Loading…
Loading…
1,459 results • Best match
Daikin Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), Daikin Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
IFB Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), IFB Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
LLOYD Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), LLOYD Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Voltas Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39), Voltas Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
godrej Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), godrej Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
ONIDA Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39), ONIDA Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
SITC of 5-star, inverter technology-based window AC, including required minor civil and electrical work at Plot No. 20, Knowledge Park-2, Greater Noida Extension Center (GNEC), campus of IIT Roorkee, Greater Noida
Online Ups Modular Type (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6568260 Dated : 01-09-2025 Bid Document 1/14 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority CONCERNED ONGC QUALITY ASSURANCE DEPARTMENT Auto CRAC Days 60 Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 31280 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 2.00 ( ) Duration of ePBG required (Months). 38 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be 2/14 in favour of Beneficiary, wherever it is applicable. Beneficiary : ONGC Shared Financial Services ONGC, Shared Service Center, 1st Floor, IBM office, Sector 62, Noida-201309, Uttar Pradesh (Shared Financial Services) Splitting
Television TV, Layer 2 Access Switch, Fibre Cable for Networking, telecommunication cable, Online Ups-IS:9000, megha phone - loud hailer, hand held metal detector - security metal detector
HDMI Cable 20 Mtr, VGA Cable 20 Mtr, Tarpin Oil, Dashboard Camera, Inverter Singal Bty, Inverter Double Bty
HDMI Cable 20 Mtr, VGA Cable 20 Mtr, Tarpin Oil, Dashboard Camera, Inverter Singal Bty, Inverter Double Bty
STABILIZER (Q3), INVERTER AIR CONDITIONER (Q3)
Desktop PC, Server, Digital Inlight Projection System, 24 Port L2 Switch, Media Converter, 10 KVA UPS, RJ45 Connector, UTP Cable CAT 6, NAS 8TB
Replacement of Battery Bank and Renovation of Control Room at 33/11 KV S/s Sector-03 and Secotor-04, SIDCUL under EDD-I, Rudrapur
External Hard Disk 1 TB, TFT 18.5, UPS Battery Exide, UPS 600 VA, Key Board And Mouse, Adaptor 19 V 3.42 A 65 W
BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to, BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to, BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
AKABISHI Cooling Only 1.8 Ton 2 Star (ISEER value from 3.5 to 3.79), AKABISHI Cooling Only 1.8 Ton 2 Star (ISEER value from 3.5 to 3.79) Non-Inverter AC - Fixed Speed Wall Mount Split AC
BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to, BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to, BLUE STAR Cooling & Heating 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
High End Desktop Computer (Q2), Multimedia Projector (MMP) (Q2), Online UPS (V2) (Q2), Line Interactive UPS with AVR (V2) (Q2), PLC based fire alarm system (Q3) (3 (3 ))
Professional Large Format Display (Q2), Online UPS (V2) (Q2), HDPE Pipe, PVC Pipe, Automatic Boom Barrier including all accessories with compplete installation, Camera Gang Box, RJ45 STP Connector
High End Desktop Computer (Q2), All in One PC (Q2), Line Interactive UPS with AVR (V2) (Q2), Online UPS (V2) (Q2), Cat 6 Cable for Indoor Use (Q2)
All in One PC, Video Conferencing Camera, Online UPS, PA Speaker, Visual Presenters, Micro PC (MPC), Professional Large Format Display Bidder Turnover (Last 3 Years) 13 Lakh (s)
interactive panels and accessories, Online Ups-IS:9000, Electronic Lectern, Video Conferencing Camera, Micro PC (MPC), Video Conferencing Media Encoder Bidder Turnover (Last 3 Years) 32 Lakh (s)
BLUE STAR Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
godrej Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-, godrej Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
BLUE STAR Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling & Heating 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
godrej Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-, godrej Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
godrej Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-, godrej Cooling Only 1.5 Ton 3 Star (ISEER value from 3.8 to 4.39) Non-Inverter AC - Fixed Speed Wall Mount Split AC
BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39), BLUE STAR Cooling Only 2 Ton 3 Star (ISEER value from 3.8 to 4.39) Inverter AC - Variable Speed Wall Mount Split AC
Supply Installation Testing and Commissioning of 5- star, inverter technology-based window AC, including required minor civil and electrical work at Plot No. 20, Knowledge Park-2, Greater Noida Extension Center (GNEC), campus of IIT Roorkee
Router, Sd Card, Card Reader, OTG, Battery for Camera, A3 Paper, Keyboard and mouse, UPS Battery, Internal DVD writer, maintenance Box, Electric Blower, Smart Router
PTZ CCTV Camera, Bullet Camera, 43 inch Smart UHD LED Display TV, Fiber Optics Cable, CCTV Cat 6 Cable, BPE 3 KVA Online UPS, Online UPS 5 KVA, Power Supply with Backup UPS, Switch 24 Port, Switch 8 Port, 32 Ch H 265 4K Network Video Recorder, 4 TB Hard Disk, Portable Hard Disk 8TB, Cat 6 Patch Cord Patch Cords, Media Convertor, PoE Injecotor
Real Time PCR, One Data Analysis System with i5 processer, 2KVA Online UPS, A high Quality Working Bench, A high Quality Working Chair, 1.5 ton Split AC dual purpose
Desktop PC Core i7/14th Gen/16GB RAM/512GB SSD Monitor 21.5"/Window 11 Pro/MS Office/3 Year W, Mono MFM, Visualiser, 1 KVA UPS
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 5, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6899701 Dated : 21-11-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Routine maintenance and operation of various E and M installation services at President Estate Ashiyana Dehradun Subwork/Packages: Comprehensive annual maintenance of Emerson Make 40 KVA UPS
routine maintenance and operation of various e and m installation/services at president estate ashiyana dehradun Subwork/Packages: comprehensive annual maintenance of emerson make 40 kva ups
KYOCERA MFD TAFLON, KYOCERA FIXING PAD, KYOCERA PICKUP ROLLER, KYOCERA PICKUP ASSY, 10 KVA UPS CHARGING CIRCUIT, CANON PRINTER INK CARTRIDGE ASSY, KYOCERA MFD DRUM 2040, CLEALING BLADE
Okay Battery 180 AM, Microtek Inverter, Chair, Photopaper, Helmet
SSD, RAM 16 GB DDR 4, GRAPHIC CARD, HARD DISK DRIVE 1 TB, MOTHERBOARD, UPS 1 KVA, FUSER ASSY, RAM 8 GB DDR 5, ADOPTER, UPS BATTERY, CMOS BATTERY
DESKTOP PC i7, VISUALIZER, PROJECTION SYS PROJECTOR AND SCREEN, NETWORKING SWITCHING CONTROL EQPT SWITCHER, PODIUM WITH INTEGRATED CONT AND ANNOTATION, BIOMETRIC SYSTEM, MOB JAMMER, CCTV SYSTEM, FIRE ALARM SYSTEM, ONLINE UPS 5 KVA
Waist Ink Pad, Bty Dry 12V 7AH, Printer Gear Set, Microteck 1 KVA UPS, Bty Dry 12V 5AH, Keyboard with Mouse, PickupRoller, Laptop Battery, Monitor 18.5 Inch, Drum Unit L2640DW
Online UPS (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/5971263 Dated : 19-02-2025 Bid Document 1/8 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 19520 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 31 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : Director DGRE PLOT NO 01 SECTOR 37 CHANDIGARH, Department of Defence Research & Development, Office of DG (ACE), Ministry of Defence (The Director, Dgre, Chandigarh) MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 2/8 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Water Camper5 Ltr, Electric Induction, Ketli Milton 1 Ltr, Oil Bhatti, Pressure stove 3 No, Pressure stove 10 No, Burner Kit, PC i5 8GB RAM, Dot Matrix Printer, 1 KVA UPS
Repair of Printer M 203 DN, Repair of UPS 650 VA, Repair of Microtek UPS1000VA 600W, Repair of Epson Colour 3110 Printer, Repair of Printer HP 1020, Repair of 1 KVA UPS