Loading…
Loading…
8,730 results • Best match
Removing the old damaged refractory and applying the new refractory in the Dry bottom ash hopper reconditioning of Jaw crushers and Overhauling of butterfly valves in bottom ash Hopper area during the Annual Overhaul 24 25
Upkeeping by removal of dust and dirt all floors, toilets and operating the valves of water supply lines etc in the service building for the period of 180 days from the date of commencement of work.
Facility Management Services - LumpSum Based - DAE Township at Kalpakkam; Operation of Pumps, Motors, Valves and other equipment for Water Supply, Water Treatment plant and Sewage Treatment systems in Kalpakkam Township during the year 2026 to 2027; ..
NCTPS II SEMI Circle MPM III Ventilation system Overhauling of Unit I II Unitary Air filtration 75,000 CMH capacity Centrifugal fans, water circulating system, servicing of pumps and valves, cleaning of spray headers with branch pipes
MTPSI ES Circle CI FSSS 12 Annual Overhauling of Retractor Assembly of HEA Ignitors Flame scanners Pr.Gauges switches,DP switches, Temp.Gauges switches Transmitters SADC positioners HAG solenoid valves etc in UnitII for the year 2026 27
MTPS-1-ES Circle -CI- FSSS-Annual Overhauling of Retractor Assembly of HEA Ignitors, Flame Scanners, Pr.Gauges switches, DP switches, Temp.Gauges switches, Transmitters, SADC Positioners, HAG solenoid valves etc., in Unit-I for the year 2019.
Facility Management Services - LumpSum Based - DAE Township at Anupuram and IGCAR Site; Operation of Pumps, Motors, Valves and other equipment for Water Supply, Sewage Treatment systems & Water Treatment plant in Anupuram Township and Water Supply Sy..
MPM III Ventilation system Overhauling of Unit II AB row Air washer system 1,00,000 CMH capacity centrifugal fans, water circulating system pumps and valves, cleaning of spray headers with branch pipes during AOH of 2026-27.
921524960000 ARM L097 125X77X56, 921527270000 ARM 701x307x246 F22 L751, 921538410000 BONNET CLAMP WA81, 920583950000 BONNET FORGING CV52, 921521210000 BONNET 12 2500 GV A105 V345, 921534210000 BONNET 14 1500 GV A105 WC20, 921521240000 BONNET 14 ... 2500 NRV A105 ... 2500 NRV F22 ... 300 NRV F22 ...
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6628817 Dated : 30-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6628711 Dated : 30-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6642508 Dated : 03-09-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6628836 Dated : 30-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6645972 Dated : 04-09-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6642587 Dated : 03-09-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6628791 Dated : 30-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6628659 Dated : 30-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6628927 Dated : 01-09-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
lead acid battery Lead Acid Battery ( 20 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERIC Types of Lead Acid of Battery Small sized Valve Regulated Lead -Acid Batteries ... sized Valve Regulated ...
CONVEYOR CHAIN, 60W LED DRIVERS, 60W LED CHIPS, SEALING UNIT SERVICING, SEALING UNIT HOSE, SOLENOID VALVES, NON-VEG MEALS, VEG MEALS, 2 INCH SEWEL JOINTS, 2 INCH SS LING O RING, 2 INCH MALE HOUSING O RING, ERC CABLE, DBC FACE O RING, DBC SEWEL O ... DBC VALVE COUPLER ...
SM441110002 STEERING PUMP ASSY FOR BP100 PIPELAYER, SM441110047 TRANSMISSION PUMP ASSEMBLY SUITABLE FOR BP100 TON PIPELAYER, SM441110033 STEERING CLUTCH ASSEMBLY FOR BP100 PIPELAYER, SM441110034 BRAKE BAND ASSEMBLY LH FOR BP100 PIPELAYER, SM441110035 ... TRANSMISSION CONTROL VALVE SUITABLE ...
MTPSI ES Circle MRT Division UnitIV TG area Valve actuators and DVR Equipments Carrying out the maintenance works during the forthcoming annual Overhaul 2021 22.
MTPSI ES Circle MRT Division Unit III Boiler area Electrically Operated Valve actuators and Soot blowers Carrying out maintenance works during Annual overhaul 2021 22.
SPRING TO DRG. NO. 326-52 (Q3), SPRING TO DRG. NO. 3338-53 (Q3), DISCHARGING VALVE SPRING (DELIVERY) TO DRG. NO. 327-78-16 (Q3)
Construction of RCC Retaining wall at the slipped portion along the road at chainage 500m from ADIT junction to Valve house at Kodayar Upper Camp
Diaphragm -SS304L for the shapotools make metering pump of model DP-20-HYD-26-SD-EPNM, Jaw coupling for the shapotools make metering pump of model DP-20-HYD-26- SD-EPNM, Suction valve -NRV for the shapotools make metering pump of model ... Discharge valve -NRV ... - NRV for ... for NRV for ...
Copper Alloy Fancy Taps for Bathroom as per IS 8931 (Latest) (Q3), Bathroom Water Shower (Q3), Plastics Bib Taps Pillar Taps Angle Valves and Stop Valves as per IS 9763:2000 (Latest) (Q3), Sinks (Q3), Waste Pipe (Q3), Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3), Connection Pipe with Nuts (V2) (Q3), Rotational Moulded Polyethylene Water Storage Tanks as per IS 12701 (Q3), Soap Dish - Case (Q4), Towel Rail/Ring for Bathroom (Q3), Floor Drain Traps (Q3)
Repair and Maintanence of Main Pipe Lines Distribution Pipe Line and Gate valves at Ward Nos 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 in Sankagiri Municipality
Upkeeping by removal of dust and dirt in all floors, toilets and operating the valves of water supply lines etc in the service building for a period of one year from the date of commencement of work.
MTPSI ES Circle CI Division FSSS 1 2 Annual overhauling of Retractor assembly of HEA Ignitors Flame scanners Pr.Gauges switches, DP switches, Temp.gauges switches, Transmitters, SADC positioners, HAG solenoid valves etc in UnitII for the year 2021
NCTPS I SE MI circle AOH 25 26 TM Dn Overhauling of Various sizes of Valves in Boiler Feed Pumps ACW station and Condensate Discharge lines in various elevations in Unit III during Annual Overhaul 2025 26
MTPSI ES Circle CI Division FSSS 3 4 Annual overhauling of Retractor assembly of HEA Ignitors Flame scanners Pr.Gauges switches, DP switches, Temp.gauges switches, Transmitters, SADC positioners, HAG solenoid valves etc in UnitIII for the year 2021
A Part of cleaning works of Junction Boxes and push button boxes related to Turbine side valves in plant area of Unit I II and III for the period from 01 04 2023 to 31 03 2024
Upkeeping by removal of dust and dirt in all floors, toilets and operating the valves of water supply lines etc in the service building for a period of one year from the date of commencement of work.
TTPS Operation Circle CAD CWPH II Upkeepment and maintenance works in large dia pipelines, column pipes and accessories of cooling water pumps, discharge butterfly valves, 25/5 ton EOT crane and chlorination plant available in CWPH II
TTPS Operation Circle CAD FOPH Attending Preventive Maintenance of Fuel Oil Pump House equipment, furnace oil pipes line, light oil pipe lines, steam pipe lines and various types of valves for the period from 08.10.2020 to 31.03.2021
MTPS I ES Circle CI Division FSSS 1 2 Annual Overhauling of Retractor Assembly of HEA Ignitors, Flame Scanners, Pr.Gauges switches, DP switches, Temp.Gauges switches, Transmitters, SADC Positioners, HAG solenoid valves etc., in Unit IIaoh 2020-21
TTPS Mech II AHP Unit IV V Breakdown Overhauling of Ash Water pump filteration plant valves etc in units IV V for the period of work on or after 08 04 2018 and upto 30 09 2018
Overhauling of Unit I ACWPH Air washer 100000 CMH capacity Centrifugal fans water circulating system servicing of pumps and valves cleaning of spray headers with branch pipes attending leaks replacement of nozzles renewal of filter fixing frames
NCTPS II MI Circle MPM III Ventilation system Overhauling of Unit II ACWPH Air washer 100000 CMH capacity Centrifugal fans water circulating system servicing of pumps and valves Replacement of spray headers with branch pipes attending leaks
MTPS I BM Unit III Boiler COH 2019 Removal of Skin casing sheet and Insulation in Boiler Ist pass Inter pass and IInd Pass area MSL HRH Header inside the pent house and HP LP valves etc
Custom Bid for Services - Supply of various sizes of Carbon Steel seamless pipes, cast steel gate valves and bends, and replacement of existing eroded conveying air pipelines in Ash Handling System of NTPL Similar Category Support Services
Water Fittings - Copper Alloy Float Valves (Horizontal Plunger Type) as per IS: 1703 (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6794356 Dated : 15-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
lead acid battery Experience with Gov. Required 1 Year (s) Lead Acid Battery ( 18 ) Technical Specifications * As per GeM Catalogue. Specification Specification Name Values Allowed Values GENERIC Types of Lead Acid of Battery Small sized Valve ... sized Valve Regulated ... Stationary Valve Regulated ...
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6814482 Dated : 22-10-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6814513 Dated : 22-10-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6814423 Dated : 22-10-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6814268 Dated : 22-10-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6814542 Dated : 22-10-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Suction L. P(channel & Spring set), Suction H. P(channel & Spring set), 3) Delivery L. P(channel & spring set), 4) Channel&Spring set (Delivary H. P), 5) L. P Cylinder(valve plate), 6) H. P Cylinder(valve plate), 7) 3 Piece Packing, 8) Piston Ring/L. ... Seat valve (in/dis) ... inlet valve for ... Seat valve (in/dis) ... disch valve for ... 829 VALVE NL, ...