Loading…
Loading…
72,932 results • Best match
Rewinding and repairing of 500 KVA, 11KV by 440 Volt, 3 phase, power transformer, make Crompton Parkinson S.NO. 18343 at zero seam substation of GKKC
SUPPLY AGAINST EARTHING OF 2X3 MVA POWER TRANSFORMER, GROUND TO BODY, SWITCH YARD AND CONTROL PANEL AT 33/11KV SUB STATION NACHANI UNDER EDSD MUNSYARI
Const of tube well boring for power transformer earthing at 33/11 KV S/S Rajwada, Basni(Mundawar), Bhura siddh,Nurangabad,MIA Campus,Dabur Zone.
Partial Repairing and Overhauling 750KVA power transformer 11KV/550V Including insulator and Testing with commissioning the same at 11KV Substation of 9 Pit Simlabahal Colliery.
Repairing and Replacement of Insulation Bushing and Cork Sheet for 300KVA Power Transformer 11 KV/440V Feeding Power to Victory Staff Colony Under Bastacolla Colliery.
Re-organization of NGR controlling of 1 MVA Power Transformer with shed and proper earthing arrangement at New substation of Karma Project under Kuju Area
Partial Repairing Cork Sheet Changing Stud and Bushes and etc of 5000/7500 KVA/33KV/11KV Power Transformer Make Andreyule at 33 KV Golakdih Substation.
Complete Rewinding/ Repairing of One No. 500 KVA 11KV/550 Volt Power Transformer Sl.No. ST-NT/PTR/JN-2 of Amal. NT-ST-JG Colliery.
Fixing of double core double ratio CT in primary control switches of different power transformer of different rating installed at Different colonies under Kargali OCP.
Complete repairing and rewinding of 1000KVA 11KV 3.3 KV Marson make Power transformer millenium incline surface sub station at Shankarpur Colliery udner Bankola Area(retender).
Schedule of works for construcion of wire mess fencing on differnence medium power transformer in area of E.D.S.D.-II, Nawabganj under EDD-V, Hasanganj, Unnao.
Modification and Raising of existing PTR Plinth for 160 MVA Power Transformer in the premises of 220KV Sub-station, Bommuru, Rajamahendravaram in East Godavari District
Complete repairing/rewinding of 11KV/440volt GEC Make 500 KVA power transformer Colliery Sl.No- Mur/TR/08(a) at Dozer section Muraidih under AMP Colliery.
Labour charges for Erection and Dismantling of Power Transformer from 1x5MVA to 1x8MVA, 33/11KV for Sirukalambady 33KV SS in Tiruvannamalai EDC under IPDS scheme .
Repairing of 02 nos. power transformer 2 MVA, 6.6 KV, Make NGEF in PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL.
For the Work of Replacement of Damaged 10 MVA Power Transformer of Defence Enclave Sub-Station and Maintenance Work of EUDD-33 KV Line, Meerut.
Repairing of 6.6KV, 400Amps Sait Mineline Sl. No. SA 1301 VCB for controllimg of 2MVA power transformer of Minop Safety sub-staton Muraidih, AMP Colliery.
Repairing of 2 numbers of control panels (Primary and secondary control) of 1 MVA power transformer at pit office substation Tapin South OCP, Hazaribagh Area.
Maintenance of 2000KVA Power Transformer 11KV/3.3KV M and B Make Sl. No. 129031 and fitting of WTI, OTI and Bucholz relay installed at ABGC
Overhauling and cork sheet changing and testing and changing of 2.5 MVA, 11KV/3.3KV Power transformer SL NO 10638 make M and B switch gear.
Testing of 33/11 K.V. Feeder Panel, Breakers AND Power Transformer at different 33/11 Sub-Stations in area of Electricity Distribution Division-I, Unnao
Repairing of power Transformer 12.5MVA, 33KV 6.6KV, Sl. NO. 2800044223, make NGEF in sub station yard at Madhuban Coal Washery under Block II Area, BCCL.
Estimate for installation of New 1X5 MVA 33/11 KV Power Transformer Sub-Station at Village Gormi Under Gormi D/C in OandM division Mehgaon
Supply, erection, testing and commissioning of new 33/11kv Kottanathampatty substation at Vellalore village with 2x8mva outdoor power transformer in Madurai EDC in Madurai Region
COMPLETE REWINDING/REP AIRING OF 1000KVA/11/KV/3. 3KV POWER TRANSFORMER OIL COOLED TYPE, MAKE GEC, SL NO. 224305/by2 OF BHOWRA ABNS COLLIERY
Part re-winding of 3mva 11/3.3kv power transformer make GEC sl. No. CT 4368/b24066 currently kept out of operation at gandhi nagar substation
Repairing overhauling of 300 KVA, 3.3KV 415 KV 3 Phase, Power Transformer Metropolitan Vickers make, Sl No. AMBD 1 of 33KV Sub-Station of Amlabad.
WORK OF CONSTRUCTION OF PLATFORM OF POWER TRANSFORMER OF KASHMIR AVENUE FEEDER NANAKSAR FEEDER INDRA COLONY FEEDER UNDER EAST DIVISION AMRITSAR UNDER RANGLA PUNJAB SCHEME
providing of 25MVA plinth foundation for power transformer in Erode 110/22 KVSS and Colour washing the outside walls of CE Quarters at EEDC Erode
Providing and fixing of double core double ratio CT in secondary control switches of different power transformer of different ratings installed at MRSS BnK Area
Providing fixing and maintenance of cooling fan and marshalling box of 132 KV power transformer at diffirent sub stations of ETSD I under ETD Hardoi
Augmentation of power transformer capacity from existing 1x50+1x80MVA to 2x50+1x80 with additional bay at 132KV SS K.P.Mitta in O and M Circle Tirupathi
Augmentation of power transformer capacity from existing 1x50+1x80MVA to 2x50+1x80 with additional bay at 132KV SS K.P.Mitta in O and M Circle Tirupathi
Augmentation of power transformer capacity from existing 1x50+1x80MVA to 2x50+1x80 with additional bay at 132KV SS K.P.Mitta in O and M Circle Tirupathi
Augmentation of power transformer capacity from existing 1x50+1x80MVA to 2x50+1x80 with additional bay at 132KV SS K.P.Mitta in O and M Circle Tirupathi
Augmentation of power transformer capacity from existing 2x31.5MVA to 2x31.5+1x50 MVA with additional bay at 132KV SS N.Racherla in O and M Circle Kurnool
Modification of the existing 11 KV kiosk 1 LV side Power Transformer with outdoor CTs Breaker and Isolators at 220 KV Krishnagiri Substation under RMI
Augmentation of power transformer capacity from 1X80+1X50 MVA to 1X50+2X50MVA with additional bay at 132KV SS K.P.Mitta in O and M Circle, Tirupathi
Erection of Additional 31.5 MVA 132/33KV new power transformer for augmentation of PTRand connected bay works at 132/33KV SS Kambhampadu in Krishna district
Providing bay features in connection with erection of 4th 160MVA 220/132kV Power Transformer at 220/132/33kV Bobbili SS in O&M Circle, Vizianagaram
Augmentation of Power Transformer Capacity from 2X31.5 MVA to 1X31.5 MVA + 1X50 MVA at 132 KV Sub-Station, Dhone in O and M Circle Kurnool
Providing bay features in connection with erection of 4th 160MVA 220/132kV Power Transformer at 220/132/33kV Bobbili Growth Centre SS in Vizianagaram District
Work of Repair, Rewinding, Reconditioning of 400 kVA, 11 kV/433 Volts Power Transformer No-2 Installed at Allipura Water Treatment Plant in Ballari City.
Augmentation of Power Transformer Capacity from 2X31.5 MVA to 1X31.5 MVA+1X50 MVA at 132/33 KV Sub-Station, Dhone in O&M Circle, Kurnool
EXPANSION TYPE TERMINAL CONNECTOR for 25 KV, 60 mm dia Terminal for traction power transformer RI No 11221, 11222, 11223 & 11224 complete set Make: Self
Supply, Installation, Testing and Commissioning of 2 Nos. X 20/25 MVA 33/11kV Power Transformer at NDMC Trauma Centre Substation, New Delhi (re-call).
stimate for installation Addl. 1x5 MVA Power Transformer at 33/11 KV Sub Station Bhadona under IndarGarh II D/c (O AND M) Division Datia
AUGMENTATION OF POWER TRANSFORMER FROM 3.15 MVA TO 6.3 MVA AT SANKRAIL AND NAYAGRAM 33/11KV SUB STATION UNDER BELDA DIVISION UNDER PASCHIM MEDINIPUR REGION
Estimate for installation Addl. 1x5 MVA Power Transformer at 33/11 KV Sub Station Katapur under IndarGarh I D/c (O AND M) Division Datia
WORK FOR 33 11 KV SUBSTATION NIRMANA AND LACHEDA EXISTING POWER TRANSFORMER TO BE OIL LEAKAGE AND DAMAGE PACKING CHANGE AND OIL LEVEL DONE WORK