Loading…
Loading…
3,291 results • Best match
Monthly Routine Emergency Patrolling and Periodic Cutting Lopping and Chopping of Trees in Line Corridor and Routine General Normal Preventive and Breakdown Maintenance of various 132KV Transmission Lines alongwith other associated Works
Periodic (Bi-Monthly/Quarterly) Routine/Emergency Patrolling and Periodic Cutting/Lopping and Chopping of Trees in Line Corridor of 220KV Transmission Lines alongwith other associated Works under E.T.D., Budaun w.e.f. 01.03.2021 to 30.06.2021
Periodic (Bi-Monthly/Quarterly) Routine/Emergency Patrolling and Periodic Cutting/Lopping and Chopping of Trees in Line Corridor of 132KV Transmission Lines alongwith other associated Works under E.T.D., Budaun w.e.f. 01.03.2021 to 30.06.2021
Replacement of 70 120 160 KN old puncture damaged porcelain disc insulators by composite silicon rubber polymer insulators on various 220 KV and 132 KV Transmission lines under Electricity Transmission Division II Aligarh
Deployment of manpower for assistance in maintenance of EHV substations and transmission lines associated with 400/220 kV Shahjahanpur substation and 220/132 kV Sitarganj substation of POWERGRID for 2 years through GeM
11 KV/LT Lines Reinforcement Work under Additional Business Plan 2023-24 (339 Crore) in the area of EDD-III, Mathura on Semi Turn-Key Basis
Replacement of 33 KV/11KV/LT lines pole line, cable etc. damaged due to various reasons Deviya Aapda and restoration of supply under EDD-III, Aligarh
Replacement of 33 KV/11KV/LT lines pole line, cable etc. damaged due to various reasons Deviya Aapda and restoration of supply under EDD-I, Aligarh
Replacement of 33 KV/11KV/LT lines pole line, cable etc. damaged due to various reasons Deviya Aapda and restoration of supply under EDD-III Aligarh.
Shifting of 33 kV, 11 kV, LT lines and transformers under Electricity Distribution Division-I, Pratapgarh on semi-turnkey basis including loading and unloading of material.
Replacement of 33 KV/11KV/LT lines pole line, cable etc. damaged due to various reasons Deviya Aapda and restoration of supply under EDD-II Aligarh
FOR WORK OF MAINTENANCE OF LIGHTING SYSTEM, LT LINES OF COLONY AND SUBSTATION FOR ONE YEAR AT 220 KV SUB-STATION SAHUPURI UNDER ETD-III, SAHUPURI
Replacement of 33 KV/11KV/LT lines pole line, cable etc. damaged due to various reasons Deviya Aapda and restoration of supply under EDD-II, Aligarh.
Replacement of 33 KV/11KV/LT lines pole line, cable etc. damaged due to various reasons Deviya Aapda and restoration of supply under EDD-I, Aligarh.
work of Repairing of LT/HT Line of 11 KV Chandpur feeder Chandpur to Rudrain luine under EDD-Mahmoodabad, Sitapur
LT LINE LED STREET LIGHT 2 NO 16 MTR HIGH MAST DIFRENS BUILDING 1 NO HIGH MAST REPAIR TOILED BLOCK ETC
work of installing LT and HT lines on the side of the road in the widening of khailiya Rivada Marg (Ahmedgarh) in the Jurisdication of EDD- Shikarpur, Bulandshahr
Work of removal/maintenance/repair of sudden power interruption in LT/HT lines under 33/11KV Sakaldiha, Chahaniya, Bhupoli, Marufpur under EDD-IIIrd, Sakaldiha, EDSD-IInd, Bhupoli area.
Rectification of 04 nos Chimney at Tower Location no. 218/1 in Ganga River Crossing at 765 KV S/C Anpara-Jhunsi Transmission Line.
work for shiffting of overhead and under ground 11 KV Line at railway crossing Nathupur Lt Line Malahani, Jaunpur
DESTRINGING, CHECK SURVEY, DISMANTLING OF TOWER, CASTING OF FOUNDATION, ERECTION OF TOWER,STRINGING OF EARTHWIRE AND EARTING ETC.
DESTRINGING, CHECK SURVEY, DISMANTLING OF TOWER CASTING OF FOUNDATION,ERECTION OF TOWER,STRINGING OF EARTHWIRE AND EARTING ETC
PROVIDING STRINGING OF MOOSE CONDUCTOR WITH ITS FITTINGS AND ACCESSORIES FOR POWER SUPPLY OF I P NO 2
Diversion and stringing of new lighting line as mentioned in the Notice Inviting Tender (NIT) at Bina Project
Erection of LT and HT Line and Replacement of Old Conductor and AB Cable under (20 Cr. per District Scheme)
Construction of 132KV SC TRANSMISSION LINE FROM 132KV SIDHAULI TO 132KV S/S MAHMOODABAD LINE (01KM), STRIGING OF IIND CIRCUIT OF 132KV SIDHAULI-MAHMOODABAD LINE UNDER ETD SITAPUR
LAYING OF CONCRETE SLAB BETBEEN GAS PIPE LINE AND 400KV SAMBHAL BADAUN TRANSMISSION LINE FOR PROTECTION OF GAS PIPE LINE FROM PHYSICAL DAMAGE UNDER ETD SAMBHAL
Construction of Well Foundation for 220 K.V. Sohawal-Gonda double circuit Transmission line at Ghaghra river near village aliparsauli district Gonda at Location no 20/10
Construction of Well Foundation for 220 K.V. Sohawal-Gonda double circuit Transmission line at Ghaghra river near village aliparsauli district Gonda at Location no 20/11
WORK OF FABRICATION , PROVIDING AND FIXING OF DANGER PLATE , NUMBER PLATE AND PHASE PLATE AT 400 KV AZAMGARH-MOTIRAM ADDA TRANSMISSION LINE UNDER ETD-II , GORAKHPUR
Diversion of 220 KV Gorakhpur(PG) - Bansi D/C Transmission line between location No. 09 to 14 under Electricity Transmission Division-II, Basti H.Q. at Siddharthnagar
Construction of Well Foundation for 220 K.V. Sohawal-Gonda double circuit Transmission line at Ghaghra river near village aliparsauli district Gonda at Location no 20/12
Custom Bid for Services - Replacement of Porcelain insulators with Polymer insulator in 400KV Dc Quad Motihari Gorakhpur Transmission line under Gorakhpur TLM at POWERGRID NRIII Region
PROVN OF 200 KVA TRANSFORMER WITH TRANSMISSION LINE FOR THE ENHANCED POWER REQUIREMENT OF RNLDC AT COMN COMPLEX, HQ CENTRAL COMD UNDER GE (E/M) LUCKNOW
Periodic (Bi-Monthly Quarterly) Routine/Emergency Patrolling and Periodic Cutting/Lopping and Chopping of Trees in Line Corridor of 132KV Transmission Lines alongwith other associated Works under E.T.D.-II, Bareilly w.e.f. 01.03.2021 to 30.06.2021
Monthly Routine/Emergency Patrolling and periodic Cutting of trees in Line corridor and routine general/normal preventive and Breakdown maintenance of various 132KV Transmission Lines under E.T.D., Budaun during the Period of 1 Year
Monthly Routine/Emergency Patrolling and periodic Cutting of trees in Line corridor and routine general/normal preventive and Breakdown maintenance of various 132KV Transmission Lines under E.T.D., Budaun during the Period of 1 Year
Monthly Routine/Emergency Patrolling and periodic Cutting of trees in Line corridor and routine general/normal preventive and Breakdown maintenance of various 220KV Transmission Lines under E.T.D., Budaun during the Period of 1 Year
Periodic (Bi-Monthly/Quarterly) Routine/Emergency Patrolling and Periodic Cutting/Lopping and Chopping of Trees in Line Corridor of 220KV Transmission Lines alongwith other associated Works under E.T.D.-II, Bareilly w.e.f. 01.03.2021 to 30.06.2021
Repairing of LT Line, High Mast 02No. Pole Painting and Solar Street Light etc. work at NMY Lalganj, Raibareli.
Construction of LT Line and Internal Electrification in C Type shop 15 nos. at NMY Shivraj Pur, Chaubepur Kanpur.
Maintenance work of HT/LT line in the area of E.E. (Tech.), Muzaffarnagar on the basis of running contract
Work of construction of LT line under Business Plan Year 2024-25 Phase-2 under Electricity Distribution Division Khalilabad.
MAINTENANCE AND REPAIRING WORK OF HT/LT LINE DUE TO HEAVY STROM OF ALL DIVISION BALLIA UNDER EDC BALLIA
Maintenance work of HT/LT line in the area of E.E. (Tech.), Muzaffarnagar on the basis of running contract
Earthing test of HT/LT line poles inside colony area with providing earthing and safety works, HTPS, Kasimpur, Aligarh.
WORK OF TIGHTENING SAGGING OF CONDUCTOR OF LT LINE OF 132KV SUB-STATION MOHADDIPUR OLD UNDER ETD-I, GORAKHPUR
Maintenance work of HT/LT line in the area of E.E. (Tech.), Muzaffarnagar on the basis of running contract
Shifting of 11KV and LT Line and Providing LT Distribution System infront of Bhrimputra Shopping complex, sector-29,. Noida
INCREASING CAPACITY OF TRANSFORMER AND CONSTRUCTION OF HT AND LT LINE IN BUSINESS PLAN UNDER EDD-IV, SYANA BULANDSHAHR.