Loading…
Loading…
4,069 results • Best match
Maintenance of pipeline leakages, removal of Blockage from pipeline, Re-winding, lowering and lifting of Pump and motor etc of DTW Schemes with other allied works etc. under DWS Sub-Division Salema under Salema RD Block (Group -II)
Maintenance of pipeline by repairing of leakage, washing of existing pipeline, all other allied works in DTW schemes in different locations under Bokafa RD Block within the jurisdiction of DWS Sub-Division Santirbazar during the year 2025-26
Mtc of pipeline by repairing of leakage and washing of existing pipeline of allied works in DTW schemes in different locations under Bokafa RD Block within the jurisdiction of DWS Sub-Division Santirbazar during the year 2026-27.
R/Mtc. of RWS Schemes/S.H Maintenance and repairing of pipeline leakage, washing of pipeline, maintenance of hydrant and sluice valves of existing Water Supply Schemes at different locations of Rupaichari Sector under Rupaichari Block during 2026-27.
FDr Mtc of flood damaged at Nazila Dambur Diversion scheme during the disaster 2024 25 SH Repairing of RCC dam portion GI distribution system, PVC Distribution pipeline and other allied works within Killa RD Block during FY 2024 25
Construction of 4 nos SBDTW, laying of various dia pipe line, providing and installation of pump motor set at Sudam Para-I, Sudam Para-II, Bagan Para and Munda Para under Rupaichari R.D Block during 2020-21.
Renovation of Pump house and Pipe line at LI Scheme Guchamura under Bamutia RD Block within the jurisdiction of W.R.Sub-Division Mohanpur during the year 2025-26. (Job No. TR/57/Minor Works/WRD-I/2025-26)
Extension and Remodelling in/c repairing of various dia PVC Pipe line of existing DTW Schemes at Amtali Takia Bari, Muslim Para, Debipur, North Haripara and Nandi Para under Hrishyamukh R.D Block during the year 2020-21.
Extension of pipe line in/c other allied works from DTW Chulaibari to Luku Holy cross High school under Laxmicherra VC Bokafa RD Block within the jurisdiction of DWS Sub-Division Santirbazar during the year 2025-26.
Water Supply Scheme under JJM in Sepahijala District. / SH Construction of 1 No Bosting Station of 20,000 Gallon capacity RCC ground reservoir with pump house , Installation of pump - motor , laying of distribution pipe line at Boxanagar R.D
Shifting /re-location of existing UPVC distribution pipe line in MI Schemes under West Pillak and Muhuripur GP falling in proposed right of way road construction of NH- 108A(from Km 0.002 to Km 21.412) .(3rd Call).
Maintenance and repairing of Pipe line leakage, mtc of hydrant, mtc of sluice valve and other allied works at Kailashnagar VC, Dhananjoynagar VC and Shibpur VC under Hrishyamukh R.D Block during the year 2025-26 (FFC Grant).
Construction of 01(one) No semi permanent pump house, providing laying of distribution pipe line, extension of FHTC and other allied works etc. complete at different locations of Teliamura R.D. Block under DWS Division, Kalyanpur (Gr.-VI)
Exten of FHTC under JJM Sch SH Exten of domestic pipe line connec of diff DTW Sch under Atal jaldhara mission within Killa R.D Block under DWS S/D, Killa during the yr 2021-22(Gr-II).
JJM Schemes 2023-24/SH- Extension of UPVC Pipe line and other alied works attached to DTW/innovative Schemes at Madhya Rajnagar, Jubarajnagar west, Radhapur III etc under Jubarajnagar RD Block area Under DWS Sub-Division Panisagar
Drilling and Development of 4 nos SBDTW including construction of pump house, installation of pump set, providing pipe line, providing FHTC and all allied works at Paschim Takka Tulshi-I under Poangbari R.D Block during 2021-22.
Construction of 01(one) No semi permanent pump house, providing laying of distribution pipe line, extension of FHTC and other allied works etc. complete at different locations of Teliamura R.D. Block under DWS Division, Kalyanpur (Gr.-X)
Construction of 15 nos. SBDTW , laying of various dia pipe line , providing and installation of pump motor set including other allied works at different locations under Rajnagar Block under DWS Sub-Division, Barpathari during 2021-22 (Gr.I).
Drilling and Development of 4 nos SBDTW including construction of pump house, installation of pump set, providing pipe line, providing FHTC and all allied works at Paschim Takka Tulshi-II under Poangbari R.D Block during 2021-22.
Exten of FHTC under JJM Schemes SH Exten of domestic pipe line connec of diff DTW Sch under Atal jaldhara mission within Killa R.D Block under DWS S/D, Killa during the year 2021-22(Gr-I).
Water Supply Scheme under JJM in Sepahijala District. / SH Construction of 1 No Bosting Station of 20,000 Gallon capacity RCC ground reservoir with pump house , Installation of pump - motor , laying of distribution pipe line at Boxanagar R.D
Construction of 01(one) No semi permanent pump house, providing laying of distribution pipe line, extension of FHTC and other allied works etc. complete at different locations of Teliamura R.D. Block under DWS Division, Kalyanpur (Gr.-V)
JJM scheme at Sabar Para in Kamalasagar GP under Bishalgarh R.D. Block / Construction of 1 No. semi permanent pump house, laying of C.I., D.I. PVC pipe line, domestic connection/ street hydrant point in/c installation of pump
JJM scheme in Kathalia RD Block within the jurisdiction of DWS Sub-Division Kathalia in Sepahijala District /SH Construction of 1(one) No. semi permanent pump house, laying of D.I. and PVC pipe line and domestic connection
Water Supply Scheme under JJM in Tripura during the year 2022-23/S.H Construction of 10(ten) Nos. semi permanent pump house, providing and laying of distribution pipe line, extension of FHTC, supplying and installation of submersible
REPAIR/ MAINT AND REPLACEMENT AND CLEANING OF CI/ GI/DI/PPR WATER SUPPLY LINE INCLUDING WATER SUPPLY PIPE LINE INCLUDING VARIOUS MAIN CONTROLLING VALVE AND VALVE PIT CHAMBER AT K TO S ZONE AT MILITARY STATION AGARTALA
Maintenance, repairing and relaying of pipe line street hydrant sluice valve chamber of existing DTW schemes at different locations under SNP area within the jurisdiction of DWS Sub-Division Sabroom during the year 2021-22 (Gr-II).
Construction of 01(one) No semi permanent pump house, providing laying of distribution pipe line, extension of FHTC and other allied works etc. complete at different locations of Teliamura R.D. Block under DWS Division, Kalyanpur (Gr.-IV)
Construction of 20Nos. semi permanent pump house, providing and laying of distribution pipe line, extension of FHTC in/c other allied works etc. complete at different locations of Bokafa R.D. Block in South Tripura District (Gr.-I).
Construction of 30000 gallon capacity Semi-underground clear water reservoir with pump house inc laying of distribution pipe line and other electrical works etc. Complete at Rajnagar GP under Kumarghat RD Block during the year 2023-24
Extension and Remodeling in/c repairing of various dia DI/ PVC Pipe line of existing DTW Schemes at Hazarai Para, Marber Para, East Manubankul, Nabiram Para and Baishnabpur under Rupaichari R.D Block during the year 2020-21.
Construction of 01(one) No semi permanent pump house, providing laying of distribution pipe line, extension of FHTC and other allied works etc. complete at different locations of Teliamura R.D. Block under DWS Division, Kalyanpur (Gr.-IX)
Water supply Scheme under JJM of Sepahijala District. / SH Construction of 1 No 20,000 Gallon capacity RCC Under Ground Reservoir with pump house, Installation of pump - motor, laying of distribution pipe line including construction of 4 Nos
JJM scheme at Thakurpara in Khas Chowmuhani GP under Nalchar R.D. Block Construction of 1 No. semi permanent pump house, laying of C.I., D.I. PVC pipe line, domestic connection/ street hydrant point in/c installation of pump
Maintenance of CI/DI/PVC pipe line in/c construction of Sluice Valve chamber, hydrant post platform etc. complete at different existing DTW schemes of Dumburnagar R.D Block under DWS Sub-Division Gandacherra.(Gr-I) (2nd Call)
Water Supply Scheme under JJM in Sepahijala District. / SH Construction of 1 No Bosting Station of 20,000 Gallon capacity RCC ground reservoir with pump house , Installation of pump - motor , laying of distribution pipe line at Boxanagar R.D
JJM scheme in Kathalia RD Block within the jurisdiction of DWS Sub-Division Kathalia in Sepahijala District /SH Construction of 1(one) No. semi permanent pump house, laying of D.I. and PVC pipe line and domestic connection
Water supply scheme under JJM of Sepahijala District / SH Construction of 1 No. 20,000 Gallon capacity RCC Underground Reservoir with pump house, Installation of Pump-Motor, laying of distribution pipe line including construction of 4 Nos. SBDTW
Retrofitting of existing water supply scheme under JJM in Sepahijala District/ Washing , repairing of existing UPVC, CI, DI pipe line including all allied works at different DTW schemes under Bishalgarh RD Block under DWS Sub-Division, Bishramganj
JJM scheme at Gobin para in East Ratanpur under Jampuijala R.D. Block / Construction of 1 No. semi permanent pump house, laying of C.I., D.I. PVC pipe line, domestic connection/ street hydrant point in/c installation of pump
Construction of 4 nos SBDTW, laying of various dia pipe line, providing and installation of pump motor set at Kentamani Para-I, Kentamani Para-II, Rabindranath Para and Satrai Para under Rupaichari R.D Block during 2020-21.
Construction of 01(one) No semi permanent pump house, providing laying of distribution pipe line, extension of FHTC and other allied works etc. complete at different locations of Teliamura R.D. Block under DWS Division, Kalyanpur (Gr.-VII)
JJM scheme in Kathalia RD Block within the jurisdiction of DWS Sub-Division Kathalia in Sepahijala District /SH Construction of 1(one) No. semi permanent pump house, laying of D.I. and PVC pipe line and domestic connection
Running and Mtc. of JJM/RWS Scheme/ Repairing and Mtc. of existing C.I, D.I and UPVC pipe line leakages, block washing, sluice valve etc. in/c some other allied works within the jurisdiction of Nalchar RD Block
JJM scheme in Kathalia RD Block within the jurisdiction of DWS Sub-Division Kathalia in Sepahijala District /SH Construction of 1(one) No. semi permanent pump house, laying of D.I. and PVC pipe line and domestic connection
Construction of 01(one) No semi permanent pump house, providing laying of distribution pipe line, extension of FHTC and other allied works etc. complete at different locations of Teliamura R.D. Block under DWS Division, Kalyanpur (Gr.-II)
Construction of 05(five) Nos new Septic tank including pipe line for Type-II staff quarters and sinking of Mini Deep Tube Well at the Khowai Sub-Jail under Khowai Sub Division as per PWD SoR-2023
Construction of 01(one) No semi permanent pump house, providing laying of distribution pipe line, extension of FHTC and other allied works etc. complete at different locations of Teliamura R.D. Block under DWS Division, Kalyanpur (Gr.-VIII)
FDR/SDRF/Restoration of Betekha DTW and Noalkhalipara L.I scheme under Kalyanpur R.D Block, W.R Sub-Division Teliamura during the year 2024-25/SH_- Repairing of pump house _ Pipe line distribution system and other allied works etc.
Maintenance and repairing of Pipe line leakage, Washing, mtc of hydrant including of sluice valve chamber for better functioning of flood affected water Supply Schemes at different locations at Kalachara Sector under Satchand Block during 2024-2025.