Loading…
Loading…
967 results • Best match
Providing Reverse Osmosis Water Purifier to a Capacity of 1000 Litres at Govt Girls Higher Secondary School in Pennagaram Town Panchayat
Providing Reverse Osmosis Water Purifier to a Capacity of 1000 Litres at Govt Boys Higher Secondary School in Pennagaram Town Panchayat
Providing Reverse Osmosis Water Purifier to a Capacity of 1000 Litres at Govt Girls Higher Secondary School in Papparapatti Town Panchayat
Installation of RO Plant water Dispenser and other connected works in Elementary Building located at Perasiriyar Anbazhagan Education campus Nungambakkam Chennai 06
E BIKE, E- CYCLE, INDUCTION BHAGONA, 165 LTR REFRIGERATOR, WATER DISPENSER, HVLS FAN, LED TV 43 INCH, INVERTOR, PORTABLE TOILET, PEDESTAL FAN
job Contract for AC, Water coolers, RO Units and dispensers, AICMC of Ductable Split type 8.5 TON AC 1 st Year, AICMC of Ductable Split type 8.5 TON AC 2nd Year, AICMC of Ductable Hide away Split type 7.5 TON AC 1 st Year, AICMC of Ductable Hide away ... litre water cooler 1 ... litre water cooler 2 ... cold water dispensers 1 ... cold water dispensers 2 ... ltrs water cooler with ... ltrs water cooler with ...
SOLAR LED LIGHT WITH POLE AND BATTERY (Q3), WATER COOLER WITH OVER HEAD TANK AND COMPLETE INSTALLATION (Q3)
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6607845 Dated : 29-08-2025 Bid Document 1/6 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 0.03 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SR. ACCOUNT OFFICER ISRO Propulsion Complex Mahendragiri Tamilnadu, Department of Space, indian space research organization, Department of Space (Authimoola Perumal. N) Splitting
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6394240 Dated : 21-07-2025 Bid Document 1/7 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6750989 Dated : 13-10-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Construction of conference Hall adjoining to PPC building for HAPP at Trichy. Sub work C1 Building portion including internal water supply sanitary installation and external services, sub work E1 SITC of water purifier, signages balance work of fire extinguishers, sub work E2 Net working (Active component and passive components) sub work E3 EPABX system sub work E4 conference hall IEI AV System ,VRV/VRF Air Conditioners 13 passenger (884 KG)lift.
Trapezoid Plyometric Box 30 Feet, Water Dispenser, Cone 1.5 Feet, Veg Basket, Food Container, Flask, Insect Killer, Table Cloth Green 10 Mtr x 6 Mtr
Special Repairs to Water Dispenser, Water line works at Commissionerate of Treasuries and Accounts in various floors of Perasiriyar K.Anbazhaga Maaligai at Nandhanam, Chennai-35.
Construction of Admin Building (Ground plus one) along with site development including internal electrical installations, lightning conductors, external LT service connection, emergency light and illuminated signages, street lightning, water supply ... plant, water coolers , ...
Metal Bunk Beds, Metal Beds, Bed sheet/Bed cover, Cotton Pillow, Blanket for CAPFs, Ceiling Fan - as per IS 374, decorative mats-- mat door coir, WHITE-LED BASED SOLAR STREET LIGHTING SYSTEM, Solar lamps (Solar Based Home Systems - Solar Power Packs ... ), Drinking Water Cooler - ...
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6590173 Dated : 10-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 16 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr. Accounts Officer, SDSC SHAR Satish Dhawan Space Centre SHAR, Department of Space, Indian space research organization SRIHARIKOTA- 524124 (Sr. Accounts Officer, Sdsc Shar)
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7017060 Dated : 30-12-2025 Bid Document 1/9 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Operation and Maintenance of 62.5 KVA DG Set-1 No, 200 KCA DG Set 1 No, 250 KVA Dg Set 1 No, 44/22 HP Capacity VRF System, 100 KVA UPs 2 Nos, 60 KVA Ups 1 No, RO System, Biometric access control system, fire suppression system and EPABX installed for the exclusive use of Special Bureau C-4A, GPOA, Rajaji Bhawan, Chennai-90 SH :- Annual Comprehensive Maintenance of UPS
Operation and Maintenance of 62.5 KVA DG Set -1 200 KVA DG Set 1 No 250 KVA Set 1 No 44HP -22 HP capacity VRF system 100 KVA UPS-2 Nos 60 KVA UPS-1No RO System Biometric Access control system Fire suppression system and EPABX installed for the exclusive use of special Bureau C4-A GPOA Rajaji Bhawan Chennai-90 for the year 2024-25 Subwork/Packages: Providing CCTV cameras and LED fittings
1 Point 5 Ton Split AC, Steel Cooler Heavy Duty, Hot and Cold Water Dispenser, RO 8 L RO plus UV plus UF plus TDS, 20 Ltr Water Bottle
Lithium Ion Solar Battery, FRP Garden Bench, Water Cooler with 02 year warranty, Hath Kuda Gaadi, Single Bin Dumper Placer BOQ Title BOQ BOQ
Supply and Installation of Green Magnetic Chalk Board 8x4 Testing and Commissioning of 4Kg Fire Extinguishers and Testing and Commissioning of 25 LPH RO Systems in Sankagiri Municipality Limit 9 Elementary School and 1 Middle School
Comprehensive Annual Maintenance contract of window A/C, spilt A/C, Packaged units, Deep freezer, Refrigerators,Fan coil unit and water coolers installed in Plants of INRPK BARCF Kalpakkam
Construction of Girsls hostel (Gplus1) along with site development including internal water suply, sanitary installation, external service connection, underground sump, internal roads, footpath, external sewerage, storm water drain, rain water ... plant, water coolers , ...
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6561988 Dated : 18-08-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Hot/Cold Water Dispenser (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6394399 Dated : 01-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 40000 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Operation and Maintenance of 62.5 KVA Dg set 1 No, 200 KVA DG set 1 No, 60 HP/44 HP/22 HP Capacity VRF System, 100 KVA UPS 2 Nos, 60 KVA UPS 1 No RO System fire Suppression System and EPABX installedf for the exclusive use of Special Bureau, C4-A, GPOA, Rajaji Bhawan-90 for the FY 2023-2024. SH :- Repair and Replacement of defective IEI Equipments & Misc Electrical works
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - As per tender document; Sl No 1 Annual Maintenance Charges (AMC) for Existing RO Systems up to 10 LPH, including service charges, routine inspections, repairs, ... Existing RO Systems with ... Existing RO Systems with ...
Bottled Water Dispenser (V3) ISI Marked to IS 17681 (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid Number : GEM/2025/B/6792463 Dated : 16-10-2025 Bid Document 1/5 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Annual Repair and maintenance 62.5 KVA DG Set 1 No, 200 KVA DG Set 1 No, 250 KVA DG Set 1 No, 44/22 HP VRF System, 100 KVA UPS 2 Nos, 60 KVA UPS 1 No, RO System, EPABX System, Bio Metric Access Control System, Gas Based Fire Suppression System, and split type AC Units, installed for the exclusive use of special bureau, C-4A, GPOA Rajaji Bhawan, Chennai-600 090. SH :- Annual Comprehensive Maintenance of UPS
Annual Repair and Maintenance of 62.5 KVA DG set-1 No, 200 KVA Dg Set 1 No, 44HP/22HP Capacity VRF System, 100 KVA UPs 2 Nos, 60 KVA UPs 1 No, RO System, EPABX System, Biometric Access Control System, GBFSS & Split Type AC Units, installed for the exclusive use of special bureau C4-A, GPOA Rajaji Bhawan, Chennai-90 for the year 2025-26. SH :- Replacement of outlived AC/DC Capacitors of 1 No 60 KVA UPS
WINDOW AC 1 point 5 TON 5 STAR, TOWER AC 3 or 4 Ton, REFRIGERATOR 320 LTR, REFRIGERATOR 200 LTR, REFRIGERATOR 47 LTR, DEEP FREZER 320 LTR, DEEP FREZER 200 LTR, RO 50 LTR, RO 100 LTR, WATER COOLER 80 or 40 ltr, WATER COOLER 120 ltr, ENERGY METER 10 to 60 1 PHASE, ENERGY METER 10 to 60 3 PHASE
Water Dispenser, 20L Water Bottle, Gamla 18 Inches, Gamla 15 Inches, Revolving Chair, Paint Green, Paint Blue, Paint Red, Paint White, Peg Table, Cushion Cover for 5 Seater Sofa Set, Plastic Chair Cushioned
Operation and CMC of Central Air-conditioning and unitary Air-conditioning
Job contract for round the clock operation and All Inclusive Comprehensive Maintenance work of 3X325TR HVAC plant and associated equipments, All inclusive Comprehensive Maintenance contracts All type of Unitary Air-condtioning units of different make
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6955376 Dated : 17-12-2025 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
C/o. Girls Hostel (G plus 1) along with site development i/c. internal water supply, sanitary installation, external service connection, underground sump, internal roads, footpath, external sewage, storm water drain, harvesting and septic tank, ... plant, water coolers , ...
Construction of New Kitchen for Opal Mess at NIT, Trichy. SH: Building portion including water supply, sanitary installation, aluminium work, water proofing, including Internal Electrical Installations, Lightning conductors, External service (MV ... Plant, Water coolers , ...
Construction of Permanent Building for ECHS Polyclinic (Type - D) at Nagapattinam. SH: Building portion including water supply, sanitary installation, civil external service connection , sewer lines , OHT without independent staging , water proofing ... Plant, water coolers , ...
Custom Bid for Services - Cleaning, Servicing, and Breakdown Maintenance of ACs, Water Coolers, Panel ACs, and Refrigerators at BHEL Ranipet Similar Category Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System)
Custom Bid for Services - O & M OF INDUSTRIAL RO PLANTS (19 Nos), DOMESTIC RO PLANTS, PRE-FILTERS FOR GEYSERS, PRE-FILTERS FOR WATER COOLERS Similar Category Operation And Maintenance Of Other Machines And Plants
Annual maintenance contract of Split A/C, Window A/C, Cassette A/C, Water Coolers, Deep Freezers and Refrigerators installed in various units of WIP, NSB, ITF,UOF and VWSF of BARC Facilities Kalpakkam
Construction of Dining Hall and Kitchen for Amethyst Hostel in NIT Trichy. SH-I: Building portion including water supply, sanitary installation, Civil external service connection, Sewer lines, Platform for OHT, water proofing work, Development works ... Plant, Water cooler , ...
Construction of Admin Building G plus 1 along with site development including internal electrical installation Lighting conductors external LT service connection emergency light illuminated signages street lighting water supply pumps RO plant Water coolers...
Construction of additional hostel block no. 9 (G PLUS 10) including furniture works. SH: Building portion including water supply, sanitary installation, civil external services connections, internal electrical installations, external electrical ... installations, water coolers , ...
Annual repair and maintenance of 62.5 KVA DG Set -1 No, 200 KCA DG set - 1 No, 250 KVA DG Set 1 No, 44HP/22HP Capacity VRF System , 100 KVA UPS - 2 Nos, 60 KVA Ups 1 No, RO System, EPABX System, Biometric Access control System, Gas Based Fire Suppression system and Split AC Unit installed for the exclusive use of special bureau, C-4A, GPOA, Rajaji Bhawan, Chennai-90 for the year 2025-26. SH :- Replacement of outlived DC Capacitors of 2 Nos 100 KVA UPS
Overhauling and Gasket Renewal of Stator Water coolers, Overhauling of Gate valves in H2 coolers, Generator Stator water pump -B, Seal Oil Pumps, Plant air compressor coolers, and oil seal replacement work in Service Air Compressor -A during the
RICE COOKER 10 LTR, RICE COOKER 20 LTR, REPAIRING OF WATER DISPENSER, GUM BOOT WITH GLOVES, DUST CLEANING GUD, POLIMER RUBBER STAMP DATE MONTH YEAR, WASHER DRESS, TASK WISE BOARD PRINTED TYPE, POLIMER RUBBER STAMP GROUP OFFICER, TEA COFFEE MAKING MACHINE
AHST2E - LP Element Exchange Kit for Atlas Copco Instrument Air Compressor -Water Cooled-ZR75., AHST2E - HP Element Exchange Kit for Atlas Copco Instrument Air Compressor -Water Cooled- ZR75., AHST2E - Drive Shaft Seal Kit for Atlas Copco Instrument ... ZR75 water cooler drain ... ZR75 water cooler hexagon ... ZR75 water cooler hexagon ... ZR75 water cooler washer, ...
ROTARY COMPRESSOR FOR 1 TON R-22 - 230 VOLT MODEL, ROTARY COMPRESSOR FOR 1.5 TON R-22 -230 VOLT MODEL, ROTARY COMPRESSOR FOR 2.0 TON R-22 - 230 VOLT MODEL, ROTARY COMPRESSOR FOR 1.5 TON R-32 - 230 VOLT MODEL, ROTARY COMPRESSOR FOR 2.0 TON R-32 - 230 ... V, WATER COOLER COMPRESSOR ... -R-134A, WATER COOLER COMPRESSOR ... -R-134A, WATER COOLER COMPRESSOR ...