Loading…
Loading…
15,080 results • Best match
THE WORK OF REPLACEMENT OF 40 MVA TRANSFORMER WITH ERECTION OF NEW 63 MVA TRANSFORMER AGAINST INCREASING CAPACITY AT 132 KV SUB STATION SAMBHAL UNDER ELECTRICITY TRANSMISSION DIVISION SAMBHAL
WORK OF DISMANTLING OF 20 MVA TRANSFORMER No.-II AND INSTALLATION OF NEW 40 MVA TRANSFORMER AND OTHER ASSOCIATED WORKS AT 132 KV S/S PURNACHHAPAR UNDER ETD, DEORIA
Replacement of defective 20MVA Transformer-I (BHEL make) with another available 20MVA Transformer (BHEL make) at 132KV Sub Station Bisalpur, Pilibhit alongwith other associated Works under E.T.D.-II, Bareilly
WORK OF DISMANTLING OF 20 MVA TRANSFORMER No.-I AND INSTALLATION OF NEW 40 MVA TRANSFORMER AND OTHER ASSOCIATED WORKS AT 132 KV S/S PURNACHHAPAR UNDER ETD, DEORIA
Replacement of 40MVA 132/33KV Transformer (Telk make) by new 63MVA 132/33KV Transformer (Atlanta make) alongwith other associated Works at 132KV Sub Station Pilibhit under E.T.D. - II, Bareilly
WORK OF TRANSFORMER FAN AUTOMATION OF 40 MVA, 132/33 KV TRANSFORMER NO. I AND 20 MVA T/F-II AT 132 KV SUBSTATION KUNDARKI UNDER ETD-I, MORADABAD.
For Installation of 250 KVA Transformer Near By Budhana Police Chowki to Avoid Overloading of 100 KVA Transformer in the Area Of EUDSD-II, Meerut Under EUDD-I, Meerut.
For the Work of Business Plan 2023-24 to Installation of 01 No. Additional 250 KVA Transformer Due to Overloading of 400 KVA Transformer Work Under EUDD-II, Meerut.
SPECIAL REPAIR /REPLACEMENT OF HT CABLE FROM POWER HOUSE TO 111 HU, PROVISION OF TROLLY MOUNTED TRANSFORMER AND SHIFTING OF TRANSFORMER, DG SET,PANEL BOARD AT AF STATION BAREILLY
Supply of 33 KV Control Panel for Single Transformer (with differential relay), 33 KV Control Panel for Double Transformer (with differential relay) and 33 KV Single Feeder Control Panel
For Safe loading Carriage and unloading and proper stacking of Repaired Transformer 25 KVA to 100 KVA from Transformer Repairing One Workshop to another workshop center under, Prayagraj Zone
Increasing capacity of 400 K.V.A. Transformer in to 630 K.V.A. Transformer at Aam Ka Ped in the area of E.U.D.S.D.-Rajajipuram-New under E.U.D.D.-Rajajipuram, LESA CIS Gomti, Lucknow.
Increasing capacity of 250 K.V.A. Transformer in to 400 K.V.A. Transformer at Ek Minara Masjid in the area of E.U.D.S.D.-Rajajipuram-New under E.U.D.D.-Rajajipuram, LESA CIS Gomti, Lucknow.
Increasing capacity of 400 K.V.A. Transformer in to 630 K.V.A. Transformer at Bajpai puri wala in the area of E.U.D.S.D.-Rajajipuram-New under E.U.D.D.-Rajajipuram, LESA CIS Gomti, Lucknow.
Required work for Topping of transformer Oil and stoppage of leackege from LT Transformer in the area of SDO Clyde road Lucknow, in the jurisdiction of EE, EUDD(Rajbhawan)
Replacement of damaged Transformers in 24 Hours at area of Electricity Distribution Sub Division-I and Amhat, Basti having the capacity of 250 KVA to 630 KVA under Electricity Distribution Division-I, Basti.
Replacement of damaged Transformers in 24 Hours at area of Electricity Distribution Sub Division-I and Amhat, Basti having the capacity of 10 KVA to 100 KVA under Electricity Distribution Division-I, Basti.
Chemical Earthing to be done for 400/132 KV Power Transformer, Reactor, 400 KV, 132 KV Switchyard at 400/132 KV S/S Masauli, Prayagraj under ETD-II, Prayagraj.
For Preventive Maintenance of Medium Power Transformer installed at various site in the area of Substation Faizullaganj Priyadarshini and GSI under Executive Engineer EUDD Sitapur road Transgomti LESA Lucknow
The work of Replacement of Repairing and Overhauling of 10 MVA Power Transformer installed at 33/11 KV Substation, New Tanda under the Jurisdiction of Electricity Distribution Division, Tanda.
The work of Replacement of Repairing and Overhauling of 10 MVA Power Transformer installed at 33/11 KV Substation, Barwa Bairmapur under the Jurisdiction of Electricity Distribution Division, Akbarpur.
FOR WORK OF OVERHAULING, REPAIRING AND TESTING OF 02 NOS T/F VCB OF BOTH POWER TRANSFORMER INSTALLED AT 33/11 KV S/S NAKATIA UNDER EDD-II, BAREILLY
Safe loading Carriage, Unloading and proper stacking of Reclaimed/Fresh/burn/damage Transformer Oil from different substation/ repairing workshop under Basti zone under EWD Basti
RAVNESH KE GHAR SE GANJ ROAD TRANSFORMER TAK RCC NIRMAN KARYA AT MOHANPUR
Civil Construction works for installation of 315 MVA Transformer
INSTALLATION OF 100 KVA DISTRIBUTION TRANSFORMERS EARTHING OF DISTRIBUTION TRANSFORMERS AND SUPPLY OF TRANSFORMER HANDLING TROLLEYS UNDER BUSINESS PLAN 2026 27 WITHIN THE JURISDICTION OF ELECTRICITY DISTRIBUTION DIVISION HAPUR
For the work of Replacement of old and damaged transformers in the area of EE, EUDD-I, Mathura.
Supply of Henley Type Tailless Fuse Unit with Cu. Busbar, Cu-L-Piece and Al. Lugs Suitable for 250 KVA Transformers
Supply of Henley Type Tailless Fuse Unit with Cu. Busbar, Cu-L-Piece and Al. Lugs Suitable for 400 KVA Transformers
Supply of Henley Type Tailless Fuse Unit with Cu. Busbar, Cu-L-Piece and Al. Lugs Suitable for 630 KVA Transformers
Testing of 60 MVA Transformer-II at 220 KV Sub Station Harahua Under ETD-I Varanasi
Repairing of 160 KVA and 250 KVA damaged Transformer at Kasia workshop Kushinagar under EWD Gorakhpur
Repairing of 160 KVA and 250 KVA damaged Transformer at Gorakhpur workshop Gorakhpur under EWD Gorakhpur
Repairing of 160 KVA and 250 KVA damaged Transformer at Jaunpur workshop Jaunpur under EWD Varanasi
Repairing of 160 KVA and 250 KVA damaged Transformer at Azamgarh workshop Azamgarh under EWD Azamgarh
QUICK COUPLING SET FOR 3 PHASE FRT LOCO TRANSFORMER FOR DETAILS REFER ENQUIRY AND TENDER DOCUMENT
Repairing of 11/0.4kv 10,25,63 and100 KVA Damage Transformer at Gorakhpur Workshop Gorakhpur Under EWD Gorakhpur
Repairing of 160 KVA and 250 KVA damaged Transformer at Kasia workshop Kushinagar under EWD Gorakhpur
Repairing of 25, 63 and 100 KVA Damage Transformer Old Shade Gorakhpur Workshop under E.W.D. Gorakhpur
Change of the Transformer from welded top cover to new top cover and flange with nuts and bolts at different Transformer repairing Workshop centers area Under EWD Gorakhpur and Basti
PROVIDING GPS ENABLED VEHICLE FOR REPLACEMENT OF DAMAGED TRANSFORMERS IN WHOLE AREA OF T/F REPAIR WORKSHOP GONDA, DISTRICT-GONDA.
Quantum of works for replacement of damaged distribution transformers in area of E.D.S.D.-II, Safipur under EDD-IV, Bangarmau, Unnao.
The work of Capacity Enhancement of Distribution Transformers Under EDD-IInd, Bijnor and EDD-Ist, Chandpur in BP 2024-25
Replacement of damaged Distribution Transformers in Urban area of E.D.S.D.-I and II, Shuklaganj Magarwara under the E.D.D.-II, Unnao
For repairing of 10 and 16 KVA (Shell Type Core) Damage Transformers at Workshop Naini Dist Prayagraj under EWD Prayagraj
Repairing work of 250 and 400 KVA distribution transformers in EDSD Sangipur and Pahadpur under Electricity Distribution Division Lalganj, Pratapgarh.
Carriage and Replacement of Damage Various Capacity Medium Power Transformers RAPDRP Town area Under Electricity Distribution Sub-Division IIIrd Sambhal.
Installation of II-Point different capacity distribution transformers and other associated work in Business Plan scheme under EDD-Raniganj Pratapgarh
For Spray Painting of 220 and 132 KV Power Transformers at 220 KV SS Kirawali under 400 KV SS Division
PROVIDING GPS ENABLED VEHICLE FOR REPLACEMENT OF DAMAGED TRANSFORMERS IN WHOLE AREA OF T/F REPAIR WORKSHOP SITAPUR, DISTRICT-SITAPUR.