Substation Anthikad
MOEI AND FANS I/C RMO OF WATER SUPPLY PUMP SET, 315 KVA ELECTRIC SUB STATION, 250 KVA DG SET, WET RISER FIRE FIGHTING SYSTEM, AUTOMATIC FIRE ALARM SND DETECTION SYSTEM, AC UNITS, STREET LIGHT ETS AT OFFICE BUILDING AND QEL LAB BUILDING, SPICES BOARD, ... OF SUB STATION EQUIPMENT, ...
CONSTRUCTION OF CABLE TRENCH WORK AT 110 KV SUBSTATION ATTINGAL
Capital work of 220kV Substation, Edappon- Extending existing 220kV double bus and construction of 2 Nos. of 220kV feeder bays at 220kV Substation, Edappon to the proposed 220kV Substation, Pathanamthitta- I Stage works.
Capital work of 110kV Substation, Thirumala - Laying of Paver blocks for access road to Staff Quarters at 110kV Substation, Thirumala
Construction of Vehicle Shed at 110 kV substation Mattanchery
Extension of Fire Hydrant system at 400kV Substation Madakkathara
Construction of 11kV feeder outlet at 110kV Substation, Piravom
Renovation of new cable trench at 110kV Substation Athani.
Extention of Control Room at 33 kV Substation, Kongannur.