Loading…
Loading…
1,823 results • Best match
Shifting of Existing 33/11 KV Line LT Line at Mordard to Sivniyapani Road at Barwani. (4.40 Km.)
LT LINE AND OTHERS WORK AS PER ESTIMATE IN WARD NO 15 MISHAN GALI AT JOBAT DIST. ALIRAJPUR
SHIFTING OF HT/LT LINE AND POLE AT TPS-03 LASUDIYA MORI TALAWALI CHANDA ARANDIYA AND MAYAKHEDI INDORE
PROVIDING ZONAL TENDER FOR HT/LT LINE TRANSFORMER SHIFTING WORK UNDER VICTORIA SECTION SUB DIVISION JABALPUR DISTT. JABALPUR.
Shifting and Height Increasing of 11KV LT line of ROB Devari Fatak at section Rithi Distt. Katni (M.P.)
Estimate for shifting of 11 kv line and LT line obstructing left turns at DIG Bunglow Square, Bhopal.
LT line expansion work in different wards of Dhar Nagar Palika Parishad area for the year 2020-21
Shifting of 33kv/11kv/LT line and street light arrangement under Zonal tender at Mauganj Distt. Mauganj (M.P.)
Estimate for shifting 11 kv /LT Line Railway Bridge Crossing Muskabad under Salamatpur dc under oNM Dn. Raisen
Shifting of Existing 11/33 KV Line / LT Line and Transformer at Panchderiya to Imlikheda Road Distt. Indore.
Shifting of Existing 33/11 KV Line / LT Line and Transformer at Sonway to Rangwasa Road Distt. Indore.
POLE SHIFTING INSTALLATION 11 KV LT LINE TRANSFORMER AT MANGALWARA CHOURAHA TO SILARI CHOUK PIPARIYA DIST NARMADAPURAM (M.P.)
External Electrification work for Hospital Bhawan, Distt. Shajapur (1x315 KVA Transformer 11/0.4 KV with HT/LT line)
Shifting of 33kv/11kv/LT line and street light arrangement under Zonal tender at Rewa Distt. Rewa (M.P.)
Pole Shifting of HT/LT line From Paadsutiya to Bhikampur, Nagda Road Khachrod, Distt. Ujjain. (L- 1.50 Km.)
Pole Shifting of HT/LT line From Kumharwadi to Chota-chirola Road Khachrod, Distt. Ujjain. (L- 3.60 Km.)
THREE PHASE LT LINE 5W. ON PCC POLE AT WARD NO 15 AS PER ATTACHED ESTIMATE AT PORTAL
LT LINE SHIFTING WORK AS PER ESTIMATE IN FORM KRASHNA MANDIR TO FARIDBHAI BAGICHA AT JOBAT DIST. ALIRAJPUR
Establishment of LT Line Transformer at kabrishtan Ward No. 04. Under MUNICIPAL COUNCIL KAILARAS DISTT. MORENA Second Call
Pole Shifting of HT/LT line For Kachnariya to Amarpura-Samanera Road, Tarana Distt. Ujjain. (Length - 9.00 Km.)
Shifting of 11kv and LT line From Kushwaha Colony To Sunil Dubey House in Ward no- 03 , Timarni
ESTIMATE FOR EXTENSION OF LT LINE AT VARIOUS LOCATION IN VIVEKANAND WARD, VINOBA WARD AND SHIVAJI WARD BETUL
LT line P.S. OF 06 NO. IRR. PUMP CONNECTION 30 HP LOAD AT VILLAGE BILJHAR NEW CHOUKIDAR FALIYA
Shifting of 33 kv, 11 kv, DTR and LT Line from sundrel fata to Prakash nagar at dhamnod
Shifting work of 33 kV, 11 kV and LT line near Jija Mata Chauraha Shikarpura Police Station Burhanpur.
LT Line Extension work in Different Location of Ward no. 38 Shahdol Town as per NIT and Estimate.
Estt. for Extension of 0.70 km. LT Line in village Puddar under Silwani DC of Oand M dn.Raisen
Repair work of 250 watt HPSV Lamp fitting and LT Line at Nanpur Residential Colony, Nanpur Distt. Alirajpur
Pole Shifting increase height raising of HT/LT line at Jaggakhedi to Lalghati road Mandsaur. (ROB Sanjeet Bypass)
LT LINE EXTENSION AND STREET LGHTNING WORK NEAR GHAROLLA WARD NO 19 SHAHDOL AS PER NIT AND ESTIMATE
Supply ,installation,testing and commissioning of 315 KVA transformer(33/0.4KV) LT line etc complete at filter plant
ESTABLISHMENT OF 200 KVA TRANSFORMER WITH LT LINE FOR CLEANING AND GRADING PLANT WORK IN MANDI YARD JABALPUR
Shifting and Erection of LT line Electric Pole from Shekhar Khatik to Ankush Khatik in Chandi ji ward
LT LINE PS OF 06 NO IRR PUMP CONNECTION 30 HP LOAD AT VILLAGE BILJHAR NEW CHOUKIDAR FALIYA
Installation of 4 Nos. 200 KVA Transformer and LT Line Work in Main Mandi Yard Dalauda Distt. Mandsaur
Providing and Fixing Street light Pole LT LINE (AS Per Estimate) at Manasa Road to Dashhara Maidan Kukdeshwar
COMPREHENSIVE MAINT OF LT TRANSMISSION LINES, LT PANEL, MCCBS AND CONNECTED ITEMS IN CMM AND MAINT OF LT CABLES CONDUCTORS AND CONNECTED ACCESSORIES IN MAP ACCN IN ZONE C UNDER GE (EAST) JABALPUR
Erection/Testing - Commissioning of new 33KV/11KV/LT Lines/distribution substations etc,on turnkey basis in rural/urban areas of Singrauli District under ONM Circle, Singrauli.
LT Lines 3 Phase 5 Wire On PS Joist Support Using Aerial Bunched XLPE Cable With Maxixmum Span of 50 Meters (1) 3 x 50 SQ.MM
Redeployment of 40m NBLW GB Tower Infrastructure including Tower foundation Tower dismantling Tower Erection painting n Earthing at village Rajabala of block Selsella Dist West Garo Hills Meghalaya.
Providing For Pole Shifting and High raising Of LT and HT line On Rajegaon-kirnapur-Lanji- Aamgaon Road , Distt - Balaghat
Pole Shifting and High raising Of LT and HT line on TEDWA to MOHJHARI Road LENGTH 1.35 Km Distt - Balaghat
CONSTRUCTION OF CHOTA UNDWA TO NAYAPADA TO NAVODAYA MULTHAN ROAD LENGTH 7.20 KM INCLUDING LT/HT LINE POLE SHIFTING WORK
Pole Shifting and High raising Of LT and HT line on RISEWADA TO JAMUNTOLA Road , LENGTH 0.90 KM , Distt - Balaghat
Pole Shifting and High raising Of LT and HT line on BHIMODI to TEMNI Road LENGTH 1.5 Km Distt - Balaghat
External Electrification work for Multi purpose indoor sports complex, Nanakheda Ujjain (11/0.433 KV, 1x200 KVA Transformer with HT line)
Construction work of Lonsara to Gawlabedi Via Rehgun Rampura Road Length 6.00 km. i/c LT/HT Line Pole Shifting.
Shifting of LT/HT Line coming in the route of Awaliya Road Nursery to Bhabrapura-Dodnapura-Bhorwada Road Distt. Barwani.
Construction work of Songaon Main Road to Pipali Via Khandlai Road Length 4.75 km. i/c LT/HT Line Shifting.
Construction of Village Lohari to Kotbhidota Road Length 2.00 Km including LT/HT line Pole shifting under sub division Dhar