Loading…
Loading…
8,711 results • Best match
SUPPLY OF ANGLE VALVE (LEVER TYPE) TO DRG. NO. ICF/STD-6-3-029, ITEM-1,ALT- NIL. Please Visit ICF Vendor Portal For Downloading Drawing https:// vp.icf.gov.in/ vendTendorDetNew.php Using Key 0724dotJP
Hydraulic Proportional flow valve, Model No. PRL500PC10P60, ID Nr.HV07856 Maximum Working Pressure: 320 Bar, Power Supply: 24 V DC, 1.4Amps, QN: 60 lit/Min. Solenoid Coil 24 volts DC. Make: HAWE HOERB
12V,70AH for 110V train lighting system, Valve Regulated Lead Acid (VRLA)Sealed Maintenance Free (SMF) Battery(9 Nos.x12V) as per RDSO Spec. No. RDSO/PE/SPEC/AC/0009-2014 (Rev.'2')
EXIDE Small Sized Valve Regulated Lead Acid Batteries of 12V/17.0 Ah/12P170 with 2 Years Brand: EXIDE (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687746888137 dt
(SR PH CODE-202125) AORTIC VALVE CONDUITS. THE CONDUIT SHOULD BE MADE OF COLLAGEN IMPREGNATED DOUBLE VELLOUR DACRON (HEMA-SHIELD OVEN DOUBLE VELLOR POLYSTER). THE OVERALL LENGTH SHOULD BE AT LEAST 13C
Stationary Valve Regulated Lead Acid (VRLA) Battery of capacity 12V, 200AH. Material container shall be made up of polypropylene co polymer (PPCP). Battery conform to IS 15549/2005 with Amendment 1 an
Hydraulic Power pack system - oil tank 40 litres, Three phase 3 HP electrical motor, working pressure: 250 bar, Pump flow : 3.7 LPM, Control : hand lever valve,radial piston pump, special type manifol
LOCKING NUT FOR MAGNET VALVE (3103C) AS PER DRG. NO: TRS/ACL/P/643. NOTE: ONE SAMPLE TO BE GOT APPROVED BY CONSIGNEE BEFORE EFFECTING BULK SUPPLY. Firm's offer: Same as above
(SR PH CODE - 530133) 100% SILICONE CATHETER 22FR TWO WAY-RUCH- BRILLIANT CATHETER MADE OF SILKOMED (100% SILICONE),22FR, TRANSPARENT, TWO WAY, WITH FUNNEL,VALVE FOR LUER AND LUERLOCK SYRINGE TIPS, ST
SRPH530138-100% SILICONE CATHETER 16FR TWO WAY CATHETER MADE OF SILKOMED (100% SILICONE),16FR, TRANSPARENT, TWO WAY, WITH FUNNEL,VALVE FOR LUER AND LUERLOCK SYRINGE TIPS, STERILE, APPROX 41 CM LONG, T
5/2 push pull spring return valve, designed for pressurised flushing system of LHB CoachMak: Part No: JANATICS-DS254PR60 or SPAC 0011437 or equivalent Firm offered: Any Branded make. Note: Item shoul
5/2 Solenoid Valve with spring offset, port size: 1/4 inch BSP, maximum pressure: 7 bar, operating volt: 24 volt DC, media: Air, Make: FESTO/JANATICS/PNEUMAX/SCHRADERBELLOWS. Offer accepted make:
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Bottom Cover with Quick Release Valve Confirming to Appendix-A1 of RDSO Spec. No. 02-ABR-02, Amendment No.4, to Escorts part No. 202 or Knorr-Bremse Part No. KD-202.
Overhauling Kit for KBI make DV KEdiPKSL to KBI Part No. I.2.765 with Relay Valve RLV11d/ Pressure Converter to KBI Part No. I89770/001, consisting of 82 items for LHB coaches.
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
NCTPS I SE MI circle AOH 25 26 TM Dn Unit III Cutting ReConditioning and Erection of Damaged passing of High pressure Feed Water Suction valves and Extraction 13 valve in Turbine Feed Water System in Unit III during AOH period 2025 26
NCTPS I SE MI Circle AOH 25 26 TM Dn Cutting Re Conditioning and Erection of Damaged passing of High Pressure Feed Water Suction valves and Extraction 13 valve in Turbine Feed Water System in Unit II during Annual Overhaul 2025 26
TTPS Mech II TM I Unit II Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and renewal of gaskets in
TTPS Mech II BM Unit I II III Boiler Inspection checking and opening closing of valves in Deaerator PRDS, Boiler from 18mtr to 52mtr inspecting the rise in slag level through 8 mtr peep hole door and take necessary action for poking opening closing
TTPS Mech II BM Unit I Cleaning of I and II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from 01 04 2023 to 31 03 2024
MTPS I BM Pressure parts Units I and II Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning air washing of Boiler structures and floor and allied works for the period of 120 days from the date of commen
NCTPS I Operation CA Dn Unit II Overhauling of Cooling Water Pumps 2A 2B 2C and its fore bay BHEL Make Model CW1Q Vertical pump Capacity 16500 metre cubic per Hr per pump respective Discharge side Butterfly Valves Sizes 1600 NB Cleaning of respective
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2026 and upto 31 03 2027
TTPS Mech II AHP Unit I II III Breakdown work in Ash Slurry Pump House equipments Overhauling of Ash slurry pump Seal water pump and Suction Delivery valves for the period of work on or after 08 04 2020 and upto 30 09 2020
TTPS Mech II TM I Overhaul 2021 22 Unit III Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers and lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and
TTPS Mech II BM Unit V Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the year
TTPS Mech II TM I Unit I II III Removal and Re fixing of wool mattress or Cera blanket insulation of Turbine Casing and their allied pipe lines valves and HP Heaters from the date of commencement of work and upto 31 03 2022
NCTPS I Operation Circle Chemical Division Collection of water samples and Gas samples from Units I II III in the Chemical laboratory in the PRDS Floor area round the clock and opening and closing of various valves in the RO DM Plant in the Oper
MTPS I Mill Plant Unit II Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills Renewal of the worn out Mill
TTPS Mech II TM I Unit III Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump, working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and renewal of gaskets in
NCTPS I Operation CAD CWPH Attending to leaks and puncture breakdown works at Cooling Water Pump House by welding in the worn out pipes and valves area and painting the corroded pipe lines for the period of six months from the date of taken o
TTPS Mech II TM I Unit I II III Removal and re fixing of wool mattress or cera blanket insulation of Turbine casing and their allied pipe lines valves and HP heaters from the date of commencement of work and upto 30 09 2022
NCTPS I ES Circle MRT Division SDn I II III Fixing Water Wall Soot Blower junction box enclosures Cable gland and Terminal blocks on Water Wall Soot Blower and Fixing of power and control cables gland for Turbine and Boiler side valves for all
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period from 01 04 2024 to 31 03 2025
TTPS Mech II BM Unit V Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the year 2
TTPS ES Circle MRT I Annual Overhauling works in Boiler side Valves Dampers ID FD PA fans lub oil panels and Turbo Generator AC DC Lub Oil and Generator DC Seal Oil AC Seal oil system in Unit II for the year 2025 26
TTPS ES Circle MRT I A Preventive Maintenance works of Boiler Side Valves Damper actuators control panels in plant auxiliaries area pertaining to SUB DN I of MRT I in Units I II and III for the for the period from 08.10.2022 to 31.03.2023
MTPS I Mill Plant Unit I Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills Renewal of the worn out Mill
NCTPS I Operation CA Dn CWPH Unit III Overhauling of Cooling Water Pumps 3A 3B 3C and its fore bay BHEL Make Model CW1Q Vertical pump Capacity 16500m3 Hr per pump respective Discharge side Butterfly Valves Sizes 1600 NB Cleaning of respective -11m d
MTPS I TM I Unit II Inspection and Overhauling of oil vapour extraction fan assembly and renewal of gaskets of Turbine Lub oil line valves NRVs and existing worn out cooling water pipe line of inlet outlet and vent pipes of TLOC SOC AC LOP
MTPS I Mill Plant Unit III Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills Renewal of the worn out Mill
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash, debris etc from Boiler area to debris yard from the date of commencement of work and upto 31 03 2022
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period from 01 04 2023 to 31 03 2024
TTPS Mech II TM I Unit I Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and renewal of gaskets i
TTPS Mech II BM Unit IV Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the year
TTPS Mech II BM Unit IV Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the ye
TTPS MII TM I Unit III Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and renewal of gaskets in BCW
MTPS I TM I Unit IV Inspection and Overhauling of oil vapour extraction fan assembly and renewal of gaskets of Turbine Lub oil line valves NRVs and existing worn out cooling water pipe line of inlet outlet and vent pipes of TLOC SOC AC LOP