Loading…
Loading…
1,455 results • Best match
Online UPS
Online UPS
Online UPS, Online UPS Bidder Turnover (Last 3 Years) 55 Lakh (s)
Online UPS, Online UPS Average Turnover (Last 3 Years) 4 Lakh (s)
Provision of Miscellaneous Electrical Work Like EPABX, UPS Battery Bank, Cables, Fire Extinguishers, BMS, Access Control System and Digital Water Level Controller System at MSME Sitarganj
Buy Back - Lead Acid Batteries for Motor Vehicles with Light Weight and High Cranking Performance (V2) (Q3)
Buy Back - Lead Acid Batteries for Motor Vehicles with Light Weight and High Cranking Performance (V2) (Q3)
Buy Back - Lead acid batteries for Motor Vehicles With Light Weight and High Cranking Performance ( PAC Only )
2 VOLT 600 AH GEL TYPE VRLA BATTERIES WITH BUY BACK
SITC of SMF VRLA batteries under buyback at CNS sites at
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6403207 Dated : 03-07-2025 Bid Document 1/6 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Comprehensive Annual Maintenance Contract for 2 X 20 KVA UPS System at Reserve Bank of India, Plot No. 16 & 17, IT Park, Dehradun
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6833044 Dated : 28-10-2025 Bid Document 1/5 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Bid Details EMD Detail Required No ePBG Detail Required No
Supply Erection and Commissioning of 110V 300AH Lead Acid Battery Set at 132KV Substation Purkul Dehradun
10 KVA Online UPS with Battery and 20 KVA Online UPS with Battery
Supply, Installation, Testing Commissioning (SITC) of SMF VRLA Batteries under buyback scheme
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6412315 Dated : 03-07-2025 Bid Document 1/6 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
SITC of 2V, 600 AH, VRLA, SMF Battery Bank used for 160 kVA UPS alongwith buyback of old SMF cells
Online UPS (V2) (Q2)
Online UPS (V2) (Q2)
Online UPS (V2) (Q2)
Online UPS (V2) (Q2)
Online UPS (V2) (Q2)
Online UPS (V2) (Q2)
Online UPS (V2) (Q2)
Online UPS (V2) (Q2)
Online UPS (V2) (Q2)
Online UPS (V2) (Q2)
Online UPS (V2) (Q2)
different rating online UPS
Online UPS (V2) (Q2)
Online UPS (V2) (Q2)
1 KVA Online UPS
ONLINE UPS 1 KVA
Online UPS ( PAC Only )