Loading…
Loading…
15,034 results • Best match
For Making of Water Level Earthing of Medium Power Distribution Transformer of Neutral Bushing and Body of the Transformer in the Area of 33/11 KV Sub-Station Hapur Road, Under EUDD-III, Meerut.
For Making Water Level Earthing of Medium Power Distribution Transformer of Neutral and Body of the Transformer in the Area of 33/11 KV Sub-Station Nauchandi Under Electricity Urban Distribution Division-III, Meerut
60 KVA transformer 750 V/415 V, 3 phase dry type distribution transformer confirming to RDSO specification No.- RDSO/PE/SPEC/AC/0080-2007 (Rev-2) or latest suitable for LHB type AC coaches.
60 KVA transformer 750 V/415 V, 3 phase dry type distribution transformer confirming to RDSO specification No.- RDSO/PE/SPEC/AC/0080-2007 (Rev-2) or latest suitable for LHB type AC coaches.
5KVA Transformer, 415V/190V AC, 3phase, Type III, Dry type distribution Transformer without filter suitable for LHB AC coach as per ICF Specn. No. ICF/ELEC/960 Rev.01 or latest. Routine test certifica
60 kVA transformer 750 / 415V, 3 Phase dry type distribution transformer confirming to RDSO Specification No. RDSO / PE / SPEC / AC / 0080 - 2007 (Rev.2) with RCF annexure 1 for LHB type AC Coaches. F
Capacity increasing of Power transformer installed at the 33/11 kv Ambedkar chowk Substation.
Inspection for both transformer, Labour Charge for both transformer, Transportation for both transformer, H.V. Leg Coil, L.V. Leg Coil, H.V. Bushing, L.V. Bushing, Metal parts for HV bushing, Metal parts for LV bushing, Set of Gasket, Silica gel ... Fresh Transformer Oil, ... Oil, Transformer Oil ...
CENTRIFUGING OF TRANSFORMER OIL OF POWER TRANSFORMERS INSTALLED AT VARIOUS 220/132KV SUB STATIONS
For Repairing of 10/16 KVA Single Phase Alu., Wound to 250 KVA Three Phase Alu. Wound Damaged Distribution Transformer at workshop Farrukhabad under EWD, Kanpur
Increasing Capacity of Distribution Transformer against and construction Line against Business Plan 2021-22 under jurisdiction of EDD, CESS-I/II/IV, Cis Gomti Lesa, Lucknow
For Repairing of 10/16 KVA Single Phase Alu., Wound to 100 KVA Three Phase Au. Wound Damaged Distribution Transformer at workshop Mathura under EWD, Agra
Work of installation of HT fuse system of 250 KVA and 400 KVA distribution transformer in Additional Business Plan 2024-25 under EDD-I, II, Ghazipur
Quantum of works involved in repairing of distribution transformer oil leakage in area of E.D.S.D I Unnao under the area of Electricity Distribution Division I UNNAO
QUANTUM OF WORKS INVOLVED FOR PROVIDING AND FIXING OF 11 KV FUSE SET OF BAKELITE SHEET FOR DISTRIBUTION TRANSFORMER UNDER THE AREA OF EDD-I, UNNAO.
Centrifuging of Power distribution Transformer 800 KVA 400 KVA with OLTC and its servicing overhauling andRefilling oil at 50 Cusec Ganga Jal WTP Pratap Vihar Ghaziabad
For Repairing of 10/16 KVA Single Phase Alu., Wound to 1000 KVA Three Phase Cu. Wound Damaged Distribution Transformer at workshop Hathras under EWD, Aligarh
For Repairing of 10/16 KVA Single Phase Alu., Wound to 400 KVA Three Phase Cu. Wound Damaged Distribution Transformer at workshop Etah under EWD, Aligarh
For Repairing of 10/16 KVA Single Phase Alu., Wound to 400 KVA Three Phase Cu. Wound Damaged Distribution Transformer at workshop Chitrakoot under EWD, Banda
Work for Deep bore Earthing of 5 Nos. Power and 70 Nos. Distribution Transformer at various place in Kidwai Nagar Division under EUDC II KESCo Kanpur
For Repairing of 10/16 KVA Single Phase Alu., Wound to 250 KVA Three Phase Au. Wound Damaged Distribution Transformer at workshop Mainpuri under EWD, Agra
Work for Deep bore Earthing of 5 Nos Power and 70 Nos Distribution Transformer at various place in Dada Nagar Division under EUDC II KESCo Kanpur
QUANTUM OF WORKS INVOLVED IN INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER AT DIFF. SITES IN BUSINESS PLAN YEAR 2025-26 UNDER THE AREA OF EDD-PURWA UNNAO..
For Repairing of 10/16 KVA Single Phase Alu., Wound to 100 KVA Three Phase Au. Wound Damaged Distribution Transformer at workshop Shikohabad under EWD, Agra
For Repairing of 10/16 KVA Single Phase Alu., Wound to 630 KVA Three Phase Cu. Wound Damaged Distribution Transformer at workshop Etawah under EWD, Kanpur
For Repairing of 10/16 KVA Single Phase Alu., Wound to 1000 KVA Three Phase Cu., Wound Damaged Distribution Transformer at Workshop Jhansi under EWD, Jhansi
For Repairing of 10/16 KVA Single Phase Alu., Wound to 1000 KVA Three Phase Cu. Wound Damaged Distribution Transformer at workshop Kannauj under EWD, Kanpur
Quantum of work for replacement of damaged bushing rod, packing and general cheking of distribution transformer in the area of EDSD-Magarwara under EDD-II, Unnao.
Work for Deep bore Earthing of 1 Nos Power and 25 Nos Distribution Transformer at various place in Parag Dairy Division under EUDC II KESCo Kanpur
Construction 11 kv Line and Installaion of Distribution Transformer in various places under Deposit scheme 2022-23 and 2023-24 in jurisdiction of EDD II GOPIGANJ
Repairing AND Maintenance of medium power distribution transformer on site of capacity 100 KVA to 630 KVA AND its associated work Under EDSD-I, Town, Hardoi.
QUANTUM OF WORKS INVOLVED FOR PROVIDING AND FIXING OF 11 KV FUSE SET OF BAKELITE SHEET FOR DISTRIBUTION TRANSFORMER UNDER THE AREA OF EDD-II, UNNAO
The work for installation of Bekelite strip on HT bushing of 25/63/100 KVA Distribution transformer for construction of Fuse unit under UEDC-II, Varanasi
For Repairing of 10/16 KVA Single Phase Alu., Wound to 100 KVA Three Phase Au. Wound Damaged Distribution Transformer at workshop Agra under EWD, Agra
REPAIR AND MAINT OF DISTRIBUTION TRANSFORMER SWITCHGEAR, APFC PANEL AND CONNECTED WORKS IN THE AREA OF AGE E/M EXT (ELECT) UNDER GE E/M LUCKNOW
QUANTUM OF WORKS INVOLVED IN INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER AT DIFF. SITES IN BUSINESS PLAN YEAR 2026-27 UNDER THE AREA OF EDD-MAGARWARA, UNNAO..
For Repairing of 10/16 KVA SP Alu. Wound Core to 25 KVA TP Cu. Wound Core Damaged Distribution Transformer at various workshop under EWD, Agra
Repairing Work of 10MVA Power Distribution Transformer No.- 2 at 33/11 kv old Jail Sub-station Bulandshahr within financial year 2019-20 under EUDD BSR.
increasing capacity of LT distribution Transformer from 63 KVA to 100 KVA and construction of 100 KVA LT sub station in area of SDO cantt, Lucknow
WORK FOR VARIOUS MAINTANANCE WORK OF 5 MVA POWER TRANSFORMER INSTALLED AT 33/11 KV S/S PURKHAS WITH MAETRIAL UNDER EDD CHAIL KAUSHAMBI
Shifting erection and commissioning of new 40 MVA 132 33 KV (ECE make) Power Transformer II at 220 KV Substation Etah under ETD Mainpuri
For the Work of Replacement of Damaged 10 MVA Power Transformer of Rangoli Sub-Station and Maintenance Work of EUDD-33 KV Line, Meerut.
Work of electrode earthing of medium power transformer under business plan 2024-25 in the area of edd i bhadohi and edd ii gopiganj
QUANTUM OF 10 MVA POWER TRANSFORMER AND YARD MAINTENANCE WORK AT 33/11 KV SUBSATION MAURWAN GRAMIN UNNDER EDSD MAURAWAN, UNDER EDD PURWA UNNAO.
Work of Pannel Earthing, Installation of Fuse set, installation of TPMO and Earthing of Power Transformer under ABP 2024-25 in EDD-1st Mau
Work of replacement of 05 MVA power transformer installed at 33/11 KV sub-station Kamhera Dhansari under Electricity Urban Distribution Division-II, Muzaffarnagar.
The work of Replacement damaged 05 MVA Power Transformer and Other associated works at 33/11 KV Sub Station Pipalsana under EDD-Ist Chandpur
REPLACEMENT OF DAMAGED PACKING AND REPAIRING OF OIL LECKAGE IN VARIOUS 33BY11 KV SUBSTATION FOR 04 NOS VARIOUS POWER TRANSFORMER UNDER EDD KARHAL MAINPURI
Fabrication and Installation of fuse unit suitable for 5/8/10 MVA power transformer in the area of Electricity Distribution Circle-Gauriganj, Distt. Amethi.
Repairing of 10 M.V.A. Power Transformer No. 01 installed at 33/11 K.V. Sub-Station UPTRON in the area of E.U.D.D.-UPTRON, LESA, Lucknow.