Loading…
Loading…
15,096 results • Best match
Vikash Khand Niyamtabad Mughalsarai ke Siddharthpuram Colony me Transformer se Baba General Store tak Interlocking w nali ka Nirman.
Supply, Installation, Testing and Commissioning of Fire Hydrant Systems at Transformer Repair Workshop Dahi Chowki, Unnao on turnkey basis.
Construction work of RCC drain from Companybagh Jalkal residence in Mohalla Tharvarnganj through the prison boundary to the transformer.
Providing of 400 KVA Transformer and L.T. Line in 5 persent Abadi Plot, Village-Nawada Rasoolpur, Sector-62, Noida.
WARD NO-2/05 ME TRANSFORMER PULIYA SE RAJENDRA THAKUR KE MAKAN TAK RCC CAVRD NALI KA NIRMAN KARY.
Bhopal Vihar Mein Ajay hospital ke aage Wali Gali Mein Transformer Se Lekar Rampal ke Makan Tak Sadak Karya,
Ward No. 54 KIDWAI NAGAR STITH NURAHSAN KE MAKAN SE TRANSFORMER TAK RCC NALI EAVAM CC SADAK NIRMAN KARYE
FOR RECLAMATION OF BURNT/DIRTY TRANSFORMER OIL AT ALL WORKSHOPS UNDER EWD- AYODHYA AS PER ISS 1866 OF 2000.
shifting work of 33/11 kv electric line and transformer at delapeer chauraha to airforce tiraha pilibhit road Bareilly.
Installation work of 10 HP capacity tube well including tube well building transformer in Kagdi Mahal area of Urdubazar.
Civil work for increasing Capacity 40 MVA Transformer Bay at 132 KV S/s Ambala Road-I Distt. Saharanpur
Construction of Store Room, JE Room, and Misc. Civil Construction work at Electricity Transformer repairing workshop Baraut, Distt- Baghpat.
TO INCREASE CAPACITY TRANSFORMER AND CONSTRUCTION OF HT LT LINE BY INVITING RUNNING E TENDER UNDER EDD III BULANDSHAHR.
Vikas khand Simbawali ki gram Bhowapur mai Transformer se purane Mandir ki aur Dahana marg par nala nirman karya
Installation of 05 MVA Additional Transformer and VCB at 33/11Kv Substation Banpur Under Jal Jeevan Mission (Deposite Scheme)
SHIFTING OF 132/33KV 63MVA TRANSFORMER (ADITYA MAKE) INCLUDING ALL ASSOCIATED WORKS SUCH AS LOADING, UNLOADING AND CARRIAGE ETC
MO PUREBHAGGAN MAI PRIMARY SCHOOL / TRANSFORMER SE SARVAN KAI PALESAR/MAKAN TAK DONO TARAF PHOOTPATH VA NALI NIRMAN KARYA
REPLACEMENT OF COMPLETE GASKET AND OTHER ASSOCIATED WORKS ON 60 MVA -I 220/33 KV GEC ALSTHOM MAKE TRANSFORMER
GRAM PANCHAYAT BAKULAHI ME TRANSFORMER KE AAGE TAK KRISHNA KUMAR KE DUKAN SE HARIJAN BASTI TAK C.C. ROAD NIRMAN
Repair of plinth and fencing for 250 KVA Transformer of different place under Electricity Distribution Division-Jagdishpur, Distt. Amethi.
INSTALLATION OF 63 MVA,132/33 KV TRANSFORMER BY REPLACING 40 MVA, BBL MAKE ALONG WITH OTHER ASSOCIATED WORKS
3-Ward Aryanagar Me Sarvjanik Sauchalay Transformer Ke Pass Police Chauki Tak Covered Nali and rubber mould Interlocking Karya
Erection of Equipments and structures for interchanging of 132KV Transformer and Line Bay at 132KV Sub Station Harraiya Basti.
Under District Jaunpur Block Sirkoni, Construction of Soling road from Kishundaspur Transformer to Joginder Ram House Lot No 8
Supply, Installation, Testing and Commissioning of Fire Hydrant Systems at Transformer Repair Workshops Gauriganj and Akbarpur on turnkey basis.
Supply and Intallation of Testing Equipments for Transformer at newly workshop Charkhari (Mahoba) and Rajapura (Chitrakut) under EWD, Banda
Repairing/Replacement of damage/burned core at different capacity (63, 100, 250, and 400 KVA) Transformer in Talkatora Workshop
Transformer 415/110V,200VA to INTEC Part No. ICAC-071 for Roof Mounted Air Conditioning System of CAB AC
Freight loco breather assembly with top cover for HETT-5400 KVA Transformer as per RDSO Drg. No. SKEL-4895.
GATE VALVE FOR MAIN TRANSFORMER OF 3 PHASE LOCO AS PER ABB ID NO. HSTN 40743P001 WITH LATEST ALTERATION.
REPLACEMENT OF GASKETS OF 40 MVA AREVA MAKE TRANSFORMER AT 132 KV SUB-STATION GULABBARI UNDER ETD-II MORADABAD
Agency for replacement of stones by gravels of proper size in transformer yards at various units of Mathura Refinery.
Work of replacement of wiring and TPN switch of different sizes of cables in Electricity Transformer Repair Workshop, Balrampur.
The work for repair of damage 4 Nos. 630 KVA/ 400 KVA mobile tolley Transformer under UEDD-V, Varanasi
For work of centrifuging of Oil at 10 MVA Transformer No-02 Shankuldhar and Godauliya under UEDD-I, Varanasi
SERVICING AND OVERHAULING OF OLTC OF TRANSFORMER INSTALLED AT 220KV SUBSTATION MIRZAPUR AND 220KV SUBSTATION CHHANBEY UNDER ETD MIRZAPUR
SFRA TEST, TAN DELTA AND CAPACITANCE TEST OF TRANSFORMER WINDING AND BUSHING AT 400 KV S/S KASARA-MAU.
THE WORK FOR MODIFICATION OF H.V. AND L.V. NEUTRAL EARTHING OF DIFFERENT TRANSFORMER UNDER ETSD-CHANDAUSI UNDER ETD, SAMBHAL
Erection of 63MVA 132/33KV Transformer (Atlanta make) alongwith other associated Works at 132KV Substation Usawan under E.T.D., Budaun
Replacement of Gaskets of 20 MVA Transformer KANOHAR make installed at 132 KV S/S Lalganj under ETD-Mirzapur
Line and Transformer Shifting Electrification and LED Lighting from Kachahary Road to Subash Nagar Chouraha at Mamfordganj Road, Prayagraj
REPAIRING OF DAMAGED 250 KVA 33/0.4 KV SCPL MAKE TATION TRANSFORMER INSTALLED AT 220 KV SUB-STATION NARA
Carriage and fixing work to replace the damaged transformer in the area of Electricity Urban Distribution Division-III, Muzaffarnagar
Repairing/Replacement of damage/burned core at different capacity (250, 400, 630, and 1000 KVA) Transformer in Aliganj Workshop.
REPLACEMENT OF GASKET, ATTENDING OIL LEAKAGE AND CENTRIFUGING OF 160 MVA TRANSFORMER-II (CGL MAKE) WITH ALL ASSOCIATED WORKS
Construction work of RCC drain from plot of Shafiq Ullah to Rashid house (transformer) in Ward No. 25 Bhatufarm
THE WORK FOR MODIFICATION OF H.V. AND L.V. NEUTRAL EARTHING OF DIFFERENT TRANSFORMER UNDER ETSD MORADABAD, ETD-I MORADABAD
SPECIAL REPAIR REPLACMENT RENEWAL OF BER TRANSFORMER AND HT CABLE IN AGE EM EXT ELECT UNDER GE EM LUCKNOW
REPAIR MAINT OF HT 11KV TRANSFORMER GOD VCB RMU HT OVERHEAD LINE AND UG CABLE AT AF STATION GORAKHPUR
PROVN OF 2X500 KVA TRANSFORMER FOR PIRKANTHI AND PHILLORA LINES EACH AT GTC VARANASI CANTT UNDER GE (EAST) PRAYAGRAJ.