Removal of leakage of oil in the power Transformer 10 MVA 1 installed at 33 avam 11 KV sub station New Cantt
BODY EARTHING AND NUTRAL EARTHING WORK AND OTHER WORK OF 11 KV OF POWER TRANSFORMER AT DIFFERENT SUB STATION UNDER EDD JAHANGIRABAD.
Supply and Earthing of 33/11 KV at Power Transformer in Business Plan 2024-25 Against Turnkey Basis under ETD-II, Prayagraj.
Work of replacement of bushing rod, gasket etc of 10 MVA power transformer installed at Thakurdwara town substation under EDD-3 Moradabad.
Painting of various equipment of Power Transformer at 33/11 KV Sub Station medical under EDSD-I, Medical under EDD IV Meerut
Removal of leakage of oil in the power Transformer 10 MVA No-2 installed at 33 avam 11 KV sub station Aminabad
WORK FOR OIL SAMPLE COLLECTION, DGA TEST, BDV TEST, PPM TEST OF POWER TRANSFORMER AT VARIOUS 132KV S/SS UNDER ETD, MAU.
replacement damaged 05 MVA Power Transformer and Other associated works at 33/11 kv Sub Station Umerpur Meera under EDD II Bijnor
Attending Oil Leakage of 20MVA, 132/33 KV Power Transformer-II at 132KV Sub-Station Kalwari under Electricity Transmission Division-I Basti
BODY EARTHING AND NUTRAL EARTHING WORK AND OTHER WORK OF 11 KV OF POWER TRANSFORMER AT DIFFERENT SUB STATION UNDER EDD JAHANGIRABAD.
SPL REPAIR TO POWER TRANSFORMER 33 11 KV, SER NO.41584 2 MAKE VOLTAMP INSTALLED AT COD AGRA UNDER GE (EAST) AGRA
Repairing and Overhaling of 5 MVA Power Transformer of 33/11 KV Sub Station Nirmochan Ghat Under Electricity Distribution Division Ist Faizabad
Shifting Of 3 Nos Medium Power Transformer and other assosiated work from Awas Vikas Colony to another Place under EDD-I, FTP
For Repairing of 10/16 KVA SF Alu. Wound to 400 KVA TF Cu. Wound Damaged Distribution Transformer at workshop Banda under EWD, Banda
For Installation of Bakelite Strip on HT bushing of 25/63/100 KVA Distribution Transformer for construction of Fuse unit under UEDC-I, Varanasi.
Replacement of damaged Distribution Transformer of different capacity against O and M scheme 2024-25 under jurisdiction of E.E, E.U.D.D-Kanpur Road, LESA, Lucknow
For Repairing of 10/16 KVA SF Alu. Wound to 250 KVA TF Alu. Wound Damaged Distribution Transformer at workshop Hamirpur under EWD, Banda
Shifting of 250 KVA Distribution Transformer From Old State Bank Badwar Road To New State Bank Under EDD II Anand nagar Under EDC Maharajganj
Quantum of works for the repairing of existing plinth of distribution transformer in the area of EDSD-I, under Electricity Distribution Division-I, Unnao
REPAIR/MAINTENANCE OF REWINDING OVERHAULING OIL TOP UP AND OTHER ALLIED WORK OF DISTRIBUTION TRANSFORMER OF VARIOUS CAPACITY AT TECH AREA AT AFS, KANPUR
PERIODICAL MAINTENANCE OF DISTRIBUTION TRANSFORMER, HT/LT NETWORK, STREET LIGHT AND ALLIED SERVICES AT DGQA AND ASC SUPPLY DEPOT AREA UNDER GE (I) KANPUR
Supply of 33/0.433 KV, 250 KVA, 1 Star Rating Level-1 (Previously Level-2) Copper Wound Distribution Transformer (IS 1180/2014) BIS Certified
Increasing Capacity of Distribution Transformer against Business Plan 2022-23 23 under jurisdiction of EDD, CESS-I/II/III/IV, Cis Gomti Lesa, Lucknow
Replacement work of Damaged/healthy small Capacity Distribution Transformer (16 KVA to 100 KVA) in the area of Electricity Distribution Sub Division Kachauna, Hardoi.
Replacement work of Damaged/healthy small Capacity Distribution Transformer (10 KVA to 100 KVA) in the area of Electricity Distribution Sub Division Sandila, Hardoi
Quantum of works for the repairing of existing plinth of distribution transformer in the area of EDSD-II, under Electricity Distribution Division-I, Unnao
Quantum of works for the repairing of existing plinth of distribution transformer under the area of E.D.S.D.-I under Electricity Distribution Division-I, Unnao
Increasing Capacity of 11/0.4 KVA Small Capacity Distribution Transformer in different place against sanctioned packages in the area of EE, EDD-I,Hardoi.
PERIODICAL MAINTENANCE OF DISTRIBUTION TRANSFORMER NETWORK CALIBRATION OF SWITCHGEARS AND PROTECTION SYSTEM AND ALLIED WORKS AT CANTT AREA UNDER AOR OF GE I KANPUR
REPAIR/MAINTENANCE OF REWINDING OVERHAULING OIL TOP UP AND OTHER ALLIED WORK OF DISTRIBUTION TRANSFORMER OF VARIOUS CAPACITY AT DOMESTIC AREA AT AFS, KANPUR
Work Proposed 11 0.4 KV Distribution Transformer Increasing Capacity, 33 KV VCB Work, Switch Yard Work and Strengthening Work of 33 KV Line Work
Supply of 11/0.433 KV, 1000 KVA, 1 Star Rating Level-1 (Previously Level-2) Copper Wound Distribution Transformer (IS 1180/2014) BIS Certified
Supply of 33/0.433 KV, 400 KVA, 1 Star Rating Level-1 (Previously Level-2) Copper Wound Distribution Transformer (IS 1180/2014) BIS Certified
Supply of 33/0.433 KV, 630 KVA, 1 Star Rating Level-1 (Previously Level-2) Copper Wound Distribution Transformer (IS 1180/2014) BIS Certified
For Repairing of 10/16 KVA SP Alu. Wound to 1000 KVA TP Cu. Wound Damaged Distribution Transformer at workshop Kannauj under EWD, Kanpur
Supply and fitment of 5KVA, 415/190 Volt, 3 Phase Dry Type Distribution Transformer as Per EDTS 366, Rev. Nil, Cor-1 or Latest
Construction of Distribution Transformer plinth size at EUDD Gumti Dadanagar Govind Nagar Parag Dairy Kidwai Nagar and world Bank Barra under EUDC II Kesco
Supply of 250 KVA,11/0.416 KV, 3 Phase, 50 Hz, Outdoor type Distribution transformer complete, ONAN cooled, Delta/Star (Dyn 11 Group), Copper wound , plinth mounted Transformer with first fill of Tran
Supply of 160 KVA,11/0.416 KV, 3 Phase, 50 Hz, Outdoor type Distribution transformer complete, ONAN cooled, Delta/Star (Dyn 11 Group), Copper wound , plinth mounted Transformer with first fill of Tran
Supply of 250 KVA,11/0.416 KV, 3 Phase, 50 Hz, Outdoor type Distribution transformer complete, ONAN cooled, Delta/Star (Dyn 11 Group), Copper wound , plinth mounted Transformer with first fill of Tran
5 KVA, 415/190 V, 3 phase dry type Distribution Transformer as per Specification No. EDTS-366, Rev-Nil, COR-2, packing instuctions-p1146 VER 1.0, or Latest. Make: Vimal Transformer corporation, Ramyya
Supply of 11/0.433 KV, 630 KVA, 1 Star Previously Level-2 Now Level-1 as per (IS 1180 Part-I) 2014 (Amendment-4) Copper Wound Distribution Transformer BIS Certified with LT Protection box MCCB
THE WORK OF ESTABLISHEDMENT LT TAILLES UNIT FOR MEDIUM CAPACITY DISTRIBUTION TRANSFORMER PROTECTION OF DIFFERENT 33/11 KV SUBSTATIONS IN BUSINESS PLAN UNDER EDD DIBAI.
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-III, Lesa Cis Gomti-I, Lucknow
THE WORK OF ESTABLISHEDMENT LT TAILLES UNIT FOR MEDIUM CAPACITY DISTRIBUTION TRANSFORMER PROTECTION OF DIFFERENT 33/11 KV SUBSTATIONS IN BUSINESS PLAN UNDER EDD JAHANGIRABAD.
THE WORK OF ESTABLISHEDMENT LT TAILLES UNIT FOR MEDIUM CAPACITY DISTRIBUTION TRANSFORMER PROTECTION OF DIFFERENT 33/11 KV SUBSTATIONS IN BUSINESS PLAN UNDER EDD SHIKARPUR.
Construction of 11 KV line, Installation of New DT and capacity Enhancement of distribution transformer under EDD-I, Mau in additional business plan 2024-25
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-II, Lesa Cis Gomti-I, Lucknow
Construction of 11 KV line, Installation of New DT and capacity Enhancement of distribution transformer under EDD-II, Mau in additional business plan 2024-25,
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-III, Lesa Cis Gomti-I, Lucknow