Loading…
Loading…
3,291 results • Best match
Repairing work of HT, LT lines, transformers etc. for uninterrupted supply during Durga Puja, Dashara, Historic Bharat Milap and Deepawali festival under 33/11 KV substation Babaganj Pratapgarh.
25/2020-21/EDCR Construction of 11KV/LT lines for energization of STW No. 195 PG Kanchanpur and 196 PG Basantpur under the jurisdiction of EDD-Bilaspur, Rampur
Work of removal/maintenance/repair of accidental power interruption of 33/11 LT lines coming under EDD -I, Chandauli under EDSD-I, Chandauli and EDSD-II, Jeevnathpur area.
Work of shifting of 11 KV, LT lines and transformers hindering road widening in the Pradhan Mantri Gramin Sadak Yojana, on semi turnkey basis under EDD-I Pratapgarh
Shifting of 33 KV, 11 KV and LT Lines Due to Road Widening From Nabi Panah to Andhe ki Chauki Road (Chanaige no. 06, 14-15 Km) Lucknow
Supply of various types of materials used in the maintenance and repair work of 33/11 kV substations and HT/LT lines under Electricity Distribution Division Raniganj, Pratapgarh.
For the Work Re-Construction of 33/11KV and LT Lines Damage Due To Heavy Wind (Daiviya Apda) in the area of EUDSD-XIII, M.E.S., EUDD-IV, Meerut.
Protection of LT Lines and other miscellaneous works under the BP 2026-27 within the jurisdiction of EDD-Ist, Chandauli, at EDSD, Chandauli. (on Semi Turn-key basis)
Supply of various types of materials used in the maintenance and repair work of 33 11 kV substations and HT LT lines under Electricity Distribution Division Kunda Pratapgarh.
Work of replacement, maintenance, repair of sudden power disruption in 33/11 LT/HT lines in the area of 33/11KV Sub-Stations under EDSD-IInd, Bhupauli under EDD-Sakaldiha.
Construction of 11KV line UG and dismantling of existing HT and LT Line and Shifting of T/F
01 WORK IN HEAD SYSTEM STRENGTHENING OR REPAIRING OF LT LINE AT DPR Sl NO 1 UNDER EUDC 1 NOIDA
ANNUAL MAINTENANCE OF 33 KV 11 KV LT LINE PCC POLE ST POLE JURJAR TAR STAY SET CONDUCTOR AND INSULATOR
Maintenance or Replacement of Damaged HT and LT Line and Pole under Subdivision IInd and IIIrd under EDD- IIIrd Basti
Repairing work of HT LT line and damaged Pole at various SS of Sub Division HARRAIYA under EDD Harraiya Basti
Repairing work of HT LT line and damaged Pole at various SS of Sub Division BABHNAN under EDD Harraiya Basti
Work of shifting of 11 kv line, construction of LT line and providing Electric connection under deposit plan 2023-24.
issuing connections by Constructing of HT/LT Line and substation Under Jhatpat and Nivesh Mitra portal under EDD-II, Lalitpur.
Repairing work of HT LT line And damaged Pole at various SS of Sub Division Parasrampur under EDD Harraiya Basti
Construction of LT Line and New T/F Installation for Nagar Nikaay Under EDD Ist Basti on semi turnkey basis.
Internal electrification in 8 no. B type shops, 1 no. 12X88m APF and extension of LT line at NMY Gangoh.
issuing connections by Constructing of HT/LT Line and substation Under Jhatpat and Nivesh Mitra portal under EDD-I, Lalitpur.
shfiting of HT and LT Line in Jiganahava chotiya marg in deposite scheme on semi turnkey basis under EDD Bansi
Repairing of LT line and repairing of Highmast and street light, S/F of LED light at NMY Salon, Raebareily.
Shifting of 11KV, LT line and T/F in Chandpur, Industrial State Extension and ADM block, Varanasi under Deposit Scheme
Repairing of HT/LT Line of 11 KV feeder Atariya world Bank, Gandhauli and Mahmoodabad feeder under EDD-II, Sitapur
Repairing work of HT LT line and damaged Pole at various SS of Sub Division Vikramjot under EDD Harraiya Basti
Maintenance or Replacement of Damaged HT and LT Line and Pole under Subdivision Rudhauli and Bhanpur under EDD- IInd Basti
Repairing work of HT LT line and damaged Pole at various SS of Sub Division Dubauliya under EDD Harraiya Basti
CONSTRACTION OF HT/LT LINE AND OTHER RELATED WORK AT VARIOUS PLACES(RUNNING TENDER)UNDER DEPOSITE SCHEME UNDER EDD,SHRAWASTI
SHIFTING OF 33KV AND 11KV AND LT LINE FROM PAHASU TO SHIKARPUR IN FULL DEPOSIT SCHEME UNDER EDD 3 BULANDSHAHR
WELDING OF ST POLE OF HT/LT/ LINE UNDER THE JURISDICTION OF SDO EDSD-II MURADNAGAR UNDER EDD MURADNAGAR DIVISION
Replacement of HT line and Construction new line for releasing 200 KVA Connection in the head Deposit Scheme Under EUDD-Bamrauli, Prayagraj.
For Installation of 11/0.4KV, 250KVA Transformer and Construction of HT Line at Anand Nagar Kandawa, Varanasi under Business Plan 2019-20.
Work of repairing and maintainance of HT Line in the area of 33/11 kv S/s Raya under EDSD- Raya, Mathura.
Construction Of 33 KV HT Line and Conversion of 33/11 KV Overhead Line into Underground System In Different Location of Noida
Work of constructing 02 Km LT line in Village Basdaliya under 33/11 kV power SS Naugarh, and construction 2.5 km LT line under SS Rehra and converting 21.67 km 2 phase line into 3 phase under SS Jogia. Under BP 2024-25 under EDD Siddharthanagar
Repairing of LT line, extension of LT line, S/F of LED street lights, S/F of main switch, change over switch, S/I of 15hp submersible pump and starter, Construction of 1 no. mini boring and S/F of 1HP Submersible Pump at NMY Gangoh.
Periodic (Bi-Monthly/Quarterly) Routine Patrolling/Emergency Patrolling and Periodic Cutting/Lopping and Chopping of Trees in Line Corridor of 132KV Transmission Lines under E.T.D., Budaun during the Period of 1 Year w.e.f. 01.03.2020 to 28.02.2021
Periodic (Bi-Monthly/Quarterly) Routine Patrolling/Emergency Patrolling and Periodic Cutting/Lopping and Chopping of Trees in Line Corridor of 220KV Transmission Lines under E.T.D., Budaun during the Period of 1 Year w.e.f. 01.03.2020 to 28.02.2021
FOUNDATION WORK, TOWER ERECTION AND STRINGING WORK INCLUDING DISMANTLING OF DAMAGED TOWER AT TL NO-23 OF 132 KV NEW TANDA(220KV)-GOSAISINGHPUR DC LINE UNDER ETD SULTANPUR
Various types Repairing and Maintenance work of HT/LT line and substation and other associated work area of GPRA Sub Division, emanating from 33/11 KV S/S GPRA, SAHARA, SHRISTY, INTEGRAL UNIVERSITY, Under the area of EDD-BKT, LESA, Trans Gomti, Luckn
Custom Bid for Services - 33 KV line strengthening work and LT line Strengthening work and other LT line associated work on Semi-Turnkey basis in Business Plan 2026-27 under the area of EDD, Kiraoli and Kheragarh Agra Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
LAYING AND STRINGING OF ZEBRA CONDUCTOR BETWEEN LILO POINT OF 220KV GORAKHPUR PG- BANSI LINE LILO AT 220KV SUBSTATION DULIHUPAR
erection of ABT Energy meter stringing of slack span on 220 KV Interconnector bay II at 220 KV substation Gonda
Stringing of transfer Bus and interconnection of Bus bar etc at 132 KV S S Bansi, Under ETD-II Basti
ROUGH SURVEY FOR CONSTRUCTION OF 220KV D/C TRANSMISSION LINE AT GIDA AREA BY DISMANTLING OF 220KV BARAHUWA- TANDA AND 220KV BARAHUWA-PGCIL LINE UNDER ETD-II, GORAKHPUR
Development of Transmission Line (400kV) 80kM approx. as per General Technical Specifications for evacuation of Power generated from 1200 MW Solar Power park in District Jalaun, Uttar Pradesh.
Design Engineering Manufacturing Testing Supply Stringing Installation Testing Commissioning etc. for Construction of 132 KV Transmission lines on ACSR Panther conductor (approx. 123.97 route Kms) of UPPTCL on Turn-key basis
Work of shifting of high tension wires and LT lines passing over primary and govt. higher primary schools, secondary and higher secondary schools within the areas of EDSD-Chandauli,Jivnathpur,Saiyadraja under the Deposit Scheme.