Loading…
Loading…
4,069 results • Best match
Shifting, Re-Alignment and Restoration of damaged Water Supply Pipelines and Allied Water Supply Assets during the year 2025-26 within the jurisdiction of PWD(DWS), Chawmanu Sub-Division.(Gr-III)
Repairing of RCC bridge at Karaicharra over Hydel pipeline network at New Gomati VC, Karbook RD Block
Functional repair of SWTP Gobindopur in terms of electrical, mechanical Pipeline works under DWS Sub-Division, Kailashahar
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Khowai (Gr.-II)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Khowai (Gr.-III)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Padmabil (Gr.-III)
Extension of Pipeline at existing SBDTW at Gunadhar Para under Karbook RD Block during the year 2021.
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Tulashikhar (Gr.-II)
Extension of Pipeline at existing SBDTW at Alindra Para under Karbook RD Block during the year 2021.
CARRYING OUT GAS QUALITY ANALYSIS THROUGH NABL ACCREDITED LAB FOR GAIL TRIPURA PIPELINE SYSTEM FOR TWO YEARS
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Tulashikhar (Gr.-III)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Teliamura (Gr.-II)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Teliamura (Gr.-III)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Kalyanpur (Gr.-II)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Teliamura (Gr.-I)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Mungiakami (Gr.-I)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Tulashikhar (Gr.-I)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Padmabil (Gr.-II)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Mungiakami (Gr.-III)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Padmabil (Gr.-I)
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Kalyanpur (Gr.-III)
Installation of new pipeline connection for newly installed submersible at different places under Ward No-27, AMC
Extension of pipeline and providing FHTC and other allied works under DWS sub-division Khowai (Gr.-I)
Drilling Dev 8 nos. SBDTW, Const 2 nos 20k Gallon capacity circular RCC Water Reservoir, Pump House, providing installation of Pump Motor, providing laying pipeline, domestic connection within the jurisdiction of DWS Division, Dharmanagar/ Gr.-I
JJM scheme at Fatik Sagar in Bejimara GP under Kathalia R.D. Block / Construction of 1 No. semi permanent pump house, laying of C.I., D.I. and PVC pipe line, domestic connection/ street hydrant point in/c installation of pump
NRDWP/ RWS/ RIDF/ NITI Ayog Scheme during the year 2019-20/ SH - Providing extension of pipe line (PVC) and providing household water supply connection etc. against different schemes in/c all allied works under DWS Sub Division, Dasda.
Extension and Remodeling in/c repairing of various dia DI/ PVC Pipe line of existing DTW Schemes at Sanikhola, West Pipariakhola, Bhatkhola, Wangchhara, Manai Reang Para, Jashmura, Udaihari Para and Hetalia under Rajnagar R.D Block during 2020-21.
Construction of 4 nos SBDTW, laying of various dia pipe line, providing and installation of pump motor set at Kejori Mog Para, Vadra Tila, Surendra Baruah Para and Ashwini Chowdhury Para under Rupaichari R.D Block during 2020-21.
Retrofitting of JJM Scheme of Sepahijala District. / SH Construction of 1 No Bosting Station of 20,000 Gallon capacity RCC ground reservoir with pump house , Installation of pump - motor , laying of distribution pipe line at Uttar Para under Rahimp
Extension and Remodelling in/c repairing of various dia DI/ PVC Pipe line of existing DTW Schemes at Kusharghat, Saha Pathar, West Pilak (Saha Para) and Niru Kumar Para under Jolaibari R.D Block during the year 2020-21.
Sinking of 06 Nos. SBDTW by Contractor Mini Rig and providing of distribution pipe line, electrical accessories, construction of masonry chamber,etc. commissioning of the tube well complete in different location under DWS Sub-Division KLS Gr-IV
Urgent shifting of PVC pipe line LI scheme at South Lowgang at Lowgang GP under Bagafa R.D. Block during the year 2023-24/Shifting and Re-construction of pump house, installation of pump motor and other allied works.
Running and Mtc. of RWS Scheme/ Repairing and Mtc. of existing C.I, D.I and UPVC pipe line leakages, block washing, sluice valve etc. in/c some other allied works within the jurisdiction of DWS Sub-Division Melaghar under
Water supply Scheme under JJM of Sepahijala District. / SH Construction of 1 No 20,000 Gallon capacity RCC Under Ground Reservoir with pump house, Installation of pump house, Installation of pump - motor, laying of distribution pipe line at Kathalia
Retrofitting of JJM Scheme of Sepahijala District. / SH Construction of 1 No Bosting Station of 20,000 Gallon capacity RCC ground reservoir with pump house , Installation of pump - motor , laying of distribution pipe line at Thanamura under Uttar K
Construction of 4 nos SBDTW, laying of various dia pipe line, providing and installation of pump motor set at Chelafru Mog Para, Santi Palli-I, Santi Palli-II and Sukhidhan Para under Rupaichari R.D Block during 2020-21.
Running and Mtc. of JJM/RWS Scheme/ Repairing and Mtc. of existing C.I, D.I and UPVC pipe line leakages, block washing, sluice valve etc. in/c some other allied works within the jurisdiction of DWS Sub-Division Melaghar
Maintenance of pipe line by repairing of leakage and washing of existing DTW schemes Domestic Water supply connection to individual house hold in different locations of BMC area under DWS Sub-Division Belonia during the year 2025-26.
Running and Mtc. of JJM/RWS Scheme/ Repairing and Mtc. of existing C.I, D.I and UPVC pipe line leakages, block washing, sluice valve etc. in/c some other allied works within the jurisdiction of DWS Sub-Division Takarjala
Construction of 15 nos. SBDTW , laying of various dia pipe line , providing and installation of pump motor set including other allied works at different locations under Rajnagar Block under DWS Sub-Division, Barpathari during 2021-22 (Gr-II).
Running and Mtc. of JJM/RWS Scheme/ Repairing and Mtc. of existing C.I, D.I and UPVC pipe line leakages, block washing, sluice valve etc. in/c some other allied works within the jurisdiction Of DWS Sub-Division Bisramganj
Construction of 5 nos SBDTW, laying of various dia pipe line, providing and installation of pump motor set at Raja Bari-I, Raja Bari-II, Golachipa, Malum Bari and Kesoi Bari under Hrishyamukh R.D Block during 2020-21.
Drinking water arrangement to the Magzine Para Ambassa MC Area Ward no 14 under DWS Sub Division Ambassa SH laying of PVC pipe line alongwith connection of domestic connection under DWS Sub- Division, Ambassa Dhalai Tripura.(Deposit work)
Water supply Scheme under JJM of Sepahijala District. / SH Construction of 1 No 20,000 Gallon capacity RCC Under Ground Reservoir with pump house, Installation of pump house, Installation of pump - motor, laying of distribution pipe line at Kathalia
JJM Scheme under Kathalia Block/ SH Construction of 8 (Eight) Nos. Small Bore Deep Tube Well (SBDTW) (125mm X 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within
Construction of 1 (one) Nos of Masonry Well in/c PVC water storage over head tank, pump house, pipe line and installation of pump motor etc complete at Dhan Chowdhury Para of Rajdhar VC under Chawmanu RD Block
Running and Mtc. of JJM/RWS Scheme/ Repairing and Mtc. of existing C.I, D.I and UPVC pipe line leakages, block washing, sluice valve etc. in/c some other allied works within the jurisdiction of DWS Sub-Division Bisramganj
Extension and Remodelling in/c repairing of various dia DI/ PVC Pipe line of existing DTW Schemes at West Jolaibari (Sahid Bedi), Bagan Tilla and Mini SWTP at Kakulia under Jolaibari R.D Block during the year 2020-21.
Sinking of 06 Nos. SBDTW by Contractor Mini Rig and providing of distribution pipe line, electrical accessories, construction of masonry chamber,etc. commissioning of the tube well complete in different location under DWS Sub-Division KLS Gr-II
Water supply Scheme under JJM of Sepahijala District. / SH Construction of 1 No 20,000 Gallon capacity RCC Under Ground Reservoir with pump house, Installation of pump house, Installation of pump - motor, laying of distribution pipe line at Kathalia