Loading…
Loading…
8,711 results • Best match
TTPS Mech II AHP Unit I II III Breakdown work in Ash Slurry Pump House equipments Overhauling of Ash slurry pump Seal water pump and Suction Delivery valves for the period of work on or after 08 04 2021 and upto 30 09 2021
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard from the date of commencement of work and upto 31 03 2022
MTPS I Mill Plant AC Plant Unit III AOH 2025 26 Air Washer System Epoxy painting of blowers and its auxiliaries enamel painting of AWCW Pumps pipe lines Spray nozzles flushing works Overhauling the Blower 3A 3B Damper box AWCW Pumps and gate valves
TTPS Mech II BM Unit IV V Boiler Inspection checking and opening closing of valves in Deaerator PRDS Boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
TTPS Mech II BM Unit I II III Boiler Inspection checking and opening closing of valves in Deaerator PRDS Boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2026 and upto 31 03 2027
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2026 and upto 31 03 2027
TTPS Mech II BM Unit III Cleaning of I and II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from 01 04 2023 to 31 03 2024
NCTPS I Operation Circle CA Dn CWPH Unit I Overhauling of Cooling water Pumps 1A 1B 1C and its Fore bay BHEL Make Model CW1Q Vertical pump Capacity 16500 metre cubic per hr per pump respective Discharge side Butterfly Valves Size 1600 NB Cleani
NCTPS I Operation CA CWPH Unit-II Overhauling of Cooling water Pumps 2A 2B 2C and its Fore bay BHEL Make Model CW1Q Vertical pump Capacity 16500 metre cube per hour per pump respective Discharge side Butterfly Valves Size 1600 NB Cleaning of re
TTPS Mech II AH Unit I II III Breakdown work in Ash Slurry Pump House equipments Overhauling of Ash slurry pump Seal water pump and Suction Delivery valves for the period of work on or after 08 10 2022 and upto 31 03 2023
TTPS Mech II BM Unit IV V Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the y
MTPS I TM UNIT II changing the defective valves of IPT Flange and Stud heating line AS 8 BFP RC 2A by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 and 2 drain line
TTPS Mech II TM I Unit II Overhaul 2021 22 Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers and lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and re
MTPS I Mill Plant Unit I Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills Renewal of the worn out Mill
TTPS Mech II TM I Unit II Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and renewal of gaskets i
TTPS MechII BM Unit IV Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the year 2
TTPS Mech II TM I Overhaul Work 2021 22 Unit I Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and
TTPS M II TM I Unit II Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and renewal of gaskets in BCW
MTPS TM Unit I Cleaning and painting of inner and Outer portion of Receiver Tanks of 1 2 for Instrument Air and Service Air and renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks Overhauling of Silica gel type Air drie
MTPS I BM Pressure parts Units III and IV Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning and air washing of Boiler structures and floor and allied works for the period of 120 days from the date of co
MTPS I M I Circle CA Fire Protection Checking of Deluge valves Cleaning of spray nozzles in Emulsifyre System of GTs UATs MOTs COTs and DOTs of Unit I to IV and ST I and II during Unit Annual Overhauling period of 2026 27
MTPS I TM Stage I Unit I II Load testing of 2 Ton capacity EOT crane 3 Ton capacity electrical Hoists in LP Bypass valves LHS RHS and movable 1 ton chain block trolleys in pumps and Compressor area for the year 2026 27
MTPS I Mill Plant Unit II Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills 2A to 2F during AOH 2025 26
TTPS Mech II TM I Unit I Overhauling of stator water primary secondary pumps Hydrogen cooler booster pump working oil coolers lub oil coolers of BFP and cooling water valves renewal of worn out BCW ACW cooling water pipes and renewal of gaskets i
MTPS I Mill Plant Unit III Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills Renewal of the worn out Mill
NCTPS I Operation Circle CA Division CWPH and its fore bay Units I II III Overhauling of A stream cooling water Pumps 1A 2A 3A BHEL Make Model CW1Q Vertical pump Capacity 16500 m3 hr Per pump respective discharge side Butterfly valves Size 1600 NB
Operation Circle CA Division CWPH and its fore bay Units I II III Overhauling of C stream cooling water Pumps 1C 2C 3C BHEL Make Model CW1Q Vertical pump Capacity 16500 m3 hr Per pump respective discharge side Butterfly valves Size 1600 NB Dewaterin
Operation Circle CA Division CWPH Attending to leaks and puncture breakdown works at Cooling Water Pump House by welding in the worn out pipes and valves area and painting the corroded pipe lines for the period of six months from the date of taken ov
Custom Bid for Services - Six yearly Overhauling of Computer Controlled Brake System VERSION 1 5 system valves of HHP Diesel Locomotives at Diesel Loco Shed GOC make Knorr Bremse with OEM or authorised dealer of OEM Similar Category Customized AMC/CMC for Pre-owned Products
Custom Bid for Services - TESTING OF 2 X 50T LPG BULLETS SAFETY VALVES AND ISSUANCE OF CERTIFICATE AS PER SMPV U RULES OF THE CCOE NAGPUR LOCATION LPG YARD MHD CAMPUS UNIT II BHEL TRICHY Similar Category Operation And Maintenance Of Other Machines And Plants
NCTPS I SE MI circle AOH 24 25 BM Dn Unit I III Overhauling of HP LP valves in PRDS WSB safety valves and renewal rectification of HP LP valves steam lines drain lines in PRDS station and its connecting drain lines to IBD tank during annual
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I II III Overhauling of HP LP valves in PRDS WWBS safety valves and renewal rectification of HP LP valves steam lines drain lines in PRDS station and its connecting drain lines to IBD tank
Supply of VALVE 6 PORT MIGTY RHEODYNE FOR DIONEX MAKE IC (MODEL: ICS 1100) as per specification., PISTON PMP 1250 X 1.464M GS50 SAPHIR FOR DIONEX MAKE IC(MODEL: ICS 1100) as per specification., Supply of CBL ASSY SUPPER FOR DIONEX MAKE IC(MODEL: ICS 1100) as per attached specification. ., Supply of SEAL SB UHMW/TFE PK FOR DIONEX MAKE IC(MODEL: ICS 1100) as per attached specification.
Manufacturing of Zinc Fasteners
Providing PCC pavement below the deluge valves (FDV-108), Hydrant valves (HDV-109) and water monitors in Fuel Oil Pump House area and other miscellaneous civil works in FOPH.
Copper Alloy Fancy Taps for Bathroom as per IS 8931 (Latest) (Q3), Plastics Bib Taps Pillar Taps Angle Valves and Stop Valves as per IS 9763:2000 (Latest) (Q3)
8871121123, Hydrotest charges, Cylinder Valve Replacement, Cylinder cap Replacement, Valve gland nut Replacement, Cylinder Painting
Supply and delivery of part turn actuator, make regada, type SP 2, Model no as per attached Annexure -1, Supply and delivery of part turn actuator, make regada, type SP 1, Model no as per attached Annexure-1, Supply and delivery of part turn actuator, make regada, type SP 2.3, Model no as per attached Annexure-1, Supply and delivery of part turn actuator, make regada, type SP 0, Model no as per attached Annexure-1, Supply and delivery of multi turn actuator, make regada, type SO 2, Model no as per attached Annexure-1, Supply and delivery of linear actuator, make regada, type ST 0, Model no as per attached Annexure-1, Supply and delivery of linear actuator, make regada, type ST 0.1, Model no as per attached Annexure-1, Supply and delivery of part turn actuator, make regada, type SP 2.4, Model no as per attached Annexure-1, Supply and delivery of Part turn actuator, make regada, type SP 2.3, Model no as per attached Annexure-1, Supply and delivery of part turn actuator, make regada, type SP 2, model no as per attached Annexure-1, Supply and delivery of part turn actuator, make regada, type SP 1, model no as per attached Annexure-1, Supply and delivery of Linear actuators, make regada, type ST 0, Model no as per attached Annexure-1, Supply and delivery of Linear actuators, make regada, type ST 0, Model no as per attached Annexure-1, Supply and delivery of Part turn actuators, make regada, type SP 0, Model no as per attached Annexure-1, Supply and delivery of spare part set consisting of top cover, seal for top cover, motor and capacitor for regada make actuator of type SP 0., Supply and delivery of spare part set consisting of top cover, seal for top cover, motor and capacitor for regada make actuator of type SP 1., Supply and delivery of spare part set consisting of top cover, seal for top cover, motor and capacitor for regada make actuator of type SP 2., Supply and delivery of spare part set consisting of top cover, seal for top cover, motor and capacitor for regada make actuator of type SP 2.3., Supply and delivery of spare part set consisting of top cover, seal for top cover, motor and capacitor for regada make actuator of type SP 2.4.
40 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC FOR MEL MAHAN STG II SBPRV, 100 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC FOR MEL MAHAN STG II SBPRV, 100 PERCENTAGE CAPACITY ELECTRIC SBPRV and ACC FOR MEL MAHAN STG II SBPRV, COMMISSIONING SPARES FOR MEL MAHAN STG II SBPRV, MANDATORY SPARES FOR MEL MAHAN STG II SBPRV, 40 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC FOR APL Raigarh Ph II SBPRV, 100 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC FOR APL Raigarh Ph II SBPRV, 100 PERCENTAGE CAPACITY ELECTRIC SBPRV and ACC FOR APL Raigarh Ph II SBPRV, COMMISSIONING SPARES FOR APL Raigarh Ph II SBPRV, MANDATORY SPARES FOR APL Raigarh Ph II SBPRV, 40 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC FOR APL Raipur Ph II SBPRV, 100 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC FOR APL Raipur Ph II SBPRV, 100 PERCENTAGE CAPACITY ELECTRIC SBPRV and ACC FOR APL Raipur Ph II SBPRV, COMMISSIONING SPARES FOR APL Raipur Ph II SBPRV, MANDATORY SPARES FOR APL Raipur Ph II SBPRV, 40 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC For Mirzapur MTEUPPL 2x800 MW Ph I SBPRV, 100 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC For Mirzapur MTEUPPL 2x800 MW Ph I SBPRV, 100 PERCENTAGE CAPACITY ELECTRIC SBPRV and ACC For Mirzapur MTEUPPL 2x800 MW Ph I SBPRV, COMMISSIONING SPARES For Mirzapur MTEUPPL 2x800 MW Ph I SBPRV, MANDATORY SPARES for Mirzapur MTEUPPL 2x800 MW Ph I SBPRV, 40 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC FOR APL Kawai 2x800 MW Ph II SBPRV, 100 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC FOR APL Kawai 2x800 MW Ph II SBPRV, 100 PERCENTAGE CAPACITY ELECTRIC SBPRV and ACC FOR APL Kawai 2x800 MW Ph II SBPRV, COMMISSIONING SPARES FOR APL Kawai 2x800 MW Ph II SBPRV, MANDATORY SPARES FOR APL Kawai 2x800 MW Ph II SBPRV, MANDATORY SPARES FOR APL Korba 2X800 MW Ph III SBPRV, 40 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC FOR MEL Mahan 2x800 MW Ph III SBPRV, 100 PERCENTAGE CAPACITY PNEUMATIC SBPRV and ACC FOR MEL Mahan 2x800 MW Ph III SBPRV, 100 PERCENTAGE CAPACITY ELECTRIC SBPRV and ACC FOR MEL Mahan 2x800 MW Ph III SBPRV, COMMISSIONING SPARES FOR MEL Mahan 2x800 MW Ph III SBPRV, MANDATORY SPARES FOR MEL Mahan 2x800 MW Ph III SBPRV
M9492060004, M9463176330, M9463176331, M9463176332, M9463176333, M9463176334, M9463176335, M9463176337, M9463176324, M9463176328, M9463176338, M9492060005
Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and, Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and Marine Applications and Oil and Gas Industry Flapper-style foot valve Threaded 6 inch Polyethylene
Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and, Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and Marine Applications and Oil and Gas Industry Flapper-style foot valve Threaded 4 inch Polyethylene
Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and, Gajanand Irrigation/ Water Supply/Water Wells Pump Systems and Marine Applications and Oil and Gas Industry Flapper-style foot valve Threaded 3 inch Polyethylene
Outsourcing 7 No of Security and 8 Nos of Computer operator, 9 No of UGSS/WS Supervisor, 11 Nos of Valve operator for the period of 3 months at Avadi City Municipal Corporation
Providing Manpower services for Graduate Engineering Personnel, Quantity Survey Personnel, Diploma Engineering Personnel, Valve operator, E and M operator, Draftsman Engineering Personnel on Outsourced basis at VOCPA for a period of Two years
Additional works of Providing assistance for Stator core repair works, Generator stator replacement works and HPCV 1 and 2 Valve seat replacement works as per SOW at NTECL- Vallur TPP-Unit 2 (500MW)
Proposed construction of Compound wall after demolishing the damaged wall and Valve operator waiting shed and roof convertion to Electrical room from MT roof to RCC roof in water tank premises near SP