Loading…
Loading…
7,413 results • Best match
Operation and Guarding arrangement of Pumping Machinery, HV Substation and Chlorination plant at Kanksa W/S Sheme Zone-II Phase-II, Block- Kanksa ,Dist- Paschim Bardhaman under Asansol Mechanical Division ,P.H.E.Dte.
Laying of 11 KV HT UG XLPE 3Cx100 Sqmm by open cut method and micro tunneling for drawl of Hijli Feeder from CK Town 33/11 KV substation under Ghatal Division
Supply, laying and replacement of faulty L.T and H.T Cable in substation equipment at Nischintapur CWR site under Auguribandh Punisol W/S Schewme Block onda under Bankura Mechanical Division PHE Dte.
Round the clock Operation, guarding, cleaning including daily / periodic maintenance of Pump AND Pumping machineries / equipments etc. including Substation of Clear water pumping station under 4.1MGD Water Treatment Plant at Garulia.
Underground 33 kV XLPE 400 Sq mm cable laying for drawl of new 33 kV O.H. line for Bantala Gangajoara 2nd Circuit of Gangajoara 33 11 kV SubStation under Garia Division
Three Years Maintenance of Electrical installation of Rajabazar Science College, CU Two boys hostel and Two ladies hostel- Routine, Preventive and breakdown maintenance of electrical installation including light ,fan and substation
Laying of 33KV 3CX400 sq mm XLPE UG Cable for the work of drawal of new 33 KV line from Baruipur GSS to Amtala 33 11 KV Substation under Behala Division
Running Operation And Maintenance of All Pumping Machinery At Intake And WTP Site ,800KVA Substation, Gaseous Chlorination System At 2.4 MGD Water Treatment Plant At Lakshmapur, Under Purulia Mechanical Division. Phe.Dte.
Operation and Guarding of pumping machineries, 2 x 630 KVA, 2 x 800KVA substation and other Electro mechanical installation at Plasto Industrial park Water Supply Scheme under Bankura Mechanical Division, P.H.E.Dte.
Running Operation And Maintenance of All Pumping Machinery At Intake And WTP Site ,800kva Substation, Gaseous Chlorination System At 2.4 MGD Water Treatment Plant At Lakshmapur, Under Purulia Mechanical Division. Phe.Dte.
Providing Electrical Equipments for substation at Boosting station_II under surface water based PWSS Scheme for Shyampur I _ II and Bagnan I _ II and Uluberia Block (Phase_I) in the district of Howrah.
Operation and Maintenance of 9.8 MLD Water Treatment Plant,0.512ML CWR and 500 Kva substation at Cooch Behar Municipal area for the period of 60 months including supply of all materials
Civil work including detail design, drawing, construction, erection and commissioning of 1.25 MG Capacity Underground Reservoir cum Booster Pumping Station and Electrical Substation Building... HMC under AMRUT 2.0 on Turnkey Basis.
CONSTRUCTION OF CIVIL FOUNDATION OF EQUIPMENTS AND STRUCTURES FOR INSTALLATION OF 3 PH 132KV PT BPI ISOLATOR LA And ALLIED WORKS AT BAGHMUNDI 132 KV SUBSTATION UNDER PURULIA AREA OFFICE WBSETCL
Operation and Guarding arrangement of Pumping Machinery, HV Substation and Chlorination plant at Kanksa W/S Sheme Zone-II Phase-II, Block Kanksa ,Dist Paschim Bardhaman under Asansol Mechanical Division ,P.H.E.Dte.
Construction of 1 no. store stack yard partly open (16m X 9M) and partly shed ( 12M X 9M) with 50Mtr. Long 4 Mtr. Wide concrete road at Jangipara 132KV Substation, WBSETCL
Round the clock operation AND minor maintenance of 1000 m3 / hr capacity clear water pumping station with 11 KV substation located at Arati Cotton mill, Howrah for three years, under KMDA
Construction of Diamond Harbour Divisional Model Store with in the premises of Purba Durgapur 33/11 KV SubStation at Purba Durgapur under Diamond Harbour Division in the District of 24Parganas S
Construction of New Office building G plus 3 for PDCA and MAB including Internal water supply, sanitary installation, Drainage, STP(50 KLD), Internal E.I and Fans, street/compound and Garden light, substation and LT distribution, 250 KVA DG set, lifts, fire alarm and PA system, fire fighting system, CCTV and networking, solar photovoltaic power plant and VRV/VRF AC system at Doranda Ranchi Jharkhand SH: Providing services of vehicle on hire basis for official use of ADG, Patna (HQ-Kolkata) at Kolkata.
E/M works
Rectification and maintenance of 04 (four) nos Transformer at 33/6.6 KV substation at Intake Kukrakuri of Chatna Saltora Block sub-surface based w/s scheme under Bankura Mechanical Division,PHE Dte
Routine, preventive and breakdown maintenance of EI of whole campus of entire Dum Dum Central Correctional Home Compound including SubStation ,DG Set,High mast and Barracks round the clock(for 12 months)
Operation, maintenance and guarding of all pumping machinery at intake and WTP site, 800kva substation, gaseous chlorination system at 2.4 MGD water treatment plant at lakshmanpur, under Purulia Mechanical Division. P.H.E. Dte.
Operation, maintenance and guarding of all pumping machinery at intake and WTP site, 800kva substation, gaseous chlorination system at 2.4 mgd water treatment plant at Lakshmanpur, under Purulia Mechanical Division. P.H.E. Dte.
Renovation of old , Earthing and Lightning Conductor Air Terminal arrangement of existing PDB, VCB, Transformer ,Metering room substation building with allied works at Lakshmanpur WTP under Raghunathpur water supply project PMD PHED.
Replacement of damaged sub main cable from substation to Administrative Building and augmentation of Electrical installation work at Ground floor, Administrative building, BG lines, Alipore, Kolkata for the finalcial year 2024-25
Height extension of boundary wall in northern side approx 175M and installation of concertina fencing including repair maintenance and painting of total boundary wall and allied works at Katwa 132 KV substation
Day to day routine and preventive maintenance of the Electrical Installation, including substation and necessary maintenance materials at administrative building, Jhargram under Jhargram Electrical Division. (For the period of three (03) years.)
AMC of EI of Presidency University and Hindu Hostel-----Annual Preventive maintenance of entire electrical installation, compound illumination and substation in the premises of Presidency University and Hindu Hostel for 12 months.
Overhauling Works of Auditorium Sound System Electrical Rewiring Maintenance Works and Substation LT HT Panels Power Cable Area Lighting Maintenance Works of Rabindra Bhawan at Barasat under North 24 Parganas Zilla Parishad.
Operation and maintenance and preventive measures Non-Comprehensive of major materials of Electrical substation, Internal and External Electrical Installation, Fans, lights including compound lights and operation of pump motor at Tech camp
Providing Mechanical / Electrical Works with all Ancillaries and Auxiliaries for High Lift Pumping Machinery, Substation, Gaseous Chlorination, Illumination arrangement at Intermediate Booster Pumping Station - I of Left-Out Mouzas of Barabazar Piped
Allied Works Corresponding to Providing and Installation of Substation Equipments and other Accessories at Ramnagar Head Works Site Under RCFA Part-III (Zone-II) Water Supply Scheme, Block Pandabeswar, Dist. Paschim Bardhaman.
Supply delivery and Installation of Pump spare of HSC Pump (570 KW) at Intermediate Boosting pumping station (IBS Upargora) and substation equipment under Chhatna, Saltora Block Sub-Surface Water Based Piped Water
Annual Maintenance and operation of EI of both non residential and residential bldg. incl. lift, AC system and Substation of Vidyasagar SGH, Behala, South 24 Pgs. - Supply and Delivery of Maintenance Materials.
Land development Sinking of one number deep tubewell 100mmx50mm including installation of 1HP submersible pump KIRLOSKAR with motor set for proposed Achintanagar 33 11 KV SubStation at Achintanagar Patharpratima under Kakdwip Division
Painting of PCC Pole 9 mtr 8 mtr Iron structure of 33 and 11 KV HTOH line at location Pakhiralaya to Rudranagar Substation under Kakdwip Division in connection with Gangasagar Mela 2018
Operation, maintenance and guarding of all pumping machinery at intake and WTP site, 800kva substation, gaseous chlorination system at 2.4 mgd water treatment plant at Lakshmanpur, under Purulia Mechanical Division. P.H.E. Dte.
Referred to NIT
Facility Management Service- Manpower based (Version 2) - Industrial, Residential; providing Catering services and Running - Maintenance of Transit Camp at 220KV Birpara substation; Skilled, Residential; providing Catering services and Running - ... Birpara substation ; ...
Round the clock Operation, guarding, cleaning including daily/periodic and minor maintenance of machineries/equipment including 11/0.433 KV Substation of 6 MGD Capacity Raw Water Pumping station under Kanchrapara Municipality at Halisahar.
Laying of XLPE 300sqmm 11KV underground cable by microtunneling work 440mt and alliwd works for drawl of new 11 KV feeder against existing bifurcation of Yogerpratik 11 KV feeder from Chord Road substation
Additional work in connection with improvements of Substation Equipments and other Electrical Accessories at Head Works Site Under Dherua Piped Water Supply Scheme, Block Medinipore sadar, Dist. Paschim Medinipore. Under Midnapore Mechanical Division
Round the clock operation,cleaning including daily/periodic maintenance,attending,repairing etc of different electro-mechanical equipments, pumps,Lifts,11KV substation,Generators,stage lighting arrangement,sound system etc at Unnayan Bhavan for 1year
03 Years Maintenance of Electrical installation of Rajabazar Science College, CU , Two boys hostel,Two ladies hostel Routine, Preventive, breakdown maintenance of electrical installation including light ,fan, substation of Rajabazar Sc. College,C.U.
Repairing and rectification of Single Panel 11 KV VCB, Four Panel VCB and LTPDB along with Filtration and dehydration of transformers at SubStation and Replacing Motor Bearing at HLPH at Dariapur WTP, Malda
Yearly maintenance of Electrical Installation work including 200KVA Substation with outside compound lighting at entire Administrative building including controller department Finance department and VC bungalaw in the Campus of Rajbati of Burdwan Uni
Supply and laying of 50 sq. mm. 3.5 core LT power cable from Borobazar Substation, Ganga Sagar main mela ground to beach side Ganga Arati Stage in connection with Ganga Sagar Mela-2024
Upgradation of all existing infrastructures (Sludge Sump HouseSludge pond Substation Building Boundary Wall Clariflocculator, Flash Mixer, Inlet Well and allied Works) of Augumentation of Central Sector Part-I under JJM under Berhampore Divisio
Development of 11KV Substation for Centre of Excellence Building of Calcutta Pavlov Hospital under Calcutta National Medical College-Augmentation of the existing electrical power supply at Pavlov mental Hospital, 2nd campus of CNMCH