Loading…
Loading…
6,344 results • Best match
Installation of fuse units at Jehlitand for 11kV/3.3kV and 3.3kV/440V Transformer and cable termination in cables of the 11KV/3.3kV and 3.3kV/440V Transformer installed there under KDH OCP, NK Area
Complete rewinding of 01 No. Lightning Transformer 250 KVA/11 KV/ 440 Volts oil cooled Type, make - V.E.I. under Sl. No. 86014, copper conductor H.T. Transformer of Patherdih Township under Sudamdih Coal Washery.
For the rewinding of 11kV/440V 100kVA 3 Phase transformer SL- PRM1210552 M and B Switchgear Ltd. Make to 3.3kV/440V 125kVA transformer, for providing power to the outsourcing at ADIC, Kusunda Area.
Installation of 1 No station transformer by providing all safety devices as GOAB, DO fuse for Lighting Transformer at Colony substation feeding power to water treatment plant of Jharkhand Project under Hzb Area
Repairing/rewinding of 6.6KV/440 V, 45 KVA HT Transformer Sl. No. 602 Drill ABOCP Mine
On Site Repairing of 300KvA Lighting Transformer 3.3KV/415V installed at Potanga Village under Urimari OCP.
For Repairing/Changing of Cork Sheet, Stud, Rubber Bush and Insulator of 2 nos. Transformer (i) 630KVA,3.3KV/440V Sl.No.NPC/01/TRA,(ii)1MVA,11KV/6.6KV Sl.No.KM 351/J at NPC(2)Rewinding of tank repairing of 100KVA Transformer,550V/220V at LBC(3)
Repairing and Rewinding of 6 nos. of 33KV current Transformer for the main substation Moonidih.
Construction of PCC road at from Lohandia main more to mines edge transformer base
Painting of transformer, switches (11KV,3.3KV), motor pump and starter of IWSP, BnK Area
Fabrication of iron base structure for installation of Transformer under KDH OCP, NK Area.
Dismantling and Installation of 1000KVA Lighting Transformer 11KV/440Volt Main Sub Station of ROCP.
Rewinding/repairing of 100KVA, 11KV, 440Volt make KEL Transformer of JOCP under Hzb Area.
Installation of Transformer at Workshop substation of Township (Bachra) under GM Unit, Piparwar Area.
Repairing and rewinding of oil cooled welding transformer (600amp./440/220V) of Jharkhand OCP.
Providing three phase power supply through 1000 KVA Transformer ACB India Limited at PCW.
EHV Grade New Transformer Oil for KTPS DVC as per attached material specification sheet
Complete Repairing /Rewinding of 10 KVA/3.3KV/220 Volt Lighting Transformer at ROCP/SJ.
Rewinding and repairing of 500KVA, 3.3KV/415V transformer of Religara Colliery under Argada Area.
The repairing of NGR of transformer 1500 kVA 11kV/3.3kV, at ADIC, Kusunda Area
Repairing of 500KVA 3.3KV/440 Volt Lighting Transformer at Bengali Koyhi Under ROCP/SJ..
Provision of chain link fencing around 02 no. Transformer in Amlo Basti under AADOCM.
Erection of fresh power cable in Down colony Transformer of Dugda Coal Washery Township.
Construction of Transformer room and boundary wall near Sirka OC patch under Sirka Group
Installation of Transformer at 48 Qtr. substation under Township (Bachra), GM Unit, PPR Area.
pcc road and ho lalu bhagat to shivam ravidas near transformer behind yoga sthal
Rewinding and repairing of 500KVA, 3.3KV/440Volt Transformer of Religara Colliery under Argada Area
Rewinding and repairing of 500KVA, 3.3KV/415V transformer of Religara Colliery under Argada Area.
Overhauling/repairing of 500kva,11kv/550v transformer at Jogidih Colliery under Govindpur Area III
Work of transformer and switch room shed at NPC project site under Sijua Area
Construction of Transformer shed and earth pit at Lakhimata Sub-station under Lakhimata Colliery.
Rewinding of 250 KVA 11KV/440V Lighting Transformer at Ballugadda substation under Ghanoodih ABDKC.
Repairing/rewinding of 6.6KV/440 V, 45 KVA HT Transformer 602 Drill ABOCP Mine.
Filteration of transformer oil of all substation of Phularitand section, AMP Colliery, Barora Area.
Rewinding and repairing of 500KVA, 3.3KV/440Volt Transformer of Religara Colliery under Argada Area.
Repair and Maintenance of Transformer Switch Room of VTC Colony, BPH under EJ Area.
Foundation of 500 KVA transformer and P.C.C near Quarry no.3 Under Kathara Colliery.
Comp. Repairing of Lighting Transformer of 07 No. Sub-Station KOCP Under Bastacolla Area..
Repairing and maintenance of 630KVA transformer 3.3KV/440V, installed at Karo siding i.r.o. KOCP
Complete Repairing and Rewinding of 3.3 KV/220V, 40 KVA Lighting Transformer of KOCP.
Repair of shed of transformer room at Bachra siding under CHP CPP Piparwar Area.
Complete Rewinding and repairing of oil cooled Transformer 500 KVA, 6.6KV/440V, GEC make
Repairing of 315KVA, 3.3KV/550V, A /yule make transformer sl.no.1245 of Topa project
Repairing and rewinding of 50KVA 3.3KV/440V lighting transformer of Kuju Colliery, Kuju Area.
Transformer Installation and 220 Volt Over Head Line Errection of Departmental Patch at KOCP
Repair and maintenance of transformer work shop of CSO under Dam Division, DVC Maithon
Repairing of 500kva ,3.3Kv/415V Transformer installed at washery colony of Gidi-C Colliery
Erection of fresh power cable in Dugda-II Transformer of Dugda Coal Washery Township.
Outdoor cable jointing and Transformer midpoint earthing and supply with fixing of Lighting arrestor
Bur-Filter IV Bushing DT 630 Complete for WAG-9 Locos 3 Phase Transformer