Loading…
Loading…
4,285 results • Best match
Construction of short circuit lab, temperature rise lab, impulse lab and LT room and internal road works, retaining wall, septic tank, ug sump, including water supply, sanitary installation drainage work and providing IEI, EPABX, LT panels and ... of transformer oil ... KV Transformer
Design, Supply, Loading at workshop/factory, Transport, Unloading at site, Erection, Testing and Commissioning of 33/6.6 KV S/w equipments along with 2.5 MVA Transformer of TalodhiMokasa Lift Irrigation Scheme, Tah. Chamorshi Dist- Gadchiroli
Est.no/OW/5268/ 2022-23 Providing HT Cable And HT Metering Cubicle and Allied works for Giving Power Supply to 315 KVA Transformer for MRI System at SRTRMC and H Ambajogai Tq Ambajogai Dist Beed
Supplying Installation Commissioning of Transformer with Allied Electrical Cable works complete for provision of New Elerctric Power Connection from MSEDCL for our New RO Ms. Shree Ganesha Petroleum at Ranjangaon Dist. Pune under Pune Division
Est.No. OW/Pbn/ 101 /2024 25 PROVIDING EI , 10KWP SOLAR ROOF TOP, FIRE FIGHTING ARRANGEMENT, LIFT (6 PASSENGER), STREET LIGHT, 200 KVA TRANSFORMER AND HT LINE IN NEWLY CONSTRUCTED NAGARPALIKA BUILDING AT GANGAKHED DIST PARBHANI.
Prov. Supplying and erecting 315 KVA Transformer with HT connection, cubical panel and shed for Yashwantrao Chavan Auditorium Building in the Premises of Divisional Commissioner office building at Nashik Road, Nashik, Tal. and District Nashik.
Design,Supply,Construction,Installation,TestingandCommissioning of 220/132/110/55kV TSS,SPandSSP with 2X25kV Scott connected transformer and associated work for quadrupling of VR-DRD Section and Suburban corridor between PNVL-KJT section Design Build
PROVIDING 25KVA 1 PHASE TRANSFORMER (3NOS) WITH H.T LINE AND L.T.LINE. DOUBLE POLE STRUCTURE FOR PROVIDING POWER SUPPLY TO PRIMARY HEALTH CENTER BUILDING AND STAFF QUARTERS GUT NO. 314 AT VILLAGE, GADHE PIMPALGAON TQ. VAIJAPUR
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Electrical System or Installation, Overhauling of OLTC of 35MVA transformer A B installed at MRS at RCF Trombay Unit; As per NIT scope
Single Phase Battery Charger , the Charger will Consists of main Transformer D.W.Copper Winding, Single Phase Rectifier to give D.C.Output Voltage 110v to 150v/60AMP, Input 230V Single Phase 50HZ. The Voltage and Current Will be controlled by Fine and Coarse Control Rotary Switch 40Amp 1 pole Make- (Balson/Switchon/Kaycee). The Charger will have D.C. Output Ammeter/Voltmeter, input MCB, AC Fuse, Pilot Lamp to Indicate Mains on, Fan Will be Provided for Cooling. The Charger will be housed in M.S.Angle/Sheet Powder Siemens Grey Cabinet with Wheels. Make: Equipment Control, Invo Control or equivalent.
Supplying Erecting Testing and Comissioning of New infrastructure (HT Line, LT Line with AB cable and Transformer) For electrification and rehabilitation of village Mouza Bhon (Jigaon Project) at Mouza Hingane Kawathal in Gut No. 49,50,51,67,70,71 an
Providing, Erecting Testing and commissioning 22KV/ 0.433 Kv / 100 KVA Transformer with DTC Structure/ Sub Station with 22 Kv x 95 sqmm HT cable etc complete for Power Supply connections of New WTP site at Waksai.
High Bandwidth Radio upto 2 Gbps, Surge Protection Device, Low Loss Weather Proof Cable, FCBC 48VDC 10 Amp, Regulated Isolation Transformer, Dual Polarized 2 x 2 MIMO Dish antenna, Training for 7 days at each location
Est.No.141059-7 of 2025-2026 Prov. Internal electrification, Area Light, Water Pump and UPS system, 100 KVA Transformer, Fire Fighting System to Proposed construction of Dr Babasaheb Ambedkar Bhavan Building Gargoti, Tal Bhudargad Dist. Kolhapur.
Repair, Maintenance and Installation of Plant Systems/Equipments - Industry Unit; Electrical System or Installation, Biennial Contract for maintenance of LT HT Transformer upto 75 MVA in Ammonia 1 plant RCF Trombay Mumbai; As per NIT scope
AS PER TENDER DOCUMENTS
INDUCTION COIL FOR DIFFERENTIAL MODE FILTER, CURRENT SENSOR ELECTRONIC CURRENT MEASUREMENT 200A, INDUCTOR MLI 30AH 125AEFF FOR PWM FILTER 400HZ, 600VDC/330VEFF AXIAL, TRIPHASE TRANSFORMER 82.3V(UIN) 115V(UOUT) 400HZ 20, FAST DIODE MODULE ISOTOP 50A ... 1.2KV, TRANSFORMER DC/DC ...
Push Button, Caster Wheel With Brake, Caster Wheel, Caster Rubber Wheel, Digital Cuff, Water On Off, Adaptor, Choke Elect, Battery 3 7 V, NSK Straight Hand Piec, Transformer, Static Scaler PCB, Solenoid, Scaler Cable, Std Head Cartridge
Supplying, erecting, testing and commissioning of 33/0.430 kv LT supply,1 mva transformer and other related works at Mohadi truck terminal sr no.147/1/B for Electric Bus(PM e-bus) Charging station,DMC Dhule.
Providing E.I., A.C., Water Pump, Street Light,fire fighting, C.C.T.V., Transformer, 82.5 KVA D.G. Set, lift,solar system in Newly Constructed 30 Beded Rural Hospital Building at Wadhwana Tq. Udgir Dist .Latur (Sub-work I to VIII)
Providing Internal and External Electrical Installation, ,Water pump system, , 100 KVA ,11 0.433 KV transformer, 82.5 KVA DG set with AMF panel, Area lighting Fire Fighting and Fire Alarm System and Solar PV System for Administrativ Building
Supplying Erecting Testing and Commissioning of New Infrastructure (HT Line, LT Line with AB Cable and Transformer) For Rehabillitation of Mz Rehabillitation of Hingane Gawhad on Gut No 98, 99, 100, 101, 104 Part,105 Part,106,107,108,109,110,111,112,
Prov. Internal E.I. work, 315 KVA Transformer and 250 KVA D.G. Set, Street Light and water pump, Fire Fighting system, Fire Hydrant System and Fire Alarm System, 02 Nos. G plus 1- 20 Passenger Cum Streature Li
Est No 288 2021 22 Providing Electrical Installation CCTV VC arrangements,street light,water pump fire fighting and transformer for Primary Health Centre Building at Islapur Tq Kinwat Dist Nanded (Part I to Part VII) (2nd Call)
Design, Supply, Installation, and Testing and commissioning of 20 Meter High Mast Lighting system, 250 KVA Transformer and LT Panel at PALGHAR Main depot MAHARASHTRA, complete in all respect for DFC CTP 12 Project of Vaitarana Sachin section.
Supplying erecting testing and comissioning of new infrastructure (HT Line, LT Line with AB cable and Transformer) for Rehabilitation of Village Yerali (Phase 1) Tq. Nandura in Village Nimgaon Tq. Nandura Dist Buldana. (Jigaon Project) Handing over t
Est No 185 /2023-24 Providing Internal Electrical Installation,Street Light,Transformer Pump, Fire Fighting ,in Type II 24 No At Comman Pool Quarter ,Police Colony Premises Ta. Hadgaon Taluka,Dist.Nanded( Sub Work A , B , C, D, E, )
Est. No. 3114 /22-23 Providing External Electrical installation, street light, fire fighting, HT metering with Transformer HT line, shifting of DTC, LT line, Lift, CCTV arragements in the premises of newly constructed Subdist Hospital Naldurg Tq. T
Providing Internal Electrical Installation, LAN Wiring, Telephone Wiring, Invertor, 315 KVA Transformer, 1 no. G plus 1 15 Passanger Cum Streature Lift, Fire Fighting System, Fire Hydrant System and Fire Alarm System for Upgradation of 30 Beded Rural
Supply, Erection and Commissioning of 11kV/415V, 2000 kVA X 1 Nos. Outdoor transformer sub-station and allied HV and LV Electrification Work Including LV Panels and Busduct for 18240 Spindle Unit, at Darwha, Tal. Darwha, Dist. Yavatmal.
M and R to Wagle Booster Pumping Station Repairing of 22 KV 0.433 KV Substation along with Overhauling and Servicing of 500 KVA Transformer and Providing New Smart Load Break Switch (SLBS) at Wagle booster Pumping Station Thane
O and M Nhava Sheva Water Supply Scheme, Stage I Tal. Panvel, Dist Raigad Repairing and rewinding of HT winding to 22 3.3 kV, 2000 kVA Urja make transformer of substation at Vayal Head Works, Tal.Panvel, Dist Raigad.
Running and maintenance of specialized services of electrical and mechanical equipment like DG set Sub station etc. at Drugs Testing Laboratory Mumbai Subwork/Packages: Repairing overhauling servicing of 800 KVA Oil Transformer 11 KV VCB and electric works
Online UPS Online UPS ( 3 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Rating in KVA (KVA) 10.0 KVA 10.0kva Technology IGBT-PWM with inbuilt isolation transformer igbt-pwmwithinbuiltisol ationtransformer Input Power Three phase 300 V - 450V sinewave, 50Hz single phase 160V - 260V sinewave, 50Hz, Three phase 300 V - 450V sinewave, 50Hz Output power Single phase 230V +/-1% sinewave 50 Hz singlephase230v-1sine wave50hz Backup time (Minutes) 30 15, 30, 60, 90, 120, 180, 2 40 Minimum VAH (VAH) 12096 Warranty for UPS (Years) 3 1, 2, 3, 4, 5 Movable trolly for Batteries Without trollery but with rack With, Without, Without trollery but with rack Warranty for battery 2 2 Degree of Protection IP21 IP21, IP20 Cabling 5 meters for input and out put Without With, Without Paralleling kit for Without With, Without 1/4 synchronising Installation and Commissioning Yes - CONSTRUCTIONAL Minimum thickness of M.S.Sheet Enclosure duly painted (mm) 1.2 - Type of Battery SMF-VRLA conforming to JISC:8702(Pt.I, II&III) - FUNCTIONAL Maximum overshoot and Under shoot of output rated voltage 4 - Voltage Regulation from no load to full load (%) /= 3% - 20% Overload limit for minimum 10 minutes Yes - Overall Efficiency (%) >/=90% - Total Harmonic Distortion(THD) (%) Maximum 3% - 50% Overload limit for minimum 1 minutes Yes - PROTECTION Protection for under voltage at battery terminal at 10.5V per 12 V battery. Yes - Protection of Over voltage, Short Circuit & over load at UPS output terminal Yes - METERING AND INDICATIONS Digital Metering in UPS for AC Input Voltage, Output AC Volt age, Current, Frequency, Battery Voltage and Current Yes - Indicators for mains presence, Battery charging and discharging, Output Over Load, Low Battery Voltage Yes - REPORTS AND CERTIFICATION Damp Heat : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C, two cycles of (12+12) hours each 2007) Yes - 2/4 Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs Yes - Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. Yes - Availability of the Type Test Report from Central Govt. NABL/ILAC Accredited lab covering all technical requirements. Yes - Type Test Certificate No. NTS/PPTL/UPS-303/15 - Type Test Certificate date 10.09.2015 - Name of Lab NISAKI TECHNOLOGY SERVICES - Address of Lab No.46, Park Road, 2nd Main, 10th Cross, Wilson Garden, Bangalore-560027 - As per Meity (Government of India) guidelines UPS shall have valid BIS CRS certifications as applicable Not applicable presently - * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Kulkarni Mangesh Dattatraya 411037, 583/B, Market Yard, Gultekadi, Pune 411037, Maharashtra, India 3 45 EMD Required No ePBG Required No 3/4
Giving power supply to 01 no of PWW Connection of the load 5 hp connection No. 926126003382 in R/o Sarpanch Gram panchayat Gondegaon from DTC -4567236 to new DTC due to low voltage And overloading of existing transformer
Providing Internal E. I., Water Pump, Street Lights. LAN Wiring, Telephone Wiring, 100KVA Transformer and SITC of 6 Passenger Lift G plus 3 for Newly Constructed Regional Office Building for Joint Director, Higher Education, Jalgaon. Tal. and Dist. J
Supplying erecting testing and comissioning of new infrastructure (HT Line, LT Line with AB cable and Transformer) For rehabilitation of Mouza rehabilitation Dadulgaon at Pimpri Khodri in Gut No. 192, 193, 194, 195 Part, 196 Part, 198Part, 199 Part,
P/L/L/J 300mm and 200mm dia DI pipeline at Baba bangle to Bunder Ali Transformer, Smashan bhumi chavi to Baba bangle, Balaji Hospital to Kalubai Apartment and Kulswamini Temple to Diva Railway Crossing under Diva Ward Committee.
Est. No. 3104,3105/2022-23 Providing Electrical Installation ,Street light , HT LT line with 63 KVA Transformer at Newly Constructed PHC Bulding and 2 no MO Qurter and 4 no Staff Qurter at Kanegaon, Makani ,TQ- Lohara , Dist. Osmanabad.
Est. No. 133010/24-25 (Sub-Work I to VIII) Providing E.I., Ex. E.I, A.C.,D.G. Set, Stage Lighting, Transformer, Audio System, and Lift.in Newly Constructed Auditorium Building at Udgir Dist. Latur. (Sub-work I to VIII) (3rd Recall)
Insulating Oil For Transformer As Per POWERGRID TS (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6579199 Dated : 25-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 3 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Regional Director, NRBPSU NRB Purchase & Stores Unit, 6th Floor, South Wing, Vikram Sarabhai Bhavan (VSB, Anushaktinagar, Mumbai - 400 094 (Ref. no. DPS/NRBPSU/03/N2/1616) (A K Jha) Splitting
Est. no. OW 5258 2022-23 Providing Internal Electrification,Transformer S S, DG, Lift, SWH System, Solar Ongrid, Water Pump , Street Light an AC System at Newly Constructed 160 Girls Hostel in the Premises of SRTRMC and Tq Ambajogai Dist Beed
Est. No. 1591/1592/1593/21-22 Providing 630 KVA transformer, metering cubical and main panel, 250 KVA D.G. Set and Necessary Switch Gears and Cable for 1000 LPM x 2 nos PSA Medical Oxygen plant VDGIMS Latur Dist Latur.
M and R to Shahad Water Supply Scheme and UDDS Dombivali Replacement of metering Kiosk at Raw Water Works Providing D G Set for lightning load at WTP Shahad and repairs 250 KVA transformer at Phase II effluent pumping station Dombivali.
Providing Internal Electrification, Fire Fighting CCTV 200 KVA Transformer with Area 1 KV HTOH line Area Lighting Water pump system and solar Hot water system and Solar PV system to proposed Residential Quarters Type I 6 nos bldg Type I
Prov. LAN wiring, telephone wiring, 500 KVA Transformer, 02 Nos. of 20 Passanger cum Strecher hospital lift system and addressable Fire Alarm System for 100 Beded Women Hospital building at Bhabha Nagar, Nashik, Tal. and Dist. Nashik.- Subwork 1 to
Supplying erecting testing and comissioning of new infrastructure (HT Line, LT Line with AB cable and Transformer) For electrification and rehabilitation of village Mouza Kathora (Jigaon Project) at Mouza Kathora in Gut No. 191 To 199 and 202 to 204
Providing Internal and External Electrical Installation, AC System,Water pump system, 10 Passanger Lift, 100 KVA ,11 0.433 KV transformer, 100 KVA DG set with AMF panel,Area lighting ,Fire Fighting an Fire Alarm System and Solar PV System for And
Supplying And Erecting 11KV H.T Line. L.T (with A.B Cable) and Transformer At. Rehabilated Village. Mamulwadi coming Under The Submergence area of Jigaon Project to Village At. Mauza Mamulwadi Shivar land bearing G.N. 77. 78.79. 80. 81. 88. 89. 90.
Est. No. 1540 /20-21 Providing shifting of OH line, 315 KVA transformer substation, street light, Fire fighting, Fire Alarm and Sprinkler system Lift, water pumps and 200 KVA Diesel Generating Set in the premises of Newly constructed P.L. Govt. Poly