Loading…
Loading…
1,925 results • Best match
Laying, Jointing, Testing of Rising main 150mm dia MC GI pipe providing and installation of submersible pumping machinery along with allied accessories Tube well Teora-I
Laying, Jointing Testing of Rising main 150mm dia M.C GI pipe providing and installation of submersible pumping machinery along with allied accessories Tube well Ulehrian-II
Laying, Jointing, Testing of Rising main 150mm dia M.C GI pipe providing and installation of submersible pumping machinery along with allied accessories Tube well Ulehrian-I
GES/PKT/95/2025-26 CERTAIN REPAIR/MAINT/IMPROVEMENT TO EM INSTALLATION i.e. PUMP HOUSE OHTs CI AND GI PIPELINES VARIOUS TYPES OF VALVES AND CONNECTED ITEMS, TUBEWELL, PUMPSET AND CONNECTED ITEMS, WATER DISINFECTION SYSTEM, ATTENDING DAY TO DAY COMPLA
SH Providing Laying Jointing Testing and Carriage of MSERW pipe 200 mm dia for gravity main 510 Rmt from RD 5760 to 6200 mtr and 70 mtr for maintenance work of scheme
SH CO RCC storage tank 15000 litres capacity at Dimti, providing jacketing to RCC storage tank 25000 litres capacity at Bella and providing, laying and jointing of GI pipe in Gravity main
A R M O LWSS Shimla city from Giri river SH P L of API pipe 200 mm dia Scour pipe line at RD 3810 for scouring arrangement of Right side 450 mm dia R Main by P F of Cast Steel Sluice valve 150mm dia Class ASA 300
Restoration of Rain damages of various schemes under JSV Sub Division Jawali in Tehsil Jawali Distt Kangra HP SH - Dismentling and relaying of GI pipe line of various dia in distribution system of 80 mm dia RD 0 to 695 32 mm dia RD 0 to 750 mtrs in
C/o Chamber and Pipeline (PWS) from Banala Khad to Vill-Dochi, in GP- Tikker for the year 2025-26 under APO unit Sainj.
P/F oxygen Gag Pipe line in newly created block for COVID Patients
Laying and Jointing of GI Pipe Line in distribution system Job No 1
C/O Delivery Tank, Control Chamber L/J of pipe line )under PDNA
SH Laying and Jointing of GMS Pipe line in Distribution System Under NABARD
Laying of Rising main Supply and errecton of Pumping machinery distribution and C/O civil works for improvement of LWSS Kinoo Aloh Suhin and LWSS Sidh Chalet
Laying, Jointing, Testing of Rising main 150mm dia G.I. pipe M.C providing and installation of submersible pumping machinery along with allied accessories for (Tube wellNo. 10 Khubber
Providing laying Rising Main, S/E of Pumping Machinery, P/L Distribution system and C/o Civil work for Improvement of T/well No. 51 Mawa Kohlan
Providing laying Rising main, S/E of Pumping Machinery, Laying and Jointing of distribution system and C/o Civil work for improvement of Tubewell at Andora Upper
P/L/J and testing of rising main line of pipe 100mm dia (H/M), Providing and installation and commissioning of submersible pumping machinery with allied accessories).
Operation Running Repair and Maintenance of Pumping Machinery Water Treatment Plant and Rising Main Stage 1st upto Clear Water Tank Complete in all respect for One Year
SH- Supply and Erection of Submersible Pumping machinery with its allied accessories and Laying jointing, and Testing of Rising Main 150mm dia for Tube well No 11
Supply and Erection of submerssible pumping machinery with allied accessories and Laying Jointing Testing of Rising main 150mm dia Medium class GI pipe 4.80mm thickness Twell LodhwanIst
Routine operation and maintenance of various pump houses storage tanks rising main and distribution system of various schemes including distribution of water at tail end of consumers
Laying, Jointing, Testing of G.I. pipe 150mm dia MC rising main providing and installation of submersible pumping machinery along with allied accessories Tube well Paniala CM announcement
Operation, Running, Repair and Maintenance of Pumping Machinery, Water Treatment Plant and Rising Main Stage 1st upto Clear Water Tank Complete in all respect for One Year
Imp and Aug of 4 Nos WSS under Nagrota Bagwan constituency SH_construction of OHT 170000 ltrs cap and 15 mtrs 2 Nos pumphouse Pumping machinery Rising main
Supply and erection of submersible pumping machinery, laying, jointing and testing of 80mm dia G.I. pipe (M) of Rising main for water supply schemes Jassur phase-2nd)
Providing and Laying Rising Main, Supply and errection of Pumping Machinery, Laying of distribution system and C-o Civil works for improvement of Tubewell Andora Lower 1st
(SH C/O Pump House, Laying, jointing and testing of rising main (damaged portion), supply and errection of pumping machinery and providing protection work to pump house).
SH Operation running repair and maintenance of the scheme i e pumping machinery rising main main storage tanks in both stages of the scheme for 6 months
Laying and jointing and testing of GMS pipe in Rising main, supply and errection of pumping machinery including all accessories for WSS Pambra Thaplan, Oel and Tatehra
Supply and errection of pumping machinery with allied accessories and prov laying and jointing of rising main of Ghanahatti Section Phase I Totu Section and Dhami Section
Supply and Erection of submerssible pumping machinery with allied accessories and Laying Jointing Testing of Rising main 150mm dia Medium class GI pipe 4.80mm thickness twell Thapkour
Routine operation and maintenance of various pump houses storage tanks rising main and distribution system of various schemes including distribution of water at tail end of consumers
Laying, Jointing, Testing of Rising main G.I. pipe 125mm dia MC providing and installation of submersible pumping machinery along with allied accessories Tube well Kuryalla CM announcement
SH laying jointing testing and carriage of gravity main G I pipe light grade 40mm dia 5833Rmt from RD 0 to 5833 mtr from storage tank at kajotdhar to storage tank at Singari
SH C/O RCC intake chamber, outlets 9 Nos, silt ejector 7 nos, Laying jointing of Gravity main from RD 0 to 2700 and distribution system from out let No 1 to 2
Laying Jointing and Testing of HDPE pipes in 1st Phase Chhillam Gaad Laying, Jointing and Testing of GI Pipe in Gravity main HDPE pipes and CO Head Weir in 2nd Phase Budha Kedar
(SH Providing laying jointing and testing of MSERW pipe gravity main of various dia and laying jointing and testing of HDPE pipe of various dia in distribution system and c/o Field outlets).
C/o Chamber and Pipeline (PWS) from Badot khad to Vill-Lower Kunch, in GP- Tikker for the year 2025-26 under APO unit Sainj
C/o Chamber and Pipeline (PWS) from Gadhawag Nalla to Vill-Upper Tikker, in GP- Tikker for the year 2025-26 under APO unit Sainj
C/o Chamber and Pipeline (PWS) in Dhanat Nalla to Vill- Dharewda, GP- Dhanat for the year 2025-26 under APO unit Nerwa. (1 No.)
C/o Chamber and Pipeline (PWS) in Chambal Nalla, Vill-Tungla, in GP- Balghar for the year 2025-26 under APO unit Sainj. (1 No.)
C/o Chamber and Pipeline (PWS) in Sholati Nalla to Vill- Korai, GP- Tailor for the year 2025-26 under APO unit Nerwa. (1 No.)
C/o Chamber and Pipeline (PWS) in Kyarnu Nalla to Vill- Tarapur, GP- Pouria for the year 2025-26 under APO unit Nerwa. (1 No.)
C/o Chamber and Pipeline (PWS) in Khanar Nalla, Vill-Sevag, in GP- Mundu for the year 2025-26 under APO unit Sainj. (1 No.)
C/o Chamber and Pipeline (PWS) from Banot Nalla to Vill-Neri Nagar, in GP- Tikker for the year 2025-26 under APO unit Sainj
A/R and M/O to Residential quarters of IIAS at R.P. Niwas Shimla during 2025-26. (SH: Minor repair works i.e. iron gate, wire gauge doors and windows, water tanks, G.I. pipelines, WC seats in Delvilla and Crenchy line of IIAS.)
Repair and Maintenance of PLWSS to Urban water supply scheme Jawali in Tehsil Jawali Distt. Kangra HP SH Dismentling and relaying of GI pipe line of various dia in distribution system of 80mm dia RD 0 to 572 50mm dia RD 0 to 610 32 mm dia RD 0 to 78
A/R and M/O to Residential and Non-Residential building at IIAS, R.P. Niwas Shimla. SH: Repair of compound, toilet of servant quarter, repair of G.I. water supply pipe line, repair of sheet roofing and provision of retaining wall near garage in Observatory Cottage IIAS, R.P. Niwas Shimla (H.P.).
M/R to non residential buildings of IIAS at R.P. Niwas Shimla during 2026-27. (SH: Repair of damaged CI pipe line inside well portion of main building along with repair of open drainage system, provision of damaged flooring and railing in residential areas of campus and other related miscellaneous works).