Loading…
Loading…
2,645 results • Best match
White washing of travelling roadways and haulage roadways in 7 and 8 incline and 4,5, and 6 incline of Dhori Khas colliery of Dhori Area.(underground work)
Complete repairing and rewinding of starter and rotor of slipring haulage motor of 150HP , make - kirloskar, SI.No.-MHP/SL/01,550V,960RPM at Maheshpur colliery under Govindpur Area
LOADING, UNLOADING AND TRANSPORTATION OF ORE AND CONCENTRATE OF MOSABANI PLANT
LOADING, UNLOADING AND TRANSPORTATION OF ORE FROM KENDADIH MINES TO MOSABANI
Limited Tender Enquiry for Transportation of ore lying at Surda Mine
Vendor Empanelment of Firms/Agencies/Companies for Transportation of Repaired DTRs
Work of regular Watching/Patrolling of 400 kV D/C QM Latehar-Chandwa Transmission Line w.e.f. 01/08/2025 to 31/03/2026 along with transportation of mandatory spare materials of 400 kV Chandwa-ESSAR D/C Transmission line from GIS Chandwa (PGCIL) to 40
Dismantling of one pony belt and transportation of pony belt structure and 450mt 1200mm belt structure from D-18 TG to old D-18 TG from 9th dip between 9th and 8th dip in XVI(T) seam 500MH in Moonidih colliery, W J Area
Power rearrangement of 6.6KV for longwall and belt circuit in bottom seam,transportation of faulty TSUs and longwall SF6 breaker to surface and placing of repaired TSUs in bottom seam, and cable rearrangement and laying between 8thdip S/S to DR 3 S/S
Dismantling 30 lbs track-line (370mt)from D-16 BG to D-18 BG along 7th rise in XVI(T) seam,floor cleaning, transportation of 400mt, 60lbs rail from different places and laying-fitting the same along 7th rise at dismantalled place XVI(T) seam
Different type jobs such as cleaning fallen stone/debris from 2nd level of 6th dip in XVI(B) seam, transportation of girders , legpost , 4 and 2 MS pipes from 8th dip/500MH mainline Jn. to 2ndlevel/6th dip junction of XVI (B) seam at Moonidih
Custom Bid for Services - Hiring of 01 one no of 7 seater vehicle Scorpio or Bolero or equivalent having taxi permit with driver for transportation of Geologists and staff with field items from camp to survey area and drill site at RG Camp Narwapaha..
Loading and Transportation of 4.5 Lakh Te of blasted coal from Pit Head stock No. 42 of Ashok OCP to Rajdhar Siding via Weighbridge No. 6, new Check Post Ashok, BKB Mobile Crusher, 1002 belt conveyor and old pit office Piparwar Project for 75 days.
Hiring of HEMM for Removal of 33.77 Lakh Cu.M. OB, Re-handling of 78.65 Lakh Cu.M. OB, Extraction and Transportation of 23.77 Lakh Te coal from Ashok OCP to RCM siding, Rajdhar siding and CHP/CPP under Piparwar Area for a period of 15 months
Extraction/laying, loading and transportation of new 11KV Al 240sqmm PVC Cable and laying same at under-pass of DC railway line near Parwabhita,as well as supply and fitting of 240sqmm Heat shrinkable outdoor cable kit along with diversion of O/H Lin
Extraction/laying, loading and transportation of new 11KV Al 240sqmm PVC cable and laying same at under-pass of DC railway line near Parwabhita as well as supply and fitting of 240sqmm Heat Shrinkable outdoor cable kit along with diversion of O/H lin
Transportation of 450.00m 1200 mm structure of TC-7 Rise Belt TC-8 M-1 belt from 8th dip and surface and laying at 6th rise and dip gallery near 6th rise Bunker, XVI Top Seam-500 MH at Moonidih Colliery W J Area
Hiring of two (02) nos. of Non-AC road vehicles (Tata Sumo/Bolero or similar) for transportation of crew and guard with their belongings from BUF to BXF/PSJ as well as any station & back when and where required round the clock for 730 days.
Crushing, loading and transportation of 105 L Te coal from Rajmahal Coal Stockyard to Rajmahal Wharf Wall Siding including loading of coal into Railway wagons with allied work lead range of 1 to 2 Km for the period of three years at Rajmahal AreaECL
Repairing/welding work on the cracked portion of the turret structure (upper carriage) of EKG5A Shovel SI No. HMB 560 CIL No. EXC 2640.
Carriage of spillaged coal from the weigh bridge pit, pit drain and surrounding areas of raw coal road weigh bridge under Rajrappa Washery Project
Carriage of spillaged coal / debris from the weigh bridge pit, pit drain and surrounding areas of road sale weigh bridge under Rajrppa Washery Project
BEARING RLLR, 22222CK, SPHRCL, DBL, 110MM, N321C3, CYLNDRCL, SNGL, 105MM, PEDESTAL, For COAL TUB, BEVEL PULLEY, CI, 5IN, 7.355IN, RPE 22MM, D LINK, For COAL TUB 45CFT, CHAIN, COAL TUB COUPLING, C TYPE, 32MM, THMBL ROPE, ROPE CAPEL, 19MM, With Zinc CONE, CONE, Zn, With CAPEL 19 MM, 22MM, ZINC CONE, TAIL, CABLE Jointing Kit, 50MM2, CU, 1.1KV, 3.5X4C
Bamboo fencing along the transportation road at SLG siding under Govindpur Area
Construction of Diversion Road for Existing Coal Transportation Road from WB 2 to check dam and Strengthening of Existing Coal Transportation road
Complete Repairing/New change of worm wheel and worm shaft for endless haulage gear box, size U-1200 of Moonidih Workshop, WJArea. Sl. No. CWS/U-1200/01
Replacement of bronze bush and dismantling, erection of wagon haulage drum, pillow block, and counter weight in wagon system at Madhuban Coal Washery under Block-II Area, BCCL.
Complete rewinding and repairing of 112KW 150HP 980 RPM FLP slipring Induction surface haulage Motor Make Crompton Greaves of Bhowra North Colliery UG Mines under E. J. Area
Casting machining and fitting of Ist motion 2nd motion and 17 teeth spur pinion of 110KW Hind wheel make haulage surface of 23.8 incline of Bhowra North colliery.
Replacement of damage pinion primary shaft of wagon haulage system and making of spare primary shaft new pinion, bronze bush at Loading section at Madhuban Coal washery under
Roof bolting in previously developed galleries (for travelling roadway, haulage roadway) of the new working district of 2 and 7 no inc. (GP Seam) at Shampur-B Colliery.
Dismantling, repairing, rectification, overhauling works of main drive gear box assembly, MAMC make for 65KW direct haulage in respect of 4, 5, 6 incline of Dhori (K) Colliery
for erection of Chemical earth pit -06 sets at colony substation and near Sawang C haulage room -06 sets and laying of G.I strip25mmX5mm( qty120mtrs)at Govindpur Project
Shifting of ACB switch,Gate end box,trailing cable, radiant, drill pannel,motor pumps,tugger haulage etc. at 4/5/6 and 7/8 incline of Dhori (K)
Complete repair of 65KW / 90 HP, 550 Volt, 740 RPM, slip ring motor, Shaktimaan Make, Direct Haulage kept in breakdown condition at 7/8 incline, Dhori (K) Colliery
Complete Repairing and Rewinding of stator and rotor of 150HP, Kirloskar make, 550V, 960RPM, Slipring Haulage motor Sl. No. MHP/SL/03 at Maheshpur Colliery under Govindpur Area
Repairing of OCB switch of make Kilburn,180A,550V,Type SD-15,Si.no.8055 of haulage room of 2 seam surface of new Akashkinaree Colliery under Govindpur Area
CASTING AND MACHINING OF CI COUPLING OF SIZE 12INCH AND 14INCH (2 NOS. EACH) FOR 3 SEAM AND 5 SEAM SURFACE HAULAGE OF SALANPUR COLLIERY UNDER KATRAS ARERA.
Dismantling and repairing of counter weight 02 nos. Pulley and wagon Haulage roup pulley 02 nos. At Loading section of Madhuban Coal Washery under Block-II Area, BCCL.
Custom Bid for Services - Hiring of Truck having 6 wheels and minimum payload capacity of 10 Ton Similar Category Goods Transportation service - Monthly Based Service Goods Transportation service - Monthly Based Service Goods Transportation service - Monthly Based Service
LOADING UNLOADING AND TRANSPORTATION OF ORE FROM BACKYARD TO CRUSHER STOCK FILE
Transportation of Ore from stock yard of Banduhurang Mines to Jaduguda Mill
Restoration of Kusumba Bypass Road used for coal transportation
Dismantling 300mt(50nos) 6 I MS pipe LHD-4 dip, transportation of 300mt(50nos) 6i MS pipes from surface to pit bottom and pit bottom to Assambly st. carrying manually upto a dist. of 150mt, hanging laying and fitting 600mt,100 nos. MS pipes 3rd dip P
Transportation of coal from 36 No. Coal Dump to Mobile Crusher no. 3A, 4A and 5A of Sijua Rly. Siding and from discharge end of Mobile crusher no. 3A, 4A and 5A of Sijua Rly. Siding under Katras Area to Lakarka and Sijua Siding including allied jobs
Transportation of Coal by mechanical means from Coal Heap No. 1 of Patch C, NGKC to KDS-K Railway Siding via 03 pit CHP/KDS-K Railway Siding CHP Hopper and loading of wagons at KDS-K Railway Siding including allied jobs at Kusunda Area of BCCL
Loading and Transportation of Coal by mechanical means from Coal Heap No. 1 of Patch C, NGKC to KDS-K Siding via 03 pit CHP/KDS-K Railway Siding CHP Hopper and loading of wagons at KDS-K Siding including allied jobs at Kusunda Area of BCCL
Loading, Crushing and Transportation of 70 Lakh Te coal from proposed pit head stock of M/s PLR and Departmental Pit head stock of Ashok Project to CHP/CPP, Piparwar, Rajdhar Siding and RCM Siding Under Piparwar Area for a period of 3 yrs and 4 month
Laying of pipe lines 02 ranges each 8 dia and 10 dia of length (2x450 mtr 8dia and 2x450 mtr 10 dia pipe line) from Pumping station at Patch A to existing laid pipe ranges near high wall at patch A area in Ashok OCP.(Transportation of
excavation an transportation of WPC from Pond No 01 Pond No 02 Washery Complex and around Pond No 01 and Pond No. 02 and Payloader loading at 1 No Siding to Siding No. 05, Sudamdih and loading into railway wagons at 5 No siding under SOR 2021