Loading…
Loading…
15,035 results • Best match
REPAIR/MAINT OF RMUs, DISTRIBUTION TRANSFORMER, HT VCB, ACBs, LBs, HT CABLES AND OTHER CONNECTED ITEMS AT COD INSIDE AND OUTSIDE UNDER GE (I) KANPUR
Increasing capacity of distribution transformer against Additional Business Plan and System Strengthening work 2023-24 under Jurisdiction of EDD, CESS-III, Ciss Gomti, Lesa, Lucknow.
For Repairing of 100 KVA Three Phase Cu., Wound to 630 KVA Three Phase Cu., Wound Damaged Distribution Transformer at workshop Shikohabad under EWD, Agra
Centrifuging of Power distribution Transformer 1500 KVA with OLTC and its servicing overhauling and Refilling oil at 50 Cusec Ganga Jal WTP Pratap Vihar Ghaziabad
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-II, Lesa Cis Gomti-I, Lucknow
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-III, Lesa Cis Gomti-I, Lucknow
Construction of 11 KV line, Installation of New DT and capacity Enhancement of distribution transformer under EDD-III, Ghosi in additional business plan 2024-25
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-I, Lesa Cis Gomti-I, Lucknow
Installation of New Distribution Transformer and related Electrical work on Semi Turnkey basis in Business Plan Year 2024BY25 Under Electricity Distribution Division I_II_III District Mainpuri
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-I, Lesa Cis Gomti-I, Lucknow
INCREASING CAPACITY OF EXISTING DISTRIBUTION TRANSFORMER AND REPLACEMENT OF JAR-JAR ABC /WEASAL/ DOG CONDUCTORON (UNDER BUSINESS PLAN 2023-24) UNDER ELECTRICITY DISTRIBUTION CIRCLE-BALLIA
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-III, Lesa Cis Gomti-I, Lucknow
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-I, Lesa Cis Gomti-I, Lucknow
Work for replacement of various capacity distribution transformer for increasing capacity and construction of line at various places in the area of EDD-I, Jaunpur.
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-III, Lesa Cis Gomti-I, Lucknow
Establishment of distribution transformer and giving connection on nivesh mitra portal under desposit scheme in the area of edd i bhadohi and edd ii gopiganj
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-II, Lesa Cis Gomti-I, Lucknow
Centrifuging of Power distribution Transformer 2500 KVA with OLTC and its servicing overhauling and Refilling oil at 100 Cusec Ganga Jal WTP Siddharatha Vihar Ghaziabad
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-II, Lesa Cis Gomti-I, Lucknow
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-IV, Lesa Cis Gomti-I, Lucknow
Construction of of line/substation and increasing capacity of distribution transformer against business plan UNDER JURISDICTION OF E.E., EDD, CESS-I, CISS GOMTI, LESA, Lucknow
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-III, Lesa Cis Gomti-I, Lucknow
For Repairing of 10/16 KVA SP Alu. Wound to 1000 KVA TP Cu. Wound Damaged Distribution Transformer at workshop Sarsol (Aligarh) under EWD, Aligarh
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-II, Lesa Cis Gomti-I, Lucknow
CA NO.CWE BLY/GE (W) / 32 OF 2023- 2024 REPAIR MAINT OF DISTRIBUTION TRANSFORMER CONTROL PANEL CONNECTED WORK OF EAST AREA UNDER GE (WEST) BAREILLY
Increasing Capacity of Distribution transformer and other electrical work against business plan 2024-2025 under Jurisdiction of EDD, CESS-I, Lesa Cis Gomti-I, Lucknow
11/0.433 KV, 250 KVA, 1 Star Rating Level-1 (Previously Level-2), Copper Wound Distribution Transformer (IS 1180/2014) BIS Certified with Protection Features
supply and work. Survey of consumers linked with L.T. Poles of each Distribution Transformer with pole Number in the area of E.U.D.D.-Aishbagh, LESA, Lucknow.
Required work for Fabrication and erection of wiremesh fencing with retaining wall for 11/0.4 KV Distribution transformer in the area of EE, EUDD Rajbhawan
supply and work. Survey of consumers linked with L.T. Poles of each Distribution Transformer with pole Number in the area of E.U.D.D.-Rajajipuram, LESA, Lucknow.
supply and work. Survey of consumers linked with L.T. Poles of each Distribution Transformer with pole Number in the area of E.U.D.D.-UPTRON, LESA, Lucknow.
BODY EARTHING AND NUTRAL EARTHING WORK AND OTHER WORK OF 11 KV OF POWER TRANSFORMER AT DIFFERENT SUB STATION UNDER EDD III, BULANDSHAHR.
For Preventing Oil Leakage from Power Transformer No.2 at 33/11 KV Fatehpur Old in EDD,Fatehpur UNDER EDC , BARABANKI , MVVNL, BARABANKI
Work for preventive maintenance of 10 MVA power transformer installed at 33/11 KV S/s Radha Nagar Town in EDD-1 FATEHPUR
The work of Replacement damaged 05 MVA Power Transformer and Other associated works at 33/11 KV Sub Station Chowkpuri under EDD, Bijnor.
MAINTENANCE FREE DEHYDRATING BREATHER AS PER ATTACHED ANNEXURE A AND SUITABLE FOR 35 MVA POWER TRANSFORMER HAVING TOTAL OIL OF 19000 LTR APPROX
REPAIR/MAINT OF 33 KV YARD AND POWER TRANSFORMER, CALIBRATION OF SWITCH GEAR AND PROTECTION SYSTEM AT CANTT ARA UNDER GE(I) KANPUR.
WORK FOR REPAIR AND MAINTENANCE OF FIRE WALL BETWEEN POWER TRANSFORMER NO. 01 AND 03 AT 33/11 K.V. S/S, AMINABAD, LUCKNOW
Work to stop oil leakage of 10 MVA power transformer installed at 33/11 KV power substation Roorkee Road under EUDD-I, Muzaffarnagar.
Various type maintenance work at power transformer installed at different Sub Station under jurisdiction of EDD, CESS-II, Lesa Cis Gomti-I, Lucknow
EDD-II, Mughalsarai under 33/11KV sub-station area- Supplying and spreading ballast in the switchyard of 10MVA power transformer installed in Chandhasi.
BODY EARTHING AND NUTRAL EARTHING WORK AND OTHER WORK OF 11 KV OF POWER TRANSFORMER AT DIFFERENT SUB STATION UNDER EDD III, BULANDSHAHR.
For Preventing Oil Leakage from Power Transformer No.1 at 33/11 KV Fatehpur Old in EDD,Fatehpur UNDER EDC , BARABANKI , MVVNL, BARABANKI
Various type maintenance work at power transformer installed at different Sub Station under jurisdiction of EDD, CESS-I, Lesa Cis Gomti-I, Lucknow
WORK OF POWER TRANSFORMER COOLING FAN CONTROL CIRCUIT AND INSTALLATION OF SINGLE-PHASE PREVENTER AT 132KV SUB-STATION KALWARI UNDER ETD-I BASTI.
Maintenance and repairing of 10 M.V.A. Power Transformer No. 02 installed at 33/11 K.V. Sub-Station UPTRON under E.U.D.D.-UPTRON, LESA, Lucknow
WORK FOR REPAIR AND MAINTENANCE FOR 33 11 KV SUBSTATION KINOUNI EXISTING 05 MVA POWER TRANSFORMER OIL LEAKAGE DAMAGE PACKING AND OTHER WORK
WORK FOR 33 11 KV SUBSTATIONS EXISTING POWER TRANSFORMER SAFETY TO REPLACE PROTECTION BOARD OIL METER WINDING METER CONTROL CABLE AND OTHER MATERIAL
100000000001 Supply Cost as per Annexure-4 Supply Cost as per Clause 4A Sl No 1 to 4 minus Buyback Cost as per Clause 4C Sl No 1, 100000000002 Installation Testing and Commissioning Cost as per Annexure-4 Cost as per Clause 4B Sl No 1 to 6, ... Existing Transformer including ...
REPAIRING/REWINDING OF 33/0.433KV POWER DISTRIBUTION TRANSFORMER 500 KVA (CROMPTONGREAVES MAKE) INCLUDING CARTING LOADING UNLOADING FROM WORKSHOP TO SITE AND INSTALLATION AND COMMISSIONING OF TRANSFORMER AND SERVICING REPAIRING OF 33 KVA HT VCB