Loading…
Loading…
8,732 results • Best match
MAINTENANCE AND REPAIRS TO WATER SUPPLY SCHEME MAIN PIPES AND DISTRIBUTION MAIN PIPES AND GATE VALVES AT WARD NO. 10, 19, 30, 31, 32, 33, 34, 44, 45, 46, 47, 48, 49, 50 AND 51 IN Z-3 ECMC
CALIBRATION OF 6 INCH PRESSURE VENT OF AG PRODUCT TANK, CALIBRATION OF 3 INCH PRESSURE VENT OF UG PRODUCT TANK, CALIBRATION OF THERMAL, SAFETY RELIEF VALVES, CALIBRATION OF PRESSURE GAUGES, CALIBRATION OF DIFFERENTIAL PRESSURE GAUGES, CALIBRATION OF TEMPERATURE GAUGES
Overhauling of Unit I II BC bay Air washer 100000 CMH capacity centrifugal fans water circulating system servicing of pumps and valves cleaning of spray headers with branch pipes attending leaks replacement of nozzles renewal of filter fixing frame
IAC SPARE-COUPLING FLEXIBLE PIPING PART NO- 39323233, IAC SPARE -VALVE CONDENSATE, IAC SPARE -LP AIR END- PINION, IAC SPARE -GASKET .06THKX.75W NEOPRENE ADHESIVE BACKED, IAC SPARE -IN. NPT1 2 22475347 VALVE INLET- BLOWDOWN, IAC SPARE -TEE.38 SYN X.38 SYN X.13 NPT, IAC SPARE -ELBOW, 45 DEG .38 TUBE X .25 NPT, IAC SPARE -Oil Pump-Screw compressor
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6367721 Dated : 28-06-2025 Bid Document 1/8 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6733251 Dated : 26-09-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
MTPS I ES Circle MRT Division Unit II TG Area Valve actuators and DVR equipments Carrying Out the maintenance works during the forthcoming annual overhaul 2020 21.
Removal of sliding earth and boulders at 13th anchor near and above the Penstock from Kodayar Upper valve to Kodayar Power House -I at Kodayar Lower Camp.
Providing Distribution Main and Valve Arrangement in ward no.32 Sukkangal Patti Road (CMS Nagar Cross Street), Ward No.04 Malaiyammal puram cross street in Cumbum Municipality .
MTPSI ES Circle MRT UnitII Boiler area Electrically operated valve actuators and soot blowers Carrying out the maintenance works during Annual overhaul for the year 2026 27
TTPS Operation Circle MPM I Unit I, II and III Erection of 24 coal valve assembly complete set with manual operation only for XRP 763 Bowl mills.
Resurfacing the existing BT road branching from Kil Kundah - Coimbatore main road and upto hair pin bend - I along the road leads to Geddai valve house - II
MTPS-I ES Circle- MRT Division - Unit-I Boiler Area area-Electrically operated valve actuators and Soot Blowers-Carrying out Maitenance works during Annual Overhaul-2019-20
MTPS-I ES Circle- MRT Division-Unit-I TG Area area-Carrying Out maintenance works of valve actuators and DVR equipments during the forthcoming annual overhaul 2019
Custom Bid for Services - Refurbishment of HPT, IPT Valve Servomotors 500 MW at OEM Facility-BHEL Haridwar Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6580087 Dated : 18-08-2025 Bid Document 1/5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 0.03 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr. Accounts Officer ISRO Propulsion Complex Mahendragiri Tamilnadu, Department of Space, indian space research organization, Department of Space (Shri. Authimoola Perumal) Splitting
ELBOW 90 Degree UPVC - 25MM - 1 INCH FOR UPVC PIPE FITTINGS - ASTM AS PER D-2467 SCHEDULE 80, UPVC MTA 25MM - 1 INCH FOR UPVC PIPE FITTINGS -ASTM AS PER D- 2467 SCHEDULE 80 WITH ISI MARK., UPVC COUPLING 25MM - 1 INCH FOR UPVC PIPE FITTING ASTM AS PER ... MARK, GATE VALVE GM ...
L81001SC32401001 HEAD AND TAIL PIECE THREE FOURTH INCH A105, L81001SC32401002 CONNECTOR HALF INCH NPT MALExM20 x1 DOT 5 MALE SS, L81001SC32401003 CROSS THREE FOURTH INCH A105, L81001SC32401004 COUPLING THREE FOURTH INCH A105 CL 3000, L81001SC32401005 ... L81001SC32401012 GATE VALVE HALF ...
ITEM 1 920173710000 GUIDE SLVE ALY978 9456, ITEM 2 920173730000 GUIDE SLVE ALY978 9440, ITEM 3 920173740000 GUIDE SLVE ALY978 9425, ITEM 4 920174590000 GUIDE B584 978 7001, ITEM 5 920174620000 GUIDE B584 978 7003, ITEM 6 920174640000 DISC HR.B584 978 ... SNIK NRV 6 ... SNIK NRV 3 ... SNIK NRV 10 ...
MRT I Part of cleaning and tightness checking works of Junction boxes and Push button boxes related to Turbine side valves in plant area of Unit I II III for the period from 08 04 2020 to 30 09 2020
NCTPS I SE MI circle AMC 24 25 TM Dn Attending breakdown preventive maintenance works and attending steam Feed water Instrument air leak in various high pressure pipelines joints and renewal of gaskets of various sizes of high pressure valves
MTPSI ES Circle CI FSSS 34 Annual overhauling of retractor assembly of HEA ignitors flame scanners Pr. Gauges and switches,DP switches,Temp gauges and switches,Transmitters, SADC positioners,HAG solinoid valves etc in UnitIV for the year 2024 25
MTPSI ES Circle CI Division FSSS 3 and 4 Annual overhauling of retractor Assembly of HEA Ignitors Flame scanners Pr Gauges switches DP switches Temp gauges switches Transmitters SADC positioners HAG solenoid valves etc in UnitIV for the year 2022
MTPSI ES Circle CI Division FSSS 1 and 2 Annual overhauling of retractor Assembly of HEA Ignitors Flame scanners Pr. Gauges and switches DP switches Temp. gauges and switches Transmitters SADC positioners HAG solenoid valves etc in Unit II f
Health Faucet (Q3), HYDRAULICALLY REGULATED DOOR CLOSERS (Q3), Water Fittings - Copper Alloy Float Valves (Horizontal Plunger Type) as per IS: 1703 (Q4), LED Luminaire (Recessed Luminaire) (V3) Conforming to IS 10322 (Part 5/Section 2) (Q3), LED Batten (Q2) (3 (3 ))
MTPSI ES Circle CI FSSS 3 4 Annual overhauling of Retractor Assembly of HEA Ignitors, Flame scanners, Pr. Gauges and switches, DP switches, Temp gauges and switches, transmitters, SADC positioners, HAG solenoid valves etc in Unit-IV for the year 2
MTPS-I ES Circle CI FSSS 1 2 Annual overhauling of retractor Assembly of HEA Ignitors, Flame scanners, Pr. Gauges switches , DP switches, Temp. gauges switches, Transmitters, SADC positioners, HAG solenoid valves etc., in Unit-II for the year 2025
MTPS II - Civil Circle - Upkeeping by removal of dust and dirt in all floors, toilets and operating the valves of water supply lines etc in the service building for a period of one year from the date of commencement of work.
Supply and delivery Erection 2000LPM x 40 M Head , 1500LPM x 40 M Head of Open well Submersible pump set at Pon nagar and moolakattanur Sump , Providing of Electromagnetic Flow Meter, Air Valves at kattalai HW for karur city municipal corporation
A Preventive Maintenance works of Boiler Side Valves Damper actuators control panels in plant auxiliaries area pertaining to SUB DN I of MRT I in Units I II and III for the period from 09 04 2021 to 30 09 2021
MTPS-I ES Circle CI FSSS 12- Annual overhauling of retractor assembly of HEA ignitors, flame scanners Pr. Gauges switches, DP switches, Temp gauges switches, Transmitters, SADC positioners, HAG solinoid valves etc in Unit-I for the year 2026-27
MTPSI ES Circle CI FSSS 3 4 Annual overhauling of retractor assembly of HEA ignitors flame scanners Pr. Gauges switches, DP switches, Temp gauges switches, Transmitters, SADC positioners, HAG solinoid valves etc in Unit-III for the year 2026-202
A Preventive Maintenance works of Boiler Side Valves Damper actuators control panels in plant auxiliaries area pertaining to SUB DN I of MRT I in Units I II and III for the period from 08 10 2020 to 31 03 21
MTPS-I ES CI FSSS 1 2- Annual overhauling of Retractor Assembly of HEA Ignitors, Flame scanners, Pr. Gauges switches , DP switches, Temp. gauges switches, Transmitters, SADC positioners, HAG solenoid valves etc in Unit-I for the year 2025-26.
MTPS-I ES Circle CI FSSS 34 Annual overhauling of retractor assembly of HEA ignitors, flame scanners, Pr. Gauges switches, DP switches, Temp gauges switches, Transmitters, SADC positioners, HAG solinoid valves etc in Unit-III for the year 2025-20
MTPSI ES Circle CI Division FSSS 3 4 Annual overhauling of retractor Assembly of HEA Ignitors Flame scanners Pr Gauges switches DP switches Temp gauges switches Transmitters SADC positioners HAG solenoid valves etc. in Unit III for the year 22 23
TTPS Mech II AHP Unit V Attending breakdown maintenance of ESP APH ECO hopper equipments sea water pipe line and valves in Unit V for a period of work on or after 08 10 2018 and upto 31 03 2019
TTPS Mech II AHP Unit IV Attending breakdown maintenance of ESP APH ECO hopper equipments sea water pipe line and valves in Unit IV for a period of work on or after 08 10 2018 and upto 31 03 2019
TTPS Mech II AHP Unit IV Attending breakdown maintenance of ESP APH ECO hopper equipments sea water pipe line and valves in Unit IV for a period of work on or after 08 04 2018 and upto 30 09 2018
TTPS Mech II AHP Unit V Attending breakdown maintenance of ESP APH ECO hopper equipments sea water pipe line and valves in Unit V for a period of work on or after 08 04 2018 and upto 30 09 2018
TTPS Mech II AHP Unit IV Attending breakdown maintenance of APH and ECO hopper equipments sea water pipe line and valves in Unit IV for a period of work on or after 08 04 2019 and upto 30 09 2019
TTPS Mech II AHP Unit V Attending breakdown maintenance of APH and ECO hopper equipments sea water pipe line and valves in Unit V for a period of work on or after 08 04 2019 and upto 30 09 2019
Supply and erection of insulation at Boiler pressure parts critical pipe lines burner valves oil lines APH pent house etc during boiler puncture works and other shut down works for a period of 6 months or completion of quantity whichever
NCTPS II MI Circle MPM III Switch yard Ventilation System Overhauling of switch yard Air handling units 80000 CMH in 400 KV 12500 CMH in 230 KV Capacity Centrifugal fans water circulating system servicing of pumps and valves cleaning of spray
NCTPS II Mechanical I Circle Common Auxiliaries Unit II AOH Overhauling of DM water transfer pumps and valves 2A 2B Split casing two stage horizontal centrifugal pump capacity 120 cumt at 60mts head attending puncture in DM transfer pump 2B 150
MTPS I Mill Plant AC Plant Unit III Capital overhaul Air Washer System Epoxy painting blower 3A and spray system Enamel painting the pipe lines Replacement of blower bearing Overhauling the AWCW Pump 3C Overhauling of Gate valves spray nozzles etc
MTPS I TM Unit I Cleaning and painting of inner and Outer portion of Receiver Tanks of 1 and 2 for Instrument Air and Service Air and renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks etc.
Custom Bid for Services - ANNUAL MAINTENANCE CONTRACT FOR RUBBER LINING INSPECTION AND RELINING WORKS OF TANKS, VALVES, PIPELINES & FITTINGS IN DESALINATION PLANT, CPU REGENERATION PLANT AND CW CHLORINATION PLANT AT NTECL Similar Category Operation and Maintenance Power House/Power Plant
JOY STICK RIGHT PART NO 7101979, RING BACK UP PART NOV PP11320013, PISTON O RING PART NO PP11320088, SEAL WIPER PART NO PP11320090, JOY STICK LEFT PART NO 7101980, SINGLE SOL DC VALVE LOE PR PART NO 28B1020, PROP SHAFT PART NO 7106017, SEAL KIT O BY ... RELAY VALVE PART ... PROTRCTON VALVE PART ...
9156409571 SURFACE AREA PORE SIZE ANALYSER AND PARTS, 9156403031 VALVE CLIPPARD 2 WAY MM 193593, 9156400021 Vacuum PUMP OIL PFEIFFER 1L PN 193678, 9156400131 HEATING MANTEL PN 01313 E MAKE QUANTACHROME, 9156400031 ORING VITON 9MM BROWN PACK OF 2 PN ... 9156401591 VALVE SPIDER ... 9156401581 VALVE WASHER ...