Supplying , fixing and welding of MS/GI Flanges (Heavy Duty) for 6 inch dia pipe line, 1400 mtrs length in Vijay West UG Mine for coming monsoon -2022
Transportation, installation, operation and shifting of pump and transportation and laying/extension of pipe line for 3dip/14L pump in Seam-II of Katkona 1 and 2 Mine.
Hiring of DG set for power supply to welding machine regarding repairing / laying and jointing of pipe line on as and when required basis at Dipka Expansion Project.
Making connection in existing pipe line with replacement of damaged pipes including connected works of miners quarters behind Indira Stadium at Adarsh Nagar of Kusmunda Area. (Re-tender)
Day to day installation and shifting of pumps and laying and jointing of pipe line at sadbhav patch no. 1 (hardibazar side) sump at quarry of Gevra Project..
Repair and Maintenance of Sprinkler and Its Pipe line at CHP of West JKD Mine in/c covering of Sedimentation Tank under JKD Sub Area of Hasdeo Area.
Repairing/Renovation of water supply pipe line of 1B-217 to 228, 229 to 244 and 1B 245 to 258 (42 units) at Bishrampur Township of Bishrampur Area.
Diversion of water supply pipeline for Sr.Recreation Club at Gevra Area
Providing ,fixing and laying of pipe from delivery end of pump located near 63 and 64 dip/23L(Baraudhi) to Borehole near (1/2 Mines) for providing water under Bhatgaon Sub Area of Bhatgaon Area.
Providing 100 mm dia G.I. water supply pipe line from over head water tank to MQ/229 with replacement of damaged branch line at Dipka colony of Gevra Area.
Making temporary pump foundation shed and providing and fixing sand bags for protection of rain cut, delivery pipe line and making parapet for culverts at KOCP of Kusmunda Area.
Providing and laying 1 inch dia pipe line in UG for 39LN LHCM panel in seam A at Kurja UG Mine. Total length 3980m and time period six month
Laying of GI Pipe line for new borehole to NS Nagar and settling tank and replacement of damaged water supply line laid at Nehru Shatabdi Nagar, SECL HQ. Bilaspur.
Supplying & fixing Indian Bio-Toilet with Digester Tank specification size 100x10x2080MM Inbuilt Bio Digester Tank Capacity=35 Ltrs.Accessories =water Tap with pipe line ,Wash Basin over head water T
Dismantling of Old pipeline and Laying and Jointing of 8/10 inch MS pipeline at Barkutta Patch (from Barkutta Chowk to Satarkata Chowk) at New Route, EnM, KOCP
Facilitating power through vehicle mounted DG Set for pipeline welding works regarding repairing/laying and jointing of pipeline at places not having power facility of Dipka Expansion Project.
Shifting, diversion, extension of pipeline arrangement from Old Dipka quarry sump to Chandni Chowk junction by laying and jointing of pipeline for dewatering purposes at Dipka Expansion Project.
Civil work for repair to service shafts and replacement of damaged pipelines of Boys Hostel, Girls Hostel and Nursing Student Hostel at AIIMS Raipur
Work for diversion of pipeline of East 223 sump of Gevra Project.
Laying and jointing of pipeline by extension of the existing pipeline at Sirki pond to newly constructed settling pond near Ground Bunker-1 and 2 at Dipka Expansion Project.
Day to day welding works like welding hinges, repairing of sheet shutter and water supply pipe line and Carpentry repair works etc. at AHQ of Bhatgaon Area for one Year
Repair and maintenance of Branch line for supply of drinking water in South JKD township including providing pipe line from Tekchand hotel to Hasdeo House under AHQ of Hasdeo Area.
Providing and fixing of Stainless-steel spindle with brass checknut for sluice valve and Non-Return Valve in different location of water supply pipe line of Township AHQ Korba Area
Day to day Jointing, dismantling, removing, shifting and transporting of M.S. Pipe line as and when required at different location in quarry at KOCP for a period of 360 days.
Providing surveillance and security in Chhattisgarh Sector for Paradip-Raipur-Ranchi Pipeline
Carrying out coating surveys for Paradip Raipur Ranchi Pipeline - GR B (Chhattisgarh)
Laying of 4 Dia pipe line for supply of clean water to low height continuous miner in proposed depillaring panel 30LS(LHCM panel) of seam A at Kurja sheetaldhara UG Mine.
Assistance for handling /operation/maintenance of pipe line for radiant wet drill machine deployed for resin bolting roof support of depillaring panel 4J-5A in 4A seam at Jhiria UG Mine.
S-CPG1-401 Re-strengthening of Road with Construction of Drain, pedestaland culvert along ash pipe line inside and outside of Shahpur Ash Dyke Area at NTPC Singrauli, Sonebhadra, Uttar Pradesh
Shifting of face pump, pump starter, cables and extension of suction and delivery pipe line in proposed dep. Panel KCW-1 in C seam at Kapildhara UG Mine of Hasdeo Area.
Transportation and installation of one HT pump capacity- 1000 GPM and laying of 6 Inch pipe line from surface to 5LW/70 X Dip at West block of Churcha Mine RO.
Replacement of damaged water supply distribution pipe line with in the colony of B type Colony, 749 MQ Colony, Kothari Colony, Korea MQ Dafai at Kurasia Sub area in Chirimiri Area.
Arrangement of Water Storage Near Laxman Nala Pond With Check Dam and Supply Pipe Line for alternate arrangement of Dust Suppression for New CHP and Workshop at Laxman Site Gevra Area
Shifting of face pump, pump starter, cables and extension of sunction and delivery pipe line in working district of 5/6 Incline (8A2 seam) at Rajnagar RO Colliery of Hasdeo Area
Annual miscellaneous Civil repair and maintenance works at Regional store, OITDS,MTK No.1, Canteen and Blasting office including replacement of damaged pipe line at Dipka Expansion Project of Dipka Area.
Shifting of face pump, pump starter, cables and extension of sunction and delivery pipe line in working district of 5/6 Incline (8A2 seam) at Rajnagar R.O. Colliery of Hasdeo Area
Extension and diversion of pipe line by welding and laying of 10 inch X 6 mtr M/S Pipe towards NCC sump for dewatering of existing water for mining activity KOCP
Laying of 4 Dia pipe line for supply of clean water to low height Continuous Miner in proposed Depillaring panel 39LN(LHCM panel) of seam A at Kurja Sheetaldhara UG Mine.
JOB CONTRACT FOR RELAYING OF BARGE PUMP DISCHARGE PIPELINE AT BARRAGERIGHT CANAL AT NTPC NABINAGAR
Custom Bid for Services - 200140361 - BIENNIAL SERVICE CONTRACT FOR INSPECTION & MAINTENANCE WORKS OF ASH SLURRY - WATER PIPELINES, FUGITIVE DUST CONTROL AND OPRN/MNTC OF DEWATERING - AWRS PUMPS AT ASH DYKE NTPC SIPAT Similar Category Operation and Maintenance Power House/Power Plant
BIENNIAL SERVICE CONTRACT FOR INSPECTION AND MAINTENANCE WORKS OF ASHSLURRY WATER PIPELINES, FUGITIVE DUST CONTROL AND OPRN/MNTC OFDEWATERING AWRS PUMPS AT ASH DYKE NTPC SIPAT
Assistance in day to day running maintenance/repairing of pipelines and valves of different coal stocks at Dipka Expansion Project for a period of 180 days.
Installation of New Raw Water Pump House with associated Pipelines in WMD (Pkg.-1) for upcoming 2000 TPD BOO Oxygen Plant in Bhilai Steel Plant, Bhilai.
Replacement of damaged pipeline in Officer Colony at Kurasia Colliery of Chirimiri Area.
Maintenance of Pipeline with repairing and providing valve in bend at AIIMS Raipur
Assistance required for maintenance of pipeline at Baherabandh UG Mine of Hasdeo Area.
Fabrication, supply and installation of drain cover inside pipeline premise at SERPL Korba
Installtion,Testing and Comissioning C class fire Hydrant pipeline IIM Raipur campus.
Providing, laying, jointing, interconnection, testing and commissioning of Rising Main pipe line of UPVC pipe line 90mm dia class 10kg/cm2 2000M, 100mm dia GI pipe 30M Pipe in length with suitable joints valve specials and all fittings including all allied civil works, providing functional household tap connection (F.H.T.C) 100 nos. in individual. Village Budeni of Along the PWD Road of Block Tilda District Raipur
Miscellaneous repairing work at BMS Office including 01 (one) no bore hole (for drinking water) including pipe line to all Union Office including BMS Office at Vikas Nagar Colony of Kusmunda Area.