Loading…
Loading…
1,922 live1,053 closing this weekmost from PHE and E-IN-C BRANCH - MILITARY ENGINEER SERVICES
1,922 results • Best match
The financial year 2026- 27 water supply branch chemicals
Operation And Maintenance Of Water Supply Systems - Complete System
Operation And Maintenance Of Water Supply Systems - Complete System
Operation And Maintenance Of Water Supply Systems - Complete System
Operation And Maintenance Of Water Supply Systems - Complete System
Anti Freezing System for water supply in High Altitude
Laying of uPVC Pipe Channel 160 mm o/d 4kg/cm2 including haudie, Repair of Existing S and S Tank 1 no. Size 123.00 x 93.00 x 0.76 mtr, RCC S and S Well 2.0 mtr dia, New Pump Chamber 6.10x4.88 m, Repair of Existing 4 Nos Filter bed 9.00 mtr dia
Part-A Distribution pipe line, All civil works, supplying and laying PVC pipes, sluice vales and distribution system etc. House hold connection , etc. complete in all respects.
CONSTRUCTION OF SOLAR DRINKING WATER SUPPLY SCHEME AT SUBHACHANI SAMSAD OF GARALBARI GP UNDER SADAR DEVELOPMENT BLOCK (15th FC Tied, ID- 113056766)
CONSTRUCTION OF SOLAR DRINKING WATER SUPPLY SCHEME AT HATPUKURI SAMSAD OF GARALBARI GP UNDER SADAR DEVELOPMENT BLOCK (15th FC Tied, ID-113031546)
Relaying of pipeline at Bahu Khedail and KismatKhedail village of Pratapnagar Water Supply Scheme Under Arambagh Sub-Division under Hooghly Division,P.H.EDte
Pdg. and laying of 225mm GSB, 200mm WBM, 50mm DBM, 30mm BC, Water Supply Scheme, Providing Sewerage Scheme, Storm Water Drainage System
Restoration of Bituminous Road for Laying Distribution Pipelines at Zone-2 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Bituminous Road for Laying Distribution Pipelines at Zone-5 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Bituminous Road for Laying Distribution Pipelines at Zone-7 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Bituminous Road for Laying Distribution Pipelines at Zone-6 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Concrete Road for Laying Distribution Pipelines at Zone-6 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Bituminous Road for Laying Distribution Pipelines at Zone-4 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Bituminous Road for Laying Distribution Pipelines at Zone-3 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Bituminous Road for Laying Distribution Pipelines at Zone-1 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Attending breakdown of Garden water supply Branch Pipeline system and Construction water supply system including pipelines, valves, chambers and other associated works at Anushaktinagar, Mumbai.
Purchase of Water Supply Maint Stores PPR Gate Valves and
PROCUREMENT OF WATER SUPPLY ITEMS FOR B GOWDAGERE GRAMA PANCHAYATH
Making Water Supply Arrangement At Talni Tq Sengaon Dist Hingoli
Water Supply Network Work at Unplanned Area of Khoraj GIDC
To supply TCL powder and Alum for Water Supply Dept
Supply of Water Supply Material for financial year 2026-27
Supply of cable to water supply section in CMC madanayakanahalli
Polyethylene Pipes for Water Supply conforming to IS 4984 (Q3)
KIIFB-AUGMENTATION OF ARWSS TO KANJIRAPPALLY,ELIKKULAM AND CHIRAKKADAVU PANCHAYATS IN KOTTAYAM DISTRICT-PACKAGE-IV-Supply and laying 350mmDI Gravitymain in Kanjirappally-Manimala KRFBroad from Thamarakkunnu bridge to Mannamplavu junctionPipeline Work
Work of Construction of Intermediate CWPH at Kotra Baseri laying of Clear Water transmission main From Kotra to Naroli Nadbai via junction 2 at Naroli IPS Nadbai Nagar Ramgarh Kishangarhbas Tijara Jairoli and Bhiwadi based on HAM model under JJM
Work for Construction of Intake well inside Chambal River including Approach Bridge construction of RWR including all works required for inlet inside RWR outlet system from RWR to outlet chamber WTP CWR RWPH and allied works Package 1 under JJM
CONSTRUCTION OF SOLAR DRINKING WATER SUPPLY SCHEME AT FODOR PARA SAMSAD OF GARALBARI GP UNDER SADAR DEVELOPMENT BLOCK (15th FC Tied, ID-112633721)
Restoration of Concrete Road for Laying Distribution Pipe Lines at Zone-4 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Concrete Road for Laying Distribution Pipe Lines at Zone-7 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Concrete Road for Laying Distribution Pipe Lines at Zone-3 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Concrete Road for Laying Distribution Pipe Lines at Zone-5 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Concrete Road for Laying Distribution Pipe Lines at Zone-2 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Restoration of Concrete Road for Laying Distribution Pipe Lines at Zone-1 within Chakdaha Municipality for Proposed Water Supply Scheme under AMRUT 2.0
Road Restoration of BANGURA Water Supply Scheme under Harishchandrapur-I Block under Malda Division, PHE Dte. in the district of Malda. (2nd Call)
M and R to combined WSS of Shiroli, Gokul Shirgaon and Kagal Hatkanangle Five Star Industrial Area Providing the services of skilled unskilled persons for running the WSS at Booster Pumping Station Shiroli and ESR Gokul Shirgaon for one year
Lashkar Jalkendrashi Salgna Upsagruhe 2 Varshe Kalavadhikarita Chalvine v Dainandin Dekhbhal Durustichi Kame Karane.
Drinking water supply and pipeline extension work on Purana Sagra Karbala Road in Ward No 06
Improvement of water supply with lane level water control of 24x7 water supply DMA-1 Nuagaon under WATCO Section Rairangpur under WATCO Division Baripada in Mayurbhanj District
Improvement of water supply with lane level water control of 24x7 water supply DMA-4 Anladuba under WATCO Section Rairangpur under WATCO Division Baripada in Mayurbhanj District
Work of construction of CWR and Block CWPH at various locations for clusters laying of transfer main from block PS to block CPS rising main from block CPS to Block ESRs, construction of ESRs laying of cluster distribution mains CABP Pck 3 under JJM
Annual Maintenance of Water Supply Scheme i.e. Makrouli Khurd District Rohtak for 12 Months from the Date of Commencement (Pumping Machinery and Electrical Work)
CONSTRUCTION OF SOLAR DRINKING WATER SUPPLY SCHEME AT HARIR BARI, SOVAGANJ SAMSAD OF GARALBARI GP UNDER SADAR DEVELOPMENT BLOCK (15th FC Tied, ID-113027226 )