Loading…
Loading…
15,036 results • Best match
repair of damaged/burnt power transformer of assorted ratings 5 MVA and 8 MVA 37.5/11 KV or 33/11 KV
For on site Preventive Maintenance of medium capacity distribution transformer (160 KVA to 1000 KVA) at site of various district under EWD, Banda
Earthing Work of 25, 63 and 100 KVA distribution transformer in EDD-I, II, Saidpur and Zamania, Ghazipur under MD Sir discretionary item
Replacement of damaged Distribution Transformer of different capacity against O and M scheme 2024-25 under jurisdiction of E.E, E.U.D.D-Vrindavan, LESA, Lucknow
the work of setting up additional distribution transformer of various capacity under EDD-Ist and IInd Bijnor and Chandpur in BP 2024-25
Replacement of healthy T F instead of damage small Capacity Distribution Transformer (10 KVA to 100 KVA) Under Electricity Distribution Division-Sandila, Hardoi.
For Installation of Modem Meter on 55 Nos Distribution Transformer of R-APDRP Town in EE, Test Division UNDER EDC , BARABANKI , MVVNL, BARABANKI
QUANTUM OF WORKS INVOLVED FOR PROVIDING BORE TYPE EARTHING AT DISTRIBUTION TRANSFORMER UNDER THE AREA OF EDSD PURWA-MAURAWA, UNDER EDD-PURWA, UNNAO.
Installation of 250 KVA Distribution Transformer and related lines in the area of EUDD Hanspuram and Daheli Sujanpur under EUDC-III, KESCo Kanpur
Work of Installation New Additional Distribution Transformer in business Plan 2025 26 under the juridiction of Electricity Distribution Division Chandausi Sambhal and Babrala
For on site Preventive Maintenance of medium capacity distribution transformer (160 KVA to 1000 KVA) at site of various district under EWD, Aligarh
Replacement of healthy T F instead of damage medium Capacity Distribution Transformer (160 KVA to 630 KVA) Under Electricity Distribution Division-Sandila, Hardoi.
Increasing Capacity of Distribution Transformer and other electrical work against Business Plan 2024-25 Under jurisdiction of EDD, Nadarganj, Amousi Zone, Lesa, Lucknow
Increasing Capacity of Distribution Transformer and other electrical work against Business Plan 2024-25 Under jurisdiction of EDD, Mohanlalganj, Amousi Zone, Lesa, Lucknow
Works of providing and fixing tailless units Set for Distribution Transformer in the Area of EDD-II, Amroha under Bussiness Plan Part-II.
For Repairing of 100 KVA TF Cu. Wound to 1000 KVA TF Cu. Wound Damaged Distribution Transformer at workshop Mathura under EWD, Agra
For on site Preventive Maintenance of medium capacity distribution transformer (160 KVA to 1000 KVA) at site of various district under EWD, Jhansi
Increasing Capacity of Distribution Transformer and other electrical work against Business Plan 2024-25 Under jurisdiction of EDD, Malihabad, Amousi Zone, Lesa, Lucknow
Replacement of damaged Distribution Transformer of different capacity against O and M scheme 2024-25 under jurisdiction of E.E, E.U.D.D-Alambagh, LESA, Lucknow
Construction of additional 100 KVA double pole and capacity increase from 100 to 250 KVA in case the installed distribution transformer is overloaded
Repairing Maintenance of medium power distribution transformer on site of capacity 100 KVA to 630 KVA ANDits associated work Under EDD Shahabad, Hardoi
SUPPLY OF FUSE WIRE FOR DISTRIBUTION TRANSFORMER OF VARIOUS CAPACITY UNDER O AND M PLAN IN AREA OF ELECTRICITY DISTRIBUTION CIRCLE-I GORAKHPUR
Increasing capacity of different distribution transformer and line related work in Electricity Distribution Circle-Gauriganj under Business Plan and special M and R.
For on site Preventive Maintenance of medium capacity distribution transformer (160 KVA to 1000 KVA) at site of various district under EWD, Kanpur
Supply and Installation of L.T. Protection Tailness Unit for 250 KVA Distribution Transformer in area of EDC Deoria under Business Plan 2025-26
PERIODICAL MAINTENANCE OF DISTRIBUTION TRANSFORMER HT LT NETWORK ,CALIBERATION OF SWITCHGEAR AND PROTECTION SYSTEM AT CANTT AREA UNDER AOR OF GE I KANPUR
REPAIR PERIODICAL MAINT TO DISTRIBUTION TRANSFORMER AND THEIR CONTROL PANELS AND OTHER CONNECTED WORKS AT WEST OF MG ROAD UNDER GE EM LUCKNOW
Repairing of 10/16 KVA SF Alu wound to 100 KVA TF Alu. Wound Damaged Distribution Transformer at workshop Mathura under EWD, Agra
Replacement work of Damaged Medium Capacity Distribution Transformer (160 KVA to 400 KVA) in the area of Electricity Distribution Sub Division Kachauna, Hardoi
For on site Preventive Maintenance of medium capacity distribution transformer (160 KVA to 1000 KVA) at site of various district under EWD, Agra
Replacement work of Damaged Medium Capacity Distribution Transformer (160 KVA to 630 KVA) in the area of Electricity Distribution Sub Division Sandila, Hardoi.
Supply of 11/0.433 KV, 25 KVA, 1 Star Rating Level-2 Aluminum Wound Distribution Transformer (IS 1180/2014) BIS Certified with ICB
Supply of 11/0.433 KV, 400 KVA, 1 Star Level-2, Copper Wound Distribution Transformer (IS 1180/2014) BIS Certified with Protection Features
Supply of 11/0.433 KV, 25 KVA aluminium wound, 3 star rating Aluminum wound Distribution Transformer (As per IS 1180/2014) BIS Certified
Increasing capacity of distribution transformer and laying of ABC against Business Plan (Package No. 46, 47, 150, 158, 159 and 203/18-19)
REPAIR / MAINT OF 11 KV SUB STATION, HT VCB, HT CABLE END JOINTS, OH LINE DISTRIBUTION TRANSFORMER, PAINTING, CENTRIFUGING OF TRANSFORMER OIL BREATHER, EARTHING, POLE, PAINTING ETC UNDER GE (EAST) AGRA
EXECUTION OF WORK FOR INCREASING CAPACITY OF TRANSFORMER, INSTALLATION OF SECOND POINT DISTRIBUTION TRASFORMER AND NEW DISTRIBUTION TRANSFORMER (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-SAHJANWA, GORAKHPUR
5KVA DISTRIBUTION TRANSFORMER, 415/190V, 3PHASE STEP DOWN TRANSFORMER,DRY TYPE AIR COOL ,UNDER SLANG, FOR LHB AC COACHES SUITABLE FOR MOBILE/LAPTOP CHARGING POINT as per Drawing/Specification: EDTS 3
Distribution Transformer, 3 Phase, 11 kV > 200 KVA up to and Including 2500 KVA (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6651368 Dated : 06-09-2025 Bid Document 1/12 Past Performance 50 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 82000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 30 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/12 PFA/NER/GKP Office Of The Principal Financial Advisor, Indian Railways, North Eastern Railway, Ministry of Railways (Pfa/ner/gkp) Splitting
The Carriage of New/Repaired Medium power Transformer from Store to site and Carriage Damaged/burnt Transformer from Site to Store in juridiction of EE EDD II Gopiganj bhadohi.
Distribution Transformer, 3 Phase, 11 kV > 200 KVA up to and Including 2500 KVA (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6383328 Dated : 11-07-2025 Bid Document 1/11, -- Number of days for which Bid would be auto -- extended 7 Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 1475000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 29500 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 39 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and 2/11 Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr Divisional Finance Manager, NR, LKO 1.EMD/PBG to be submitted to the Sr. Divisional Materials Manager, Hazaratganj Lucknow Office. 2. For any bid related query/submission of documents/correspondence, you may contact following Supervisor: Mr.Nripendra Kumar, ChDMS [Mob9794833772] of the Office of Sr. Divisional Materials Manager, Hazaratganj Lucknow. (Sarvesh Singh) Splitting
Reclamation of Burnt/Carbonized/Dirty Transformer Oil 07 No. Power Transformer
Reclamation of Burnt/Carbonized/Dirty Transformer Oil 08 No. Power Transformer
Reclamation of Burnt/Carbonized/Dirty Transformer Oil 08 No. Power Transformer
Distribution Transformer, 3 Phase, 11 kV > 200 KVA up to and Including 2500 KVA (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7011413 Dated : 18-12-2025 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 3098000 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 61960 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 26 (a). 2/11 EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.DFM/AGC DRM office office campus Near Agra Cantt Station, Agra-282001 (Sr. Dfm/agc)
Supply, Erection, Commissioning and Testing of 2000 KVA, 11000V/440V Distribution Transformer Outdoor Type, filled with fresh transformer oil, complete with all fitting, accessories and mandatory spare parts for CEMD, OTPS, Obra
9KVA, 750V/415V/190V, 3-PHASE DRY TYPE DISTRIBUTION TRANSFORMER, as per Drawing: RDSO/PE/SPEC/TL/0158-2010 REV.1 (TYPE-1), Packing Instruction: ALTERNATOR,RRU, ERRU &ACCESSORIES, TRANSFORMER,BULK INVE
Spot maintenance work of 5 MVA Power Transformer at 33/11 KV Substation Bansi Gramin in O and M head 2023-24
Increasing Power Transformer at 33 11 KV S S Faizullaganj and assoicated work On Semi turnkey basis Under Business Plan 2024 25.
Maintenance of 33/11 KV 05 MVA power transformer installation at 33/11 KV Substation EDSD-Bhagwant Nagar under EDD-Purwa, Unnao