Loading…
Loading…
8,711 results • Best match
TTPS Mech II TM I Unit I II III Removal and Re fixing of wool mattress or Cera blanket insulation of Turbine Casing and their allied pipe lines valves and HP Heaters for the period from 01 04 2024 to 31 03 2025
MTPS I TM Unit III Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 3 4 GC 1 Changing the defective valves ES 3 etc
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2024 to 31 03 2025
TTPS Mech II TM I Overhaul Work 2019 20 Unit II Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from 01 04 2023 to 31 03 2024
e TENDER FOR REMOVAL OF EXISTING 5 NOS. ACTUATORS, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 5 NOS. NEW FLAME PROOF ELECTRICAL ACTUATORS COMPATIBLE WITH EXISTING 16 INCH DIA. GATE VALVES AND CONTROL PANEL AT BD III IN OIL DOCK OF CHENNAI PO
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
MTPS1 TM Stage II Unit III IV Overhauling and Load testing of 2 ton capacity EOT crane movable 1 ton chain block trolleys and 1 TON Capacity Electrical Hoists in pumps Compressor and LP Bypass valves area for the year 2025 2026
TTPS Mech II TM I Unit I Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and renewal of gaskets
MTPS TM Unit II Cleaning and painting of inner and Outer portion of Receiver Tanks of 1 2 for Instrument Air and renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks Overhauling of Silica gel type Air drier
TTPS Mech II BM Unit IV Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during 2021 2022 overhaul
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
TTPS MechII AHP UnitI II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period from 01 04 2026 to 31 03 2027
NCTPS I Operation CA CWPH Unit III Overhauling of Cooling water Pumps 3A 3B 3C and its Fore bay BHEL Make Model CW1Q Vertical pump Capacity 16500 metre cube per hr per pump respective Discharge side Butterfly Valves Size1600 NB Cleaning of res
NCTPS I Operation CA CWPH Unit I Overhauling of Cooling water Pumps 1A 1B 1C and its Fore bay BHEL Make Model CW1Q Vertical pump Capacity 16500 metre cube per hour per pump respective Discharge side Butterfly Valves Size1600 NB Cleaning of res
WELCOME MAINTENANCE TO MD ACCN AND DAY TO DAY MAINTENANCE TO MD ACCN, OTM ACCN AND TECH BLDGS AND REPAIR/ MAINT TO SERVICE WATER TANK, CLEANING OF TANKS PIPE LINES FLOAT VALVES AND PERIODICAL SERVICES AND WEATHER PROOFING PAINTING TO OTM ACCN, MESSES
NCTPS I M II Circle AHP Unit II O/H Works 2022 2023 Overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of Ash water tank Ash slurry Sump etc in Ash Handling pump House
TTPS Mech II TM I Unit III Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and renewal of gaskets
TTPS Mech II AHP Unit I II III Breakdown work in Ash Slurry pump House equipments Overhauling of Ash slurry pump seal water pump and Suction Delivery valves for the period of work on or after 08 10 2019 and upto 31 032020
TTPS Mech II TM I Unit I II III Removal and Re fixing of wool mattress or Cera blanket insulation of Turbine Casing and their allied pipe lines valves and HP Heaters for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM II ACP Reconditioning of cooling Tower C by replacing of fills, drift eliminators, spray header pipes, Overhauling of 200 NB 150 NB gate valves, Eroded discharge reducer pipe lines at Unit IV V AC Plant cooling tower etc
TTPS ES MRT I A Preventive Maintenance works of Boiler side valves Damper actuators control panels in plant and plant auxiliaries area pertaining to Sub Dn I of MRT I in Units I II and III for the period from 01042024 to 31032025
MTPSI Mill Plant Unit I Hard facing of MS bend Multiple port outlets in coal flow lines Dismantling reconditioning overhauling and assembling of dia 250mm butterfly valves in mills seal air fan damper assembly of size dia 650mm in the seal air system
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2024 to 31 03 2025.
TTPS Mech II TM I Overhaul Work 2019 20 Unit I Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2024 to 31 03 2025
MTPSI TM Unit II Cleaning and painting of inner and Outer portion of Receiver Tanks of 1 2 for Instrument Air and renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks Overhauling of Silica gel type Air drier accessories
NCTPS I Operation Circle CA Dn DM Plant Dismantling the existing damaged 150 NB 125 NB 50NB and 40NB MSRL Spool pieces bends Tee Pieces with flanges and Diaphragm valves Fabrication and Erection of new MSRL pipes and fitting and Overhauling of diaph
Operation of pump, valves for supply of construction water to Ennore SEZ STPP site from Ennore SEZ STPP pump room located in the NCTPS II premises for the period of six month from the date of commencement including attending leakages/damages in pipe
Operation of pump and valves for supply of construction water to Ennore SEZ STPP site from Ennore SEZ STPP pump room located in the NCTPS II premises for six month from the date of commencement including attending leakages/damages in the pipe line
NCTPS II 2 600 MW Operation circle O E Division Time bound works in various operation locations of Unit II CWPH and RW FW pump house Monitoring of local parameters on regular intervals operation of manual valves dampers for a period of 1
NCTPS Stage II 2 600 MW Operation circle O E Division Time bound works in various operation locations of Unit I FOPH Switch yard Monitoring of local parameters on regular intervals Operation of manual valves dampers for a period of 180 days
TTPS MechII AHP Dismantling and re-erection of Chute cum adopter 200NB 300NB knife edge gate valves expansion bellow spool piece with poke hole arrangement MS sleeve top spool piece flushing apparatus and its sea water pipe lines in 1st row of Un
Safe Supply and delivery of CF35 X KF25 bellow seal angle valve as per attached Specification., Safe supply and delivery of SS304 Nuts and bolts M6X 40mm length with ring and plain washer., Safe supply and delivery of SS304 Nuts and bolts M6X 35mm length with ring and plain washer., Safe supply and delivery of Aluminium clamp with centering ring Vinton O-ring for ultra vacuum level
LV7/TATA 000-544-0068J MAP READING LAMP, LV7/TATA 1467-414-475 SOLENOID OPERATED VALVE, LV7/TATA 17672-03-000 FILTER FUEL, LV7/TATA 2069- 5010- 5834 RUBBER HOSE, LV7/MARUTI 33100-83022 DISTRIBUTOR ASSY, LV7/TATA 280943700130 TRAILER CONTROL VALVE VOSS, LV7/TATA 2912-8711-7034 RESERVOIR VISO F 27/4, LV7/T-815 443-311-807-109 WATER PROOF HEAD LAMP ASSY DIA 160 MM, LV7/TATA 2520-012551 PROPELLER SHAFT, LV7/TATA 2154-4290-0131 ASSY PIPE (TO AIR GAUGE I)
SUBJECT: AMC FOR L&T VALVES MAKE PNEUMATIC ROSOVS AT IRUGUR TOP INST. UNDER CRFQ NO. 1000395124 DT. 29.10.2022 Kindly quote you lowest rate per unit against each item in figures as well in words and your rates are valid for a period of 120 days upto 30.01.2023.After successful completion of contract period ,Repeat order shall be placed on mutual agreement. The quoted amount shall inclusive of all rates, taxes and duties but excluding Goods & Service tax will be paid extra as per prevailing rates and policy /rules and regulations. Kindly note that this is an e- tender and bids have to be submitted only online. Your offer is liable to be rejected if there is any deviation from terms and conditions and special conditions of the said tender. Following five documents are uploaded as tender documents. You are requested to sign all documents digitally and upload all documents in the tender without any corrections. Please note that even if a single document is missed while digitally signing uploading; the bid is tantamount to reject. Conditional bids will also be liable for rejection .No changes shall be made in the tender documents and it should be digitally signed and uploaded as it is. Tender Documents 1. Tender Covering Letter.2. GPC&GCC 3. Bid Security Declaration 4.Holiday Listing of vendors During the technical evaluation above parameter of successful digital signing and uploading of tender documents will be checked. Your offer digitally signed on all pages of bid and attached tender documents files should be signed digitally and uploaded in the e- procurement portal of BPCL on or before 14.11.2022@ 1600 Hrs. BPCL will not be held responsible for any delays due to connectivity issues etc. The rates should be quoted for the specifications mentioned in the tender only and no deviation will be entertained . Any deviation found in the bid; same will be liable for disqualification. You may kindly contact us if in case you need any clarifications before submitting the your offer. The Details of the Contact person is as follows Name –Mr. Susen Murmu, Manager (Ops) ,Irugur TOP Installation Ph: 7022462369 Email ID: [email protected]
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3), Online UPS (V2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience ... Stationary Valve Regulated ...
BASE GASKET FOR MAGNET VALVE for E.P. Contactor & Reverser for locos Spec/Drg No- as per CLW Drg.No. 4.TWD.111.020 alt-5. and CLW Specn. No- 4TES.111.024, Alt-Nil
Rectification of service seal struck up in spherical valve MIV reassembling with new DType seals and O rings reassembling the dismantling joints and recommissioning of Unit II at Kadamparai Power House
NCTPS I Operation Circle CA Dn CWPH Renewal of worn out deteriorated Discharge line Air Relief Valve platform including cost of Material and Consumables and hire charge for T and Ps
GENERAL FUND 2025-2026 Supply of Labour For Engaging Valve Operating and Night Watchmen Duty OHT and GLR at Ward No21 Lower Camp and palyankudi for Water Supply in Gudalur Municipality
Kit combined disc valve for RR20100 compressor as per ELGI Pt.No: 022400989. Kit consists of 8 items as per annexure enclosed. Note: Firm should submit authorised dealership certificate along with ten
2/2 way, Normally closed, Direct Operated diaphragm design, brass body solenoid valve with NBR seating material for gas application, Model no : 21HF6KB250_UDV, Size: 1 inch BSP Female, Orifice: 25 mm
AOH KIT FOR ROTEX MAKE 3282 MAGNET VALVE .KIT CONSISTS OF 9 ITEMS AS PER ANNEXURE ENCLOSED. Firms' offer: Same as above, Make/Brand: ROTEX, Model No: 98-AOH KIT-3282
PROTECTIVE STICKER FOR DISTRIBUTOR VALVE AS PER DRG. NO. SR. LW. 4SK-2124, FIRMS OFFER : STICKER WITH GLOSS LAMINATION. note: (SAMPLE PIECE TO BE PROVIDED FOR APPROVAL BEFORE SUPPLY OF MATERIAL )
AIR VENT VALVE (DRG.NO.LG63266 ALT NIL ITEM 3), as per Drawing: M/S. HANS H.VOSS TULPENWEG OR M/S. CALEFI OR M/S. WATTS INDUSTRIES ITALY. Firm's offer:"AS PER TENDER".
SET OF GASKET OF VALVE CHANGING ITEMS FOR 1600 HP DEMU DPC. COMPRESSOR MODEL NO-RR5070. Each set consisting of 08 items. specn: As per Annexure-A. Make -Elgi or Similar
SUPPLY OF VACUUM VALVE G 1/2 (FOR 30L ROOF WATER TANK OF LHB COACHES) TO THE RCF DRAWING NO. LW63150, ITEM 3, ALT E/(LATEST). MAKE/BRAND:"ANY GOOD MAKE"
STUD (FOR DISTRIBUTOR VALVE) M12X80 Conforming IS Material Specification IS:1367 PT-III/ 79, PROPERTY CLASS-4.6 and to SCR Drawing No. S.C.R.C&W SKETCH NO. 1110, Item-1, Alt.-Nil.