Periodic Routine/Emergency Patrolling and Cutting/Lopping and Chopping of Trees in the Range of Corridor of 132KV Transmission Lines alongwith other associated Works under ETD, Bareilly during the Period of 1 Year w.e.f. 01.06.2020 to 31.05.2021
Periodic (Bi-Monthly/Quarterly) Routine Patrolling/Emergency Patrolling and Periodic Cutting/Lopping and Chopping of Trees in Line Corridor of 220KV Transmission Lines under ETD-II, Bareilly during the Period of 1 Year w.e.f. 01.03.2020 to 28.02.2021
Periodic (Bi-Monthly/Quarterly) Routine Patrolling/Emergency Patrolling and Periodic Cutting/Lopping and Chopping of Trees in Line Corridor of 132KV Transmission Lines under ETD-II, Bareilly during the Period of 1 Year w.e.f. 01.03.2020 to 28.02.2021
Work of construction of Substation by installing 25 KVA TF with HT line for electrification of drinking water Ranipur under EDD-II Ghazipur
WORK REPAIRING OF DAMAGED ROUND S.T. POLES OF LT/HT LINE IN EUDSD-IV/V, MORADABAD UNDER THE JURISDICTION OF EUDD-II, MORADABAD.
Construction of 33 KV HT Line and Conversion of 33/11 KV Over head Line into under System in different locations of Noida
Construction work of trench for shifting of HT line passing over the commercial plots of Kalindri Nagar Housing Scheme and Mahaveer Nagar Extension
For Replacement of Damaged ABC LT Line to New ABC, Under 11 KV Feeder Nagla Battoo Fed from 33/11 KV Sub-Station University Road and Replacement of Damaged LT Line to New ABC, Under 11 KV Feeder Saket Kunj Fed from 33/11 KV Sub-Station Saint Lukes.
Work of 33 KV, 11 KV, LT line parallel Dismantling and Shifting of old 33 KV, 11 KV, LT line Fed from 33/11 kv S/s Company Bagh/Vivekanand, Ram Ganga Vihar due to Widening and Strengthening of Existing road under EUDD-IInd, MBD (In Deposit Scheme).
EDD-Sakaldiha under work of shifting of high tension wires and LT lines passing over primary and govt. higher primary schools, higher secondary schools within the areas of Block-Sakaldiha, Chahaniya, Barahani, Dhanapur under the Deposit Scheme.
REPLACEMENT OF DAMAGE LT LINE AND POLE SITE AT 24 B. PAC MORADABAD UNDER THE JURISDICTION OF EUDD- II, MORADABAD. (UNDER DEPOSIT SCHEME)
Installation of additional 02 No. Tower in between Loc. No. 33 to 42 at 132KV Usawan-Tilhar S.C. Transmission Line alongwith other associated works under Electy. Transmission Division, Budaun
01 - Pradhan Mantri Yojna Bhopa road parisar me 100 KL, OHT, Rising Men tubewell, Pump House avm 11 KV Power Transmission Line (12.5 KW) bhaar ki sthapana ka karya.
Soil Testing at 03 No. Locations for Construction of Special type Foundation for 220 K.V. Gonda Sohawal Double Circuit Transmission Line at Ghaghra River Near village Ailiparsouli district Gonda
Construction of Well Foundation for River Crossing Tower of 220 KV DC Gorakhpur PG to Maharajganj 220 KV Gopala Transmission Line in Rapti River Tower No 188A and 188B
Removal of sagging, Replacement of defective materials and Painting of Poles in 11 KM long 33KV Transmission Line from SPH to Moth Substation at Sheetla Power House , Distt. Jhansi
Construction of Well Foundation for River Crossing Tower of 220 KV DC Gorakhpur PG to Maharajganj 220 KV Gopala Transmission Line in Rapti River Tower No 189 and 190
Shifting/Height Raising Work of 132KV D.C. Sahaswan-Chandausi and 132KV Sahaswan-Babrala Transmission Line between Tower Loc. No. 03 to 08 alongwith other associated Works under E.T.D., Budaun
MODIFICATION/HEIGHT RAISING OF 220KV D/C PANKI-FATEHPUR AND 132KV DC NAUBASTA-MSKP AND NAUBASTA-DADA NAGAR TRANSMISSION LINE FOR METRO RAIL AT KANPUR, UNDER ETD-II KANPUR.
Shifting of 33 KV and 11 KV Overhead Line coming in the alignment of newly constructed 220 KV Transmission Line (Multi Circuit) from Sector-148 (400/220 KV ESS.)
Shifting and Modification in 132 kV, Three phase double circuit Transmission Line due to construction of 4 Lane Mirzapur bypass in between section Birohi- Vindhyachal section of Prayagraj Division.
The Work for Shifting of 33 KV, 11 KV and LT line in Phase-1 from Pillar No-P-40 to Pillar No-P-32 for Construction of proposed New Fly Over under the area of UEDD-VIII Varanasi under EE, UECD-II in Business Plan-2019-20 on Turn-Key Basis
SHIFFTING OF LT/HT LINE FROM GYANPUR LALNAGAR GOPPUR TO OBT COMPANY MARG, GYANPUR TO LALANGAR MARG UNDER DEPOSITE SCHEME 2025-26 UNDER EDD GOPIGANJ
Work under maintenance and repair, system improvement and deposit scheme of O.H.,U.G. line and breakdown work of LT Lines Distribution Harrisganj under the area of E.U.D.C.-III, KESCo. Kanpur
Work under maintenance and repair, system improvement and deposit scheme of O.H.,U.G. line and breakdown work of LT Lines Distribution Jajmau under the area of E.U.D.C.-III, KESCo. Kanpur.
For Various types maintenance work of HT/LT lines and Sub-Stations, in the work area of B.K.T. Sub-Division, Under the jurisdiction of EDD-B.K.T., LESA, Trans Gomti. Lucknow.
Work for Shifting of 11 KV, LT lines and Transformers under semi turnkey in road wending of Khuja to Umra via Hardaspur Thone touch road under EDD-III Khaga, Fatehpur
ERECTION OF LT LINES AND INCREASING CAPACITY OF 11 KV SUB-STATIONS UNDER PASSED PACKAGE NO. 86, 87, 88, 89/BND/BP/2019-20 UNDER BUSINESS PLAN UNDER EUDD, BANDA
Work for Shifting of 33 KV, 11 KV and LT lines and other electrical equipments in Aliganj-Kampil Marg Chaudikaran under EDD-Pilua, Etah on semi turnkey basis (Deposit Scheme)
Work under maintenance and repair, system improvement and deposit scheme of O.H.,U.G. line and breakdown work of LT Lines Distribution Hanspuram under the area of E.U.D.C.-III, KESCo. Kanpur
Work for Shifting of 33 KV 11 KV and LT lines and other electrical equipments in Firozabad-Jalesar Marg Chaudikaran under EDD-II Etah on semi turnkey basis (Deposit Scheme)
THE WORK OF ERECTION OF 11 KV HT/LT LINES, SINGLE/DOUBLE POLES, INCREASING CAPACITY OF 11 KV SS, INSTALLATION OF ADDITIONAL TFS ETC. UNDER BUSINESS PLAN UNDER EDD, BANDA
Loping and chopping of tree branches coming in the touch of 33 KV, 11 KV and LT lines in the complete jurisdiction of Electricity Distribution Sub Division-Jagdishpur, Distt. Amethi.
Work under maintenance and repair, system improvement and deposit scheme of O.H.,U.G. line and breakdown work of LT Lines Distribution Naubasta under the area of E.U.D.C.-III, KESCo. Kanpur
TRANSPOTATION OF MATERIAL DESTRINGING, CHECK SURVEY, DISMANTLING OF TOWER CASTING OF FOUNDATION,ERECTION OF TOWER,STRINGING OF EARTHWIRE AND EARTING ETC
TRANSPOTATION OF MATERIAL DESTRINGING, CHECK SURVEY, DISMANTLING OF TOWER, CASTING OF FOUNDATION, ERECTION OF TOWER, STRINGING OF EARTHWIRE AND EARTHING ETC.
PROPOSED WORK FOR LINE MAINTENANCE WORK DAMAGE XLPE CABLE REPLACED WORK AND 33 KV 11 KV LINE STRINGING AND MAINTENANCE WORK
TRANSPOTATION OF MATERIAL DESTRINGING, CHECK SURVEY, DISMANTLING OF TOWER CASTING OF FOUNDATION, ERECTION OF TOWER, STRINGING OF EARTHWIRE AND EARTING ETC
TRANSPOTATION OF MATERIAL DESTRINGING, CHECK SURVEY, DISMANTLING OF TOWER, CASTING OF FOUNDATION, ERECTION OF TOWER, STRINGING OF EARTHWIRE AND EARTHING ETC
TRANSPOTATION OF MATERIAL DESTRINGING, CHECK SURVEY, DISMANTLING OF TOWER CASTING OF FOUNDATION, ERECTION OF TOWER, STRINGING OF EARTHWIRE AND EARTING ETC
TRANSPORTATION OF MATERIAL INCLUDING CHECK SURVEY, DISMANTLING OF TOWER, CASTING OF FOUNDATION, ERECTION OF TOWER, STRINGING OF EARTHWIRE AND EARTHING ETC
PROPOSED WORK FOR LINE MAINTENANCE DAMAGE XLPE CABLE REPLACED WORK AND 33 KV 11 KV LINE STRINGING AND OTHER MAINTENANCE WORK
EDD-IInd, Mughalsrai under Work of shifting of high tension wires and LT lines passing over primary and govt. higher primary schools, secondary and higher secondary schools within the areas of EDSD-Chandhasi, Padao under the Deposit Scheme.
Work related to transferring 33/11/LT/HT lines under the full deposit scheme head in the field of various 33/11 KV electricity sub -stations under the electricity distribution division, Modinagar.
FOR REPLACEMENT AND MAINTENANCE OF HT/LT LINE AND POLE DUE TO NATURAL DISASTER, HEAVY RAIN AND STORM WIND UNDER ELECTRICITY DISTRIBUTION DIVISION- KAURIRAM, GORAKHPUR
FOR REPLACEMENT AND MAINTENANCE OF HT/LT LINE AND POLE DUE TO NATURAL DISASTER, HEAVY RAIN AND STORM WIND UNDER ELECTRICITY DISTRIBUTION DIVISION-II, GORAKHPUR
FOR REPLACEMENT AND MAINTENANCE OF HT/LT LINE AND POLE DUE TO NATURAL DISASTER, HEAVY RAIN AND STORM WIND UNDER ELECTRICITY DISTRIBUTION DIVISION- SIKRIGANJ, GORAKHPUR
WORK
ANNUAL MAINTENANCE OF 33 KV 11 KV LT LINE PCC POLE ST POLE JURJAR TAR STAY SET CONDUCTOR AND INSULATOR UNDER EDD UNCHAHAR RAEBARELI
Supply of 3 Phase OFF Line Fault Locator and Signature Analyzer for Testing of Overhead Transmission Lines (SC DC N Multi circuit) of Voltage class 66 KV to 765 KV AC To ETD Fatehgarh Under TSC Zone Jhansi