Loading…
Loading…
2,635 results • Best match
Laying of rising main and Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to Lingipur under BBSR block
Laying of rising main and Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to ARANGA under BANAPUR Block
Laying of rising main and Distribution pipe line of HDPE,GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to Chiramaru under Begunia block.
Laying of pipe line including storage and ancillary work for water supply to uncovered area of Kumurda and adjoining area of Bhuban NAC under State Plan for the year 2019-20.
Laying of Pipe Line for the work Conversion from Ground Source to Surface Source (Missing Links) in Connection with Imp. of W/S to Cuttack City Under CMC (WATCO Section, Killa)
Construction of 4.50 mtr. dia Intake well with external electrification, pumping arrangement, laying of pipe line in uncovered areas and other ancillary works of Purushottampur NAC under State Plan 20-21
Laying of Pipe Line for the work Conversion from Ground Source to Surface Source (Missing Links) in Connection with Imp. of W/S to Cuttack City Under CMC (WATCO Section, CDA)
Supplying all materials, labour, T and P for laying of pipe line, construction of over head tank with ancillary works for PWS to village Lukumbeda in Nuagaon block in Sundargarh district
Laying of Pipe Line for the work Conversion from Ground Source to Surface Source (Missing Links) in Connection with Imp. of W/S to Cuttack City Under CMC (WATCO Section, Store)
Laying of Pipe Line for the work Conversion from Ground Source to Surface Source (Missing Links) in Connection with Imp. of W/S to Cuttack City Under CMC (WATCO Section, Townhall)
Laying of Pipe Line for the work Conversion from Ground Source to Surface Source (Missing Links) in Connection with Imp. of W/S to Cuttack City Under CMC (WATCO Section, Annapurna)
Laying of pipeline in Uncovered and Newly Developed area, Construction of 9.00 Lakhs Ltr., UGR and Procurement of Pump and Motor for Gunupur Water Supply System
Non return valve (vertical) 15 mm., Victor, Pratap, Zoloto or similar (Brass body) (Material used in water pipeline in passenger coaches.)
Improvement of Water supply to Ranapur NAC (Raw water pumping main and Clear water pumping main from WTP to Zonal GSR/ESR)
Supplying and laying of 90mm HDPE pipeline for rising main and distribution system for interconnection with existing distribution line etc. for water supply to various locations of UIHEP, Mukhiguda.
Laying of pipe line, Construction of Valve chamber, Stand Post, House connection and construction of 100,000 Ltr. RCC OGR Piped Water Supply Scheme to Village Taski of Ramanaguda block in Rayagada District
Laying of pipe line, Construction of Valve chamber, Stand Post, House connection and construction of 100,000 Ltr. RCC OGR Piped Water Supply Scheme to Village Tablaguda of Padmapur block in Rayagada District
Laying of pipe line and fitting and fixing of Sluice Valve, Construction of Valve Chamber Construction of 2000 ltr capacity stand alone and FHTC for RPWS to Kuda Mandia under Marshaghai Block
Strengthening of Raw Water Rising Main system from Badabanapur to WTP Khandapada
Intake Arrangement, DI MS Raw water pipe line, raw water reservoir, WTP, MBR, ESR, GSR, CWR Rising main and Distribution main with pumping arrangement and external-internal electrification
Restoration of damaged P.W.D. Road (Barbil Town Road,Road leading from Bakal Hating, Vedprakash Kenth house to Santabahal near Sudhir Mahanta house) by WATCO due to water supply to provide safe and clean drinking water pipe line of WATCO Division
PART A - IRC FOR VARIOUS CROSS COUNTRY PIPELINE ROU MARKERS FOR GAIL ODISHA PIPELINES PART B - IRC FOR VARIOUS CROSS COUNTRY PIPELINE ROU MARKERS FOR GAIL SRIKAKULAM AP
Laying of pipe line, Construction of Valve chamber, Stand Post, House connection and construction of 1,00,000 Ltr. RCC OGR for Piped Water Supply Scheme to Village Nathama under Rayagada Block of Rayagada District.
Laying of Pipe line including Storage and anceillary work for WS to Newly developed uncovered area of Alutuma Harijan Sahi Ward No-11 and Indipur Saara Sahi Ward No-01 of Kamakhyanagar NAC
Laying of pipe line, Construction of Valve chamber, Stand Post, House connection and construction of 50,000 Ltr. RCC OHT Piped Water Supply Scheme to Village SANA SANDHUBADI of Rayagada block in Rayagada District
Construction of pump house, Compound wall, 0.50 Lakh ESR, dosing chlorinator ,Laying of pipe line its ancillary work with 5 years Operation Maintenance for PWS to GHADEIBANDHA under NUAGAON block (BASUDHA 2 Village)
Laying of 450mm dia-7000mtr rising main from 18MLD WTP to Fetcol, Rourkela
Laying of 300mm dia -3000 mtrs rising main Jawahar Nagar to Timber Colony
Provision for laying of water supply pipe line to RITI building along with improvement of water supply to ROTI campus including laying of 250 mm dia Rising Main from Ghatikia MBR to Sampur Pumping Station under WATCO Section, Ghatikia, Bhubaneswar
Replacement and shifting of age old pipe line from clear water rising main at Bighneswara club to Nuasahi at Khannagar including drain cross over and diversion from inside of branch drain to road side at Nuasahi in W.N. 45 of CMC
Replacement of 250mm CI Raw water rising main with 300mm DI pipeline with raw water pumpsets and NH-26 Crossing at Kesinga-Under Special Central Assistance for the FY 2022-23
Provision for laying of pipe line with ancillary works for water supply to under Ground Reservoir of Rehabilitation project for slum and informal settlements under HFA for Economically weaker section(EWS) at Ghatikia, Bhubaneswar
Laying of pipe line in different area of Gandhi Nagar, Medri Sahi, Saraswati Nagar, Sontosi Mandir area, Kailash Nagar, Nandpur road side area under Sunabeda Municipality under State Plan, for the year 2019-20.
Retrofitting of Rural Piped WaterSupply Scheme toVillage Bhagabanpur including laying of pipe line construction of pump house, boundary wal OHT and Internal Electrification and commissioning of Pump and Motor of Bhagabanpur G.P underDhamnagar Block
Laying of Pipe line for 100 Percent coverage in uncovered left out areas in Ward No 11 12 13 14 19 20 27 28 and 29 under PH Section Bareipali in Sambalpur Municipal Corporation
Improvement of Intake system at Kiakata along with construction of CWR and laying of pipeline to tap water from RWSS under State Plan BASUDHA for the year 2023-24
Repairing damaged pipe line from IWSS pipeline near Traffic Point to Diesel filling station and CHP end at Lingaraj OCP, Lingaraj Area.
Intake Arrangement, DI MS Raw water pipe line, raw water reservoir, 130 MLD WTP, MBR, ESR, GSR, CWR Rising main and Distribution main with pumping arrangement and external-internal electrification
Intake Well with Pump House, Raw Water Rising Main, WTP, Clear Water Rising Main, OGR, ESR, Distribution Main, Distribution Pipeline, House Service Connection, External and Internal Electrification, Renovation of Existing WTP, Staff Qtrs. etc.
Procurement of 100mm to 300mm dia size D.I pipes in connection with laying of pipe line in different ULBs under P.H Division Bhanjanagar under State Plan BASUDHA for the year 2023-24 and 2024-25
Construction of 5.00 MLD Intake Well, 1.00 lakh ltr capacity ESR inside Sub-Division, Hospital Campus and laying of pipe line in newly developing areas in different wards with other ancillary works under Athagarh NAC.
Construction of pump house, Compound wall, 0.50 Lakh ESR, dosing chlorinator ,Laying of pipe line and its ancillary work with 5 years Operation and Maintenance for PWS to BADILO under BHAPUR block (BASUDHA 2 Village)
Construction of 1 00 lakh litre capacity RCC UGR including replacement of old distribution Pipeline near Kalyan Mandap pump house for improvement of water supply to Shakti Nagar area, Bargarh Municipality
Annual repair and maintenance of CI/DI water supply pipe line from ATBK area to Madhuban via Sub-station square and Sector-21 area for the year 2024-25 along with re-alignment of water supply rising main with new DI pipe
Laying of 750mm dia DI Rising Main from MBR to Nakagate and connection with existing 600mm dia DI Pipe line for imp of w/s to AIIMS, Pokhariput and imp of 24x7 W/S to Khandagiri Bari, Satyasai Enclave, Aiginia, Kolathia, Ghatikia, BBSR
Residue Disposal Pipe Line Package
Construction, testing, commissioning of 4.45Lakhs ltr. capacity UGR including pumping arrangement and external electrification,laying of pipeline in Newly developed area n system improvement development ofpressure at different placeUnder Malkangiri
Laying of Rising Main,Connection with Existing pipeline,Lowering of pump set in new production well and other ancillary work for RPWS to Akhusing of Akhusing GP under Padmapur Block in Rayagada district
Laying of pipe line including storage and ancillary work for WS to newly developed uncovered area of Maliha Padia Ghasisahi near Soubhagyanagar, Gujuratipada, Gitagram and Canal huda area near Hemasurpada under SP BASUDHA of Angul Municipality
Laying of Pipe Line for the work Conversion from Ground Source to Surface Source (Missing Links) in Connection with IMP. OF W/S TO Cuttack City Under CMC (WATCO Section, Ranihat and Balance part of Townhall