Loading…
Loading…
377 results • Best match
Periodical Repair of road from near P S to F C I Godown and NH 08 near Naydrone School to Ratiabari via Biplab Deb house during the year 2021 22 SH Patch metalling Grouting Carpeting Sand seal coat etc Length 810 mtr
Periodical Repair of road from Tapas Kar godown to Rajnagar SB school L equals to 0 point 70Km JKm under the jurisdiction of Ganganagar Sub Division during the year 2023 24 SH Stripping Katcha Drain WBM Tack Coat Carpeting and Seal coat
Improvement of road from NH 08 to Godown Para L 0 point 38 km from Ch0 km to 0 point 38 km under PWD R and B Pencharthal Sub Division during the year 2022 23 SH WBM Carpeting Seal Coat RCC retaining wall GrI
4. Maintenance of Black top road from the house of SridamDebnath to the house of HabulDey (Back side of RD Godown) and raising of existing Black top road near the house of BikramSaha including improvement of drainage system under ward No.22 during th
Urgent Flood Damage Repair of road from i Damcherra Motorstand to Dasarath Setu from CH.0.00KM to CH.0.36 KM Total Length 0.36 Km ii Damcherra Bazar road to Food Godown approach road Total Length 0.045Km under Damcherra Sub Division, PWD R and B d
Const. of brick soling from jitendra Das house to Sonamukhi Ferry Ghat at jalai G.P, Maintenance of community hall near the house of Betasena Singha at Jalai G.P and Const. of Idgha near Gournagar Maszid and repair ,Mtc. Of inner road of Food Godown
SH- Earthwork, R.C.C Work, Tubular Truss etc.
Maintenance work
Construction of Toe Wall , Metalling, Repairs of Potholes, Carpeting, Re- Carpeting, Protections works etc. during the year 2024-25.
for distribution of quality seed materials to the farmers SH Construction of i seed processing plant ii Dehumidified Godown iii Non seed Godown for seed processing plant iv office building
Maintenance of the road from Balakbaba Ashram road opposite Godown to H/O Pratyush Chakraborty West Laxmibill kabarkhala via H/O Pradip Saha L 0 point 700 KM during the year 2023-24/ SH Patch WBM 3 Re-carpeting pot hole repair and other allied work
Mtc. of road Starting from Jogendra Nagar Rail Station LPG Gas Godown to Lay bay at NH 08 and adjacent roads L 0.900 Km within the AMC Ward no 51 , under jurisdiction of Central VI Sub Division, during the year 2023 24 SH Patch soling, metalling, gro
Mtc. of road Starting from Jogendranagar Rail Station LPG Gas Godown to Lay bay at NH 08 and adjacent roads L 1.00 Km within the AMC Ward no 51, under jurisdiction of Central VI Sub Division, during the year 2023 24 SH Patch soling, metalling, grouti
Mtc of road Starting from Jogendra Nagar Rail Station LPG Gas Godown toward NH 08 via Modern High School and adjacent roads L 0.60 Km within the AMC Ward no 51, under juridiction of Central VI Sub Division, during the year 2022 23 SH Patch soling,
Maintenance
SH- Pucca drain etc. from ch-0.00km to 0.142km.
CONSTRUCTION WORK
Mtc of road from NIT Gate No 2 to Shankar bazar via Badramiship para (Ch. 0.00 to 2.64 Km, Length 2.64 Km) and Harijoy Chowdhury para to TEC road(Food Godown) via Binapani (Ch. 2.03 to 3.23 Km, Length 1.20 Km) under PWD (R B) Jirania Sub Division
Construction of Toilet and dressing room with ground water tank at Food Go-Down Tilla ward no-2 under Sabroom Nagar Panchayat during the year 202-21
INTERNAL ELECTRIFICATION
Maintenance of road from NH-08 at Bazar India to Murabari Length 2 point 10 Km / portion from Bazar India to Rail Bridge from Ch 0 point 00 km to Ch 1 point 10 km Length 1 point 10 km and office tilla Horticulture Godown to Bazar India to Murabari
Construction of R.C.C Retaining / Protection Wall at newly constructed 500 M.T Food Godown at Ganganagar
SH- Patch metalling, re-carpeting and seal coat. During the year 2025-26. (Portion from 0.00 km to 1.245 km) Gr-I.
Settlement
Maintenance
Construction
Installation of S.B.D.T.W including yard development
WBM 3, Grouting, Re-carpeting, seal coat andSurface drain etc.
Construction work
Brick boundary wall with RCC column Part-1 East and South side.
Boundary wall with RCC column and Brick wall with barbed fencing(Part-2) west side.
Construction of CC gravity retaining wall at pond site and barded weir boundary wall at North side(Part-3).
ROOFING, DISMANTLING AND DEMOLISHING WORK, BRICK WORK,FINISHING ETC
MAINTENANCE AND REPAIR WORK
constructed 1000 MT capacity Food Godown at Santirbazar under Santirbazar Sub-Division, South Tripura SH- Earthwork, Brick Soling, WMM,PMC etc.
Service
SH- Building portion including Internal water supply, Sanitary Installation, Sewage and Drainage works (2nd Call).
Execution of Miscellaneous Repair Maintenance, upgradation and Construction works in Zone 6 a cluster of central warehouse located at Agartala Hapania, Agartala Amtali and Sabroom on Annual rate Contract basis.
SH- Construction of sheet covering with truss at warehouse balcony, additional toilet room at CMO office ,UGR, paver Block, submersible water pump, site clearing and allied works during 2021-22.
CONSTRUCTION WORK
Transportation
Setting up of Tertiary waste Processing center at Chandrapur Colony (near central FCI Godown) Under Udaipur Municipal Council, Udaipur during the year 2020-21.
PCC, Brick Masonry, Steel Works etc
INTERNAL ELECTRIFICATION
CONSTRUCTION WORK
SH- WBM -III, Brick works, Paver Block works etc During the Year 2025-26.
Construction
Construction
Construction
Transportation of RD materials.